| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹78.9 LAccepted-Finance | ₹78.9 L | 1 | Accepted-Finance L1 |
| 2 | 2₹80.1 L+₹1.2 L (1.52%)Accepted-Finance | ₹80.1 L+₹1.2 L (1.52%) | 2 | Accepted-Finance L2 |
| 3 | 3₹81.0 L+₹2.1 L (2.64%)Accepted-Finance NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | ₹81.0 L+₹2.1 L (2.64%) | 3 | Accepted-Finance L3 |
| 4 | 4₹84.3 L+₹5.4 L (6.79%)Accepted-Finance | ₹84.3 L+₹5.4 L (6.79%) | 4 | Accepted-Finance L4 |
| 5 | 5₹84.6 L+₹5.7 L (7.16%)Accepted-Finance | ₹84.6 L+₹5.7 L (7.16%) | 5 | Accepted-Finance L5 |
| Sl No | Description | Qty | Unit | M/s MSK Construction L3 | V SURENDRA NAIDU L6 | j srinivas L2 | CHINTHADA VENKATA RAO L7 | M N NAIDU CONSTRUCTIONS L4 | Sri Shivanagoud S Yalwar L5 | B SIVA KUMAR L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Careful removal of damaged roof concrete over the terrace of Mandapa of the temple including disposing the waste away from the monument, cost, conveyance, loading, unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by site-in-Charge. | 153.95 | Cu.m | 3,000 ₹4,61,850 | 2,390 ₹3,67,940.5 | 2,196 ₹3,38,074.2 | 3,000 ₹4,61,850 | 1,444 ₹2,22,303.8 Lowest | 2,300 ₹3,54,085 | 2,162.95 ₹3,32,986.15 |
| 2.00 | Water tightening the terrace by providing brick jelly lime concrete in place of damaged roof concrete (1lime:2Sand:4brick aggregate of size 40mm) to an average depth of 30cm with proper camber including ramming, consolidating etc., complete as directed by the site in charge. | 153.95 | Cu.m | 14,000 ₹21,55,300 | 11,719 ₹18,04,140.05 | 10,949.4 ₹16,85,660.13 | 12,000 ₹18,47,400 | 6,666 ₹10,26,230.7 Lowest | 11,950 ₹18,39,702.5 | 10,783.07 ₹16,60,053.63 |
| 3.00 | Providing 20mm thick plastering the top with Lime mortar (1:2) over which laying one course of flat tiles of size 15x15x1.2cm including cost, conveyance, loading, unloading of all materials, labour charges, GST and all other applicable taxes etc. complete as directed by the site in-charge. | 332.48 | Sq.m | 1,500 ₹4,98,720 | 4,812 ₹15,99,893.76 | 4,500 ₹14,96,160 | 5,000 ₹16,62,400 | 666 ₹2,21,431.68 Lowest | 4,700 ₹15,62,656 | 4,434.5 ₹14,74,382.56 |
| 4.00 | Providing stucco lime patch plastering (Base Coat) with Lime Mortar (1:2) 20 mm thick, at damaged locations of the gopuras. Including careful de-plastering of the damaged locations of the gopuras. Including careful and de-plastering damaged and worn out loose plaster of gopuras and cleaning the dead mortar and setting fallen edges if any in bricks pieces including cost, conveyance, loading, unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by the site in-charge. | 219.77 | Sq.m | 1,000 ₹2,19,770 Lowest | 2,720 ₹5,97,774.4 | 2,499.3 ₹5,49,271.16 | 2,700 ₹5,93,379 | 1,111 ₹2,44,164.47 | 2,200 ₹4,83,494 | 2,461.6 ₹5,40,985.83 |
| 5.00 | Finishing the plaster surface with thin layer of fine plastering (6mm) using special hand grinded lime mortar(1:1) paste for punning/ sibara including cost, conveyance, loading, unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by the site in-charge. | 341.99 | Sq.m | 1,014.24 ₹3,46,859.94 Lowest | 1,716 ₹5,86,854.84 | 1,575 ₹5,38,634.25 | 1,720 ₹5,88,222.8 | 1,666 ₹5,69,755.34 | 1,680 ₹5,74,543.2 | 1,552.98 ₹5,31,103.63 |
| 6.00 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10sqm on planincluding getting out and disposal of excavated earth up to 50 m and lift up to 1.5 m etc., complete as directed by the site in-charge. | 465 | Cu.m | 500 ₹2,32,500 | 497 ₹2,31,105 | 457.2 ₹2,12,598 | 500 ₹2,32,500 | 139 ₹64,635 Lowest | 500 ₹2,32,500 | 450.48 ₹2,09,473.2 |
| 7.00 | Providing 25 mm thick Cuddapah/Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, with base of cement mortar (1:4) (1cement:4coarse sand) including Cost of material and Conveyance charges etc. all complete as directed by the site in-charge. | 1,550 | Sq.m | 2,700 ₹41,85,000 | 2,201 ₹34,11,550 | 2,059.2 ₹31,91,760 | 2,250 ₹34,87,500 | 3,922 ₹60,79,100 | 2,200 ₹34,10,000 | 2,027.64 ₹31,42,842 Lowest |
Tender Value
₹87.2 L
EMD Value
₹2.2 L
Closing Date
21 Jul 2026, 11:00 amClosed
SA, ASI, Amaravati Circle, Vijayawada
Aurobindo Plaza,6-134/1, Kanuru Main Road, Kanuru, Vijayawada -520007 (A.P.)
As per Tender document
2026_ASI_915292_1
13/NIT/2026-2027/Amaravati/ Kadapa Sub Circle
Open Tender
Civil Works
Works
180 days
Sivalapalli, ysr kadapa
As per Tender document
3 documents required · 3 mandatory
₹0
₹2.2 L
Yes
27 Aug 2026
1 Jul 2026
22 Jul 2026
1 Jul 2026
21 Jul 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Careful removal of damaged roof concrete over the terrace of Mandapa of the temple including disposing the waste away from the monument, cost, conveyance, loading, unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by site-in-Charge. | 153.95 | Cu.m | 1 | ₹153.95 |
| 2 | Water tightening the terrace by providing brick jelly lime concrete in place of damaged roof concrete (1lime:2Sand:4brick aggregate of size 40mm) to an average depth of 30cm with proper camber including ramming, consolidating etc., complete as directed by the site in charge. | 153.95 | Cu.m | 1 | ₹153.95 |
| 3 | Providing 20mm thick plastering the top with Lime mortar (1:2) over which laying one course of flat tiles of size 15x15x1.2cm including cost, conveyance, loading, unloading of all materials, labour charges, GST and all other applicable taxes etc. complete as directed by the site in-charge. | 332.48 | Sq.m | 1 | ₹332.48 |
| 4 | Providing stucco lime patch plastering (Base Coat) with Lime Mortar (1:2) 20 mm thick, at damaged locations of the gopuras. Including careful de-plastering of the damaged locations of the gopuras. Including careful and de-plastering damaged and worn out loose plaster of gopuras and cleaning the dead mortar and setting fallen edges if any in bricks pieces including cost, conveyance, loading, unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by the site in-charge. | 219.77 | Sq.m | 1 | ₹219.77 |
| 5 | Finishing the plaster surface with thin layer of fine plastering (6mm) using special hand grinded lime mortar(1:1) paste for punning/ sibara including cost, conveyance, loading, unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by the site in-charge. | 341.99 | Sq.m | 1 | ₹341.99 |
| 6 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10sqm on planincluding getting out and disposal of excavated earth up to 50 m and lift up to 1.5 m etc., complete as directed by the site in-charge. | 465 | Cu.m | 1 | ₹465 |
| 7 | Providing 25 mm thick Cuddapah/Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, with base of cement mortar (1:4) (1cement:4coarse sand) including Cost of material and Conveyance charges etc. all complete as directed by the site in-charge. | 1,550 | Sq.m | 1 | ₹1,550 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.86 MB
cover1.pdf
Additional Documents • 5.12 MB
BOQ_961892.xls
BOQ • 0.32 MB
13SignedNIT.pdf
Additional Documents • 13.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .