Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
Tender Value
₹14.6 L
EMD Value
₹36,500
Closing Date
2 Nov 2020, 6:00 pmClosed
Executive Engineer Pazhassi Irrigation Project
Office of the Executive Engineer Pazhassi Irrigation Project Division No 2 Kannur 670002
PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch 10-040km and ch 10-850km of Mahe Branch Canal (18schemes)
2020_Irrig_393638_1
ET/01/SDRF/ EE/PyIP/2020-21
Open Tender
Civil Works - Canal
Item Rate
90 days
Koothuparamba
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,790
Yes
online
₹36,500
Yes
2 Feb 2021
21 Oct 2020
6 Nov 2020
21 Oct 2020
2 Nov 2020
21 Oct 2020
Amount
Scheme 1- PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 1
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 2-PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 2
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 3 -PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 3
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 4-PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 4
od15908/2020_2021/P1 : Removing and cleaning the deposited silt from the UT/Flume by mechanical means(Hydraulic Excavator)/manual means including providing safety measures like oxygen mask, lighting arrangement and getting out the excavated silt and other debris within a distance of 50metre and including all labour charges , watering charges etc complete as per the direction of officers at site All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 5-PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 5
od15908/2020_2021/P1 : Removing and cleaning the deposited silt from the UT/Flume by mechanical means(Hydraulic Excavator)/manual means including providing safety measures like oxygen mask, lighting arrangement and getting out the excavated silt and other debris within a distance of 50metre and including all labour charges , watering charges etc complete as per the direction of officers at site All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 6-PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 6
od15908/2020_2021/P1 : Removing and cleaning the deposited silt from the UT/Flume by mechanical means(Hydraulic Excavator)/manual means including providing safety measures like oxygen mask, lighting arrangement and getting out the excavated silt and other debris within a distance of 50metre and including all labour charges , watering charges etc complete as per the direction of officers at site All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 7-PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 7
od15908/2020_2021/P1 : Removing and cleaning the deposited silt from the UT/Flume by mechanical means(Hydraulic Excavator)/manual means including providing safety measures like oxygen mask, lighting arrangement and getting out the excavated silt and other debris within a distance of 50metre and including all labour charges , watering charges etc complete as per the direction of officers at site All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 8-PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 8
od15908/2020_2021/P1 : Removing and cleaning the deposited silt from the UT/Flume by mechanical means(Hydraulic Excavator)/manual means including providing safety measures like oxygen mask, lighting arrangement and getting out the excavated silt and other debris within a distance of 50metre and including all labour charges , watering charges etc complete as per the direction of officers at site All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 9 -PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 9
od15908/2020_2021/P1 : Removing and cleaning the deposited silt from the UT/Flume by mechanical means(Hydraulic Excavator)/manual means including providing safety measures like oxygen mask, lighting arrangement and getting out the excavated silt and other debris within a distance of 50metre and including all labour charges , watering charges etc complete as per the direction of officers at site All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 10-PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 10
od20924/2020_2021/P1 : Removing and cleaning the deposited silt from the UT/Flume by mechanical means(Hydraulic Excavator)/manual means including providing safety measures like oxygen mask, lighting arrangement and getting out the excavated silt and other debris within a distance of 50metre and including all labour charges , watering charges etc complete as per the direction of officers at site All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 11-PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 11
od15908/2020_2021/P1 : Removing and cleaning the deposited silt from the UT/Flume by mechanical means(Hydraulic Excavator)/manual means including providing safety measures like oxygen mask, lighting arrangement and getting out the excavated silt and other debris within a distance of 50metre and including all labour charges , watering charges etc complete as per the direction of officers at site All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 12-PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 12
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 13-PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 13
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 14- PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 14
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 15- PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 15
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
Scheme 16-PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 16
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
26.28.3 : Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge25 mm average thickness
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
26.31.1 : Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2kg cement per sqm of surface area mixed with specified proportion of approvedpolymer
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.16 : Providing, hoisting and fixing up to floor five level precast reinforced cement concrete in shelves including setting in cement mortar 1:3 ( 1 cement : 3 coarse sand), cost of required centering, shuttering and finishing with neat cement punning on exposed surfaces but excluding the cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
scheme 17-PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 17
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
26.28.3 : Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge25 mm average thickness
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
26.31.1 : Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2kg cement per sqm of surface area mixed with specified proportion of approvedpolymer
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.16 : Providing, hoisting and fixing up to floor five level precast reinforced cement concrete in shelves including setting in cement mortar 1:3 ( 1 cement : 3 coarse sand), cost of required centering, shuttering and finishing with neat cement punning on exposed surfaces but excluding the cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
Scheme 18-PyIP-SDRF-Removal of accumulated sediments deposited in the cut and cover and open canal between ch:10/040km and ch: 10/850km of Mahe Branch Canal-Reach 18
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
SHUHAIB N P
Bidder Name
shabeer
SHUHAIB N P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_559919.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .