Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-CDR Amount is only Rs.1500/- instead of 1520 |
Tender Value
₹76,000
EMD Value
₹1,520
Closing Date
22 Nov 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer IFCD Ganderbal
IFCD Giraj Ganderbal
Construction of lining wall on Kumar Mohalla at Wayil on Branch of Old Ari Canal
2022_IFC_195420_6
e-NIT No. 16 of 2022-23
Open Tender
Civil Works
Item Rate
10 days
Ganderbal
Please refer Tender documents.
3 documents required · 3 mandatory
₹100
Executive Engineer IFCD Ganderbal
₹1,520
23 Nov 2022
10 Nov 2022
23 Nov 2022
10 Nov 2022
22 Nov 2022
10 Nov 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 m from cutting edge in all Kinds of soil.
CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Cement Concrete ( Cast -in -Situ ) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
FORM WORK Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases of columns etc. for mass concrete.
Carriage of material by mechanical transport inculding loading , unloading and stacking , from different sources upto site of work :
Sand from gbl avg. lead of 08 Km’s.
20mm stone agg from wayil avg. lead of 03km’s.
40mm stone agg from wayil avg. lead of 03km’s.
IRSHAD AHMAD
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .