Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.1 CrAccepted-AOC NEAR S R PETROL PUMP SAORO GATE KASGANJ | KASGANJ | UTTAR PRADESH | ₹2.1 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹2.8 CrRejected-Finance | ₹2.8 Cr | L-2 | Rejected-Finance ADMITTED |
| 3 | L-3₹3.1 CrRejected-Finance | ₹3.1 Cr | L-3 | Rejected-Finance ADMITTED |
| 4 | L-4₹3.4 CrRejected-Finance | ₹3.4 Cr | L-4 | Rejected-Finance ADMITTED |
| Sl No | Description | Qty | Unit | MOHAMMAD AWAIS L2 | PURNAGIRI CONSTRUCTION CO. PVT. LTD. L4 | M/S ALLIANCE CONSTRUCTIONS L3 | GSB DEVELOPERS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Providing, laying and placing of Nylone Crates size (1.0mx1.0mx1.0m) filled with local sand/local earth in New E.C Bags. including all cost of materials,labours, T & P etc. Required for proper complition of work but excluding cost of G.S.T | 8,607 | Nos. | 485 ₹41.7 L | 775 ₹66.7 L | 604 ₹52.0 L | 450 ₹38.7 L |
| 2.00 | Providing, laying and placing of Polypropylene (PP) Gabion Rope Case size (1.80x1.80x0.50)M filled with local sand/earth in HDPE Geo Bags made of 200 GSM woven fabric confirming to 15351(2015) of size 1.00m X 0.75m including all cost of materials labour and T & P with all taxes etc. But excluding cost of GST. required for proper complition of work | 4,294 | Nos. | 3,050 ₹1.3 Cr | 3,562 ₹1.5 Cr | 2,794 ₹1.2 Cr | 1,750 ₹75.1 L |
| 3.00 | Providing, laying and packing 20-40 kg.boulder inmechanically woven double twisted Hexagond shaped wire mesh gabion box/crate of size 3.00 x1.50 x 1.00 M mesh size 10 cm x 12 cm 10 SWG G.I. wire as directed by Engineer in charge & also including all cost of material, labour & T&P etc. | 407 | Nos. | 11,500 ₹46.8 L | 11,776 ₹47.9 L | 14,360 ₹58.4 L | 10,000 ₹40.7 L |
| 4.00 | Supplying and Laying of 200 GSM Geotextile sheet in river bank & Spurs including all cost of labour material, and T&P etc with all taxes but excluding cost of G.S.T required for proper completion of work as per Engineer-in-charge. | 612 | M2 | 75 ₹45,900 | 90 ₹55,080 | 111 ₹67,932 | 50 ₹30,600 |
| 5.00 | Collection ,Laying sand on slopes &top of Shank including all cost of labour material, and T&P etc with all taxes but excluding cost of G.S.T required for proper completion of work as per Engineer-in-charge. | 91.8 | M3 | 150 ₹13,770 | 202 ₹18,543.60 | 240 ₹22,032 | 200 ₹18,360 |
| 6.00 | Supply ,Laying and Dry boulder 20-40 kg. in Pitching including all cost of labour material, and T&P etc.with all taxes but excluding cost of G.S.T required for proper completion of work as per Engineer-in-charge. | 367.2 | M3 | 2,050 ₹7.5 L | 2,070 ₹7.6 L | 2,500 ₹9.2 L | 1,780 ₹6.5 L |
| 7.00 | Providing, laying and placing of R.C.C (M-20 grades) porcupine and filling jhankar or jhau in water with binding of murga jali including all cost of materials, labours, T & P with all taxes etc. Required for proper complition of work. | 912 | per no. | 5,450 ₹49.7 L | 5,600 ₹51.1 L | 6,830 ₹62.3 L | 5,000 ₹45.6 L |
| 8.00 | Providing and filling jhakhar or jhau in water and placing in position involving carraige upto 5km without boat in dry including all cost of materials,labours, T & P etc. Required for proper complition of work but excluding cost of G.S.T | 1,942.56 | m3 | 225 ₹4.4 L | 320 ₹6.2 L | 390 ₹7.6 L | 200 ₹3.9 L |
| 9.00 | 10 SWG wire in bracing porcupine sets of studs & apron including all cost of material, labour, T&P etc. | 568.42 | kg | 80 ₹45,473.60 | 90 ₹51,157.80 | 100 ₹56,842 | 75 ₹42,631.50 |
| 10.00 | RBM for constructing of Shank including all lead and lift with all taxes but excluding cost of G.S.T required for proper completion of work as per Engineer-in-charge. | 1,782.08 | m3 | 90 ₹1.6 L | 170 ₹3.0 L | 180 ₹3.2 L | 90 ₹1.6 L |
Tender Value
₹4.1 Cr
EMD Value
₹8.2 L
Closing Date
23 Mar 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
SE VTH CIRCLE IW BAREILLY.
Janpad pilibhit main sharda nadi ke dayein tut par sththit sanedi tutbundh par purv nirmit spur sankhya 28 evam 29 ki punarsthapna ththa spur sankhya 28 se 30 ke madhye purcupine lagane ka karye.
2026_UPIDC_1122612_2
06/SE/2025-26
Open Tender
Civil Works
90 days
PILIBHIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
Yes
₹8.2 L
Yes
1 Apr 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
Providing, laying and placing of Nylone Crates size (1.0mx1.0mx1.0m) filled with local sand/local earth in New E.C Bags. including all cost of materials,labours, T & P etc. Required for proper complition of work but excluding cost of G.S.T
Providing, laying and placing of Polypropylene (PP) Gabion Rope Case size (1.80x1.80x0.50)M filled with local sand/earth in HDPE Geo Bags made of 200 GSM woven fabric confirming to 15351(2015) of size 1.00m X 0.75m including all cost of materials labour and T & P with all taxes etc. But excluding cost of GST. required for proper complition of work
Providing, laying and packing 20-40 kg.boulder inmechanically woven double twisted Hexagond shaped wire mesh gabion box/crate of size 3.00 x1.50 x 1.00 M mesh size 10 cm x 12 cm 10 SWG G.I. wire as directed by Engineer in charge & also including all cost of material, labour & T&P etc.
Supplying and Laying of 200 GSM Geotextile sheet in river bank & Spurs including all cost of labour material, and T&P etc with all taxes but excluding cost of G.S.T required for proper completion of work as per Engineer-in-charge.
Collection ,Laying sand on slopes &top of Shank including all cost of labour material, and T&P etc with all taxes but excluding cost of G.S.T required for proper completion of work as per Engineer-in-charge.
Supply ,Laying and Dry boulder 20-40 kg. in Pitching including all cost of labour material, and T&P etc.with all taxes but excluding cost of G.S.T required for proper completion of work as per Engineer-in-charge.
Providing, laying and placing of R.C.C (M-20 grades) porcupine and filling jhankar or jhau in water with binding of murga jali including all cost of materials, labours, T & P with all taxes etc. Required for proper complition of work.
Providing and filling jhakhar or jhau in water and placing in position involving carraige upto 5km without boat in dry including all cost of materials,labours, T & P etc. Required for proper complition of work but excluding cost of G.S.T
10 SWG wire in bracing porcupine sets of studs & apron including all cost of material, labour, T&P etc.
RBM for constructing of Shank including all lead and lift with all taxes but excluding cost of G.S.T required for proper completion of work as per Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
LOT03.pdf
Tender Documents • 1.68 MB
BOQ_2100016.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid