Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical PLOT NO 4 NAYA GAON HARIPUR KANWALI P O SEEMADWAR DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
10 Sept 2026, 2:00 pmClosed
MANAGER WCS
ADM4
Renovation of residential buildings in BHEL Township, Haridwar
2026_BHEL_64394_1
BHEL/HEEP/WCS/26-27/202600171 Dt. 27.08.2026
Open Tender
Civil Works
Percentage
180 days
BHEL Twonship Haridwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.4 L
10 Sept 2026
27 Aug 2026
10 Sept 2026
27 Aug 2026
10 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish, earth, manure or sludge and excavated rocks:: Lime, moorum, building rubbish:1 km (1.1.1/62) | 200 | cum | 66.23 | ₹13,246 |
| 2 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
level : 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 40
mm nominal size) | 10 | cum | 4,404.05 | ₹44,040.5 |
| 3 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size) | 25 | cum | 3,888.2 | ₹97,205 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). Unit:cum
( S.l.No. : 5.3) Page No.: 96 | 75 | Cum | 5,494.55 | ₹4,12,091.25 |
| 5 | Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Weather shade, Chajjas, corbels etc., including edges Unit:sqm (5.9.5/97) | 1,350 | Sqm | 262.25 | ₹3,54,037.5 |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . :Cold twisted bars ( S.l.No. : 5.22.3) Page No.: 99 | 3,950 | Kg | 62.25 | ₹2,45,887.5 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : 6.4.2 Cement mortar 1:6 (1 cement : 6 coarse sand) | 135 | cum | 3,876.15 | ₹5,23,280.25 |
| 8 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 22,500 | Kg | 77.9 | ₹17,52,750 |
| 9 | Providing gola 75 x75mm in cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : :In 75x75mm deep chase.( S.l.No. : 12.21.1)/207) | 5,400 | Metre | 109.05 | ₹5,88,870 |
| 10 | Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm nominal size) over P.V.C. sheet 1 m x1 m x 400 micron, finished with 12 mm cement plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat cement, rounding the edges and making and finishing the outlet complete. ( S.l.No. : 12.22/ 207) | 200 | each | 148.75 | ₹29,750 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 27.78 MB
BOQ_69815.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .