Loading…
Loading…
Tender Value
₹1.4 L
EMD Value
₹1,500
Closing Date
12 Oct 2026, 4:00 pmClosed
DEPUTY EXECUTIVE ENGINEER, M.S. ELECTRICAL SUB DN, AHMEDABD
All inclusive Comprehensive Maintenance of Split Type A.C. machines & A.C. plants at various N.R Buildings Under Gujarat College section,M.S. Electrical (R & B) sub division, Ahmedabad (For one Year 2026-27).
350314
04/02 OF 2026/2027
Open
Electrical and Maintenance Works
Works
Ahmedabad
8 documents required · 8 mandatory
₹600
Deputy Executive Engineer, M.S.Electrical Sub Division, Ahmedabad
₹1,500
29 Sept 2026
29 Sept 2026
29 Sept 2026
12 Oct 2026
29 Sept 2026
All inclusive Comprehensive Maintenance of Split Type A.C.
machines & A.C. plants at various N.R Buildings Under Gujarat
College section,M.S. Electrical (R & B) sub division, Ahmedabad
(For one Year 2026-27).
Sr. No. Qnty. Item Description Figures Per Amount
NIL NIL NIL NIL NIL NIL NIL
Dy. Executive Engineer
Signature of Contractor M.S. Elect. Sub- Division
R & B Deptt., Ahmedabad.
Name of All inclusive Comprehensive Maintenance of Split Type A.C. machines & A.C. plants at various N.R Buildings Under Gujarat College
Work: section,M.S. Electrical (R & B) sub division, Ahmedabad (For one Year 2026-27)
Sr. No. Item Qty Unit Rate in words Rate in figure Amount
All inclusive comprehensive maintenance cost for the period of one year
for the Split type Air-conditioning Unit of following Capacity (B) 1.5 ton
(1) Charges for breakdown Maintenance as per requirement throughout Rupees One Thousand Two Hundred Thirty
the year Three And Paise Twenty One Only
(2) Charges for 1st Routine Maintenance of Dry Services between date of Rupees One Hundred Forty Four And Paise
commencement to 3rd Months from date of issue of work order. Forty Three Only
(3) Charges for 2nd Routine Maintenance of wet Services with water or
Rupees Two Hundred Sixty Seven And Paise
Chemical as per site requirement Services between 3rd months to 6th 26 Ea 267.65
Sixty Five Only
Months from date of issue of work order.
(4) Charges for 3rd Routine Maintenance of Dry Services between 6th Rupees One Hundred Forty Four And Paise
months to 9th Months from date of issue of work order. Forty Three Only
(5) Charges for 4th Routine Maintenance of wet Services with water or
Rupees Two Hundred Sixty Seven And Paise
Chemical as per site requirement Services between 9th months to 12th 26 Ea 267.65
Sixty Five Only
Months from date of issue of work order.
All inclusive comprehensive maintenance cost for the period of one year
for the Split type Air-conditioning Unit of following Capacity(C) 2.0 ton
(1) Charges for breakdown Maintenance as per requirement throughout Rupees One Thousand Four Hundred Sixty
the year Four And Paise Fifty Only
(2) Charges for 1st Routine Maintenance of Dry Services between date of Rupees One Hundred Seventy One And Paise
commencement to 3rd Months from date of issue of work order. Seventy Only
(3) Charges for 2nd Routine Maintenance of wet Services with water or
Rupees Three Hundred Seventeen And Paise
Chemical as per site requirement Services between 3rd months to 6th 6 Ea 317.14
Months from date of issue of work order.
(4) Charges for 3rd Routine Maintenance of Dry Services between 6th Rupees One Hundred Seventy One And Paise
months to 9th Months from date of issue of work order. Seventy Only
(5) Charges for 4th Routine Maintenance of wet Services with water or
Rupees Three Hundred Seventeen And Paise
Chemical as per site requirement Services between 9th months to 12th 6 Ea 317.14
Months from date of issue of work order.
All inclusive comprehensive maintenance cost For the period of one year
For the package AC Plant having capacity of 44 TR including Gas Rupees Thirty Six Thousand Five Hundred
charging,piping & all other miscellenous work ,installed at Nehru Fifty Nine And Paise Forty Five Only
Hall,Gujarat college,Ahmedabad. (22 TR x 2 Nos.)
Rupees One Lakh(s) Forty One Thousand Two Hundred Sixty Three And Paise Sixty Only
I/We am/are willing to carry out the work at % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct……………..…% below Add …………….. /% Above
In words In words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C
4 Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Dy. Executive Engineer
Signature of Contractor M.S. Elect. Sub- Division
R & B Deptt., Ahmedabad.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Condtion of Work-02.pdf
G S T LTR.pdf
GR.pdf
oline notice No.04 of 2026-27.pdf
PQ CRETERIA work-02.pdf
schedule a and b.pdf
STANDARD BIDDING DOCUMENTS.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .