Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-Finance | ₹6.3 L | L1 | Accepted-Finance L1 Accepted |
| 2 | L2₹6.5 L+₹13,615.75 (2.15%)Accepted-Finance | ₹6.5 L+₹13,615.75 (2.15%) | L2 | Accepted-Finance L2 Accepted |
| Sl No | Description | Qty | Unit | K.K. UMMER KOYA L2 | MUHAMMED SHAHEEM .V L1 |
|---|---|---|---|---|---|
| 1.00Maintenance work | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,450 | sqm | 15 ₹21,750 Lowest | 15.01 ₹21,764.5 |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1,105 | sqm | 8 ₹8,840 | 7.66 ₹8,464.3 Lowest |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 75 | sqm | 64.5 ₹4,837.5 | 62.64 ₹4,698 Lowest |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | 325 ₹1,625 | 311.85 ₹1,559.25 Lowest |
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 5 | each | 578 ₹2,890 | 558.19 ₹2,790.95 Lowest |
| 1.01 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | 785 ₹3,925 | 758.94 ₹3,794.7 Lowest |
| 1.01 | OD39021/2026-2027:Engaging man coolie for cleaning the premises of the office | 80 | Day | 888 ₹71,040 Lowest | 893.61 ₹71,488.8 |
| 1.01 | OD39020/2026-2027:Engaging Plumber/fitter for plumbing works | 45 | Day | 1,035 ₹46,575 Lowest | 1,086.18 ₹48,878.1 |
| 1.01 | OD39018/2026-2027:Engaging carpenter for repairing works | 30 | Day | 980 ₹29,400 Lowest | 989.2 ₹29,676 |
Tender Value
Refer Docs
EMD Value
₹17,573
Closing Date
25 Jul 2026, 5:00 pmClosed
Assistant Executive Engineer
O/o PWD, Buildings sub division, Parappanangadi
GENERAL-RUNNING CONTRACT WORK- 2026-27-Periodical Maintanance of Various Buildings under PWD Buildings Section Kondotty-General Civil Work
2026_PWD_861336_1
D3/PWD/BLDG/TR/8524/2026 Dt.18-07-2026
Open Tender
Civil Works - Buildings
Item Rate
365 days
Kondotty
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,550
₹17,573
3 Sept 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
25 Jul 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance work | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.003 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | - | sqm | - | - |
| 1.004 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.005 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - |
| 1.006 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.007 | OD39021/2026-2027:Engaging man coolie for cleaning the premises of the office | - | Day | - | - |
| 1.008 | OD39020/2026-2027:Engaging Plumber/fitter for plumbing works | - | Day | - | - |
| 1.009 | OD39018/2026-2027:Engaging carpenter for repairing works | - | Day | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1456675.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1456675.xls
BOQ • 0.33 MB
BID.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .