Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC 18 DHRUBESH CHATTERJEE LANE UTTARPARA HOOGHLY 712258 | UTTARPARA | HOOGHLY | WEST BENGAL | 712258 | L1 | Accepted-AOC lowest | |
| 2 | L2₹4.6 L+₹4,297.63 (0.95%)Rejected-Finance 1 6 FAKIR CHAKRABORTY LANE | L2 | Rejected-Finance 2nd lowest | |
| 3 | L3₹4.6 L+₹10,517.64 (2.33%)Rejected-Finance NAMOPARA PURULIA | PURULIA | PURULIA | WEST BENGAL | 723101 | L3 | Rejected-Finance 3rd lowest |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
12 Apr 2024, 11:00 amClosed
The Executive Engineer, PMD,PHE.Dte
Office of the Executive Engineer Purulia Mechanical Division,PHE.Dte Ranchi Road,Purulia.
Repairing of one no. 150 KVA HT AVR at Jhalda Substation under Purulia Mechanical Sub-Division, PHE Dte.
2024_PHED_681655_5
22/ EE/PMD/PHED OF 2023-2024
Open Tender
MECHANICAL
Item Rate
30 days
Purulia
Please refer Tender documents.
5 documents required · 5 mandatory
₹8,000
Yes
11 Nov 2024
12 Mar 2024
15 Apr 2024
12 Mar 2024
12 Apr 2024
12 Mar 2024
Amount
Testing and inspection of 150 KVA HT AVR (physical checking, IR value, Magnetic balance,Turn ratio, core loss,copper loss, High voltage test, double voltage double frequency, vector group, OTI, WTI,Buchholz Relay operational test)
Disconnection of power line of the damaged 150 KVA HT AVR, complete drained out of AVR oil, opening of the Top cover,then disconnect internal connection in-between regulator & auto step up-down core coil assembly and buck boost unit for taking out for fault finding.
Loading, carrying the auto step up-down core coil assembly & buck boost unit from the above site to Kollkata work shop by hired vehicle and unloading the same as per direction. ( approx 350 km)
Lifting of Core Coil Assembly from tank inside by the help of chain pulley block as per direction
Removing of core clamp & yock plate, then dismantling of HT & LT winding of Buck Boost unit of HT AVR
Auto Step Up-Down unit of HT AVR “B” phase winding construction are made with 4 nos. HT coil & 1 no LT coil. Complete HT & LT coils conductor insulation replaced by new insulation
Charges for complete Replacement of copper of 2 Nos. HT coil (B) out of 4 Nos. HT Coil & 1 No. LT Coil of Step UP-Down Transformer ( (this includes the deduction cost of old and damaged copper material of 42 kg @ 450.00 per kg)
Re-insulation of 2 Nos. LT tertiary coil of Auto Step Up Down Transformer
Winding charges of 12 Nos. HT cross over coil and 3 Nos. LT tertiary coil of Auto Step Up- Down Transformer
Supply & Replacement of all insulating materials by new insulating materials like as craft paper, presspan, cotton tape, sleevings
Supply all kinds of gaskets for AVR, Oil Seals for HV & LV bushing
Changing of all kinds of gaskets and Bushing as per sample of Transformer with the aid of necessary tools by engaging skilled and unskilled labours as per direction of EIC
Replacement of all Oil Seals, Gaskets of HV & LV bushings (AVR)
Preparation of Core assembly and after that reassembly of HV & LV coils for Auto Step Up Down Transformer
Jointing of Cu. Busbar (HV, LV & Tertiary) Using of brazing materials
Charges for drying the core and coil assembly through a very efficient drying oven which ensures extraction of moistures to zero level.
Primary testing of core & winding assembly before tanking
Supply of new transformer oil as per IS 335-1993 at site as per direction including carrying and transportation complete (make Power oil/approved make)
Oil Filteration (AVR + VLE unit)
cleaning core-coil assembly & inside the tank, filling new & old Transformer Oil inside the tank chamber & top up & completed all the connections
Checking of control circuit
Transportation of the repaired unit (approx 350 Km) by hired vehicle including loading, unloading
Assembling the core coil assembly of Auto Step Up-down & Buck Boost Unit by the help of Chain pully block at site
Testing of the HT AVR (IR value, Magnetic balance,Turn ratio, core loss,copper loss, High voltage test, double voltage double frequency, vector group, OTI, WTI,Buchholz Relay operational test)at site before power charging
Installation of the transformer at its position, making all electrical connections and testing commissioning the same
Add GST @ 18%
Add CESS @ 1%
H.K.DAS & CO.
COMBINE ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .