Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97,950Accepted-AOC | L1 | Accepted-AOC Li | |
| 2 | L2₹1.1 L+₹15,018 (15.3%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹97,950
EMD Value
₹2,449
Closing Date
5 Aug 2023, 6:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER MI SUB DIVISION MANANTHAVADY
General Civil Work
2023_Irrig_589733_1
IRR/IA/TR/3152/2023_5_2_1/1
Open Tender
Civil Works - Others
Item Rate
90 days
Mananthavady Palakkuly kaniyaram
Please refer Tender documents
8 documents required · 8 mandatory
₹555
Yes
₹2,449
Yes
24 Aug 2023
24 Jul 2023
9 Aug 2023
24 Jul 2023
5 Aug 2023
24 Jul 2023
Amount
Desilting and cutting tree branches
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
MOHAMMED FAVAZ
Bidder Name
MOHAMMED FAVAZ
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_872435.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .