| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC 408 HAASH BUSINESS CENTER NR ANKUR SCHOOL FATEHPURA PALDI AHMEDABAD 380007 | AHMADABAD | GUJARAT | 380007 | ₹7.2 L Quoted ₹18.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹21.9 LRejected-AOC | ₹21.9 L | L2 | Rejected-AOC L2 |
| 3 | L3₹23.9 LRejected-AOC 801 VENUS BENECIA PAKVAN DINING LANE OPP RAJPATH CLUB S G HIGHWAY BODAKDEV AHMEDABAD 380053 | AHMADABAD | GUJARAT | 380053 | ₹23.9 L | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | Yash Energy Pvt Ltd L1 | ABHISHEK INTEGRATIONS LIMITED L3 | VAIDEHI ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00 | SITC of 300 sqmm X 3.5Core AL Arm Cable including clamping of cable (wall , tray, surfaceetc and Al cable tag on both ends) including all functional tests
Make: Polycab,Finolex and KEI OR Equivalent | 300 | Meter | 1,490 ₹4.5 L | 1,919 ₹5.8 L | 1,900 ₹5.7 L |
| 2.00 | SITC of 240 sqmm X 3.5Core AL Arm Cable ( including clamping of cable (wall , tray, surfaceetc and Al cable tag on both ends) (180 meter near shifting of housing CSS, 320 meter extra laying from MSP to MSP as indicated by IIMA)including all functional tests
Make: Polycab,Finolex and KEI OR Equivalent | 500 | Meter | 1,232 ₹6.2 L | 1,562 ₹7.8 L | 1,465 ₹7.3 L |
| 3.00 | SITC of 150 sqmm X 3.5Core AL Arm Cable including clamping of cable (wall , tray, surface etc and Al cable tag on both ends)including all functional tests
Make: Polycab,Finolex and KEI OR Equivalent | 180 | Meter | 824 ₹1.5 L | 982 ₹1.8 L | 921 ₹1.7 L |
| 4.00 | SITC of 120 sqmm X 3.5Core AL Arm Cable including clamping of cable (wall , tray, surface etc and Al cable tag on both ends)including all functional tests
Make: Polycab,Finolex and KEI OR Equivalent | 30 | Meter | 718 ₹21,540 | 828 ₹24,840 | 777 ₹23,310 |
| 5.00 | SITC of 70 sqmm X 3.5Core AL Arm Cable including claming of cable (wall , tray, surface etc and Al cable tag on both ends)including all functional tests
Make: Polycab,Finolex and KEI OR Equivalent | 30 | Meter | 487 ₹14,610 | 530 ₹15,900 | 497 ₹14,910 |
| 6.00 | SITC of 10 sqmm X 4 Core CU Arm Cable including claming of cable (wall , tray, surface etc and Al cable tag on both ends)including all functional tests
Make: Polycab,Finolex and KEI OR Equivalent | 30 | Meter | 532 ₹15,960 | 676 ₹20,280 | 634 ₹19,020 |
| 7.00 | SITC 400 Sq mm Aluminium 3 Core H.T Cable including all functional tests
Make: Polycab,Finolex and KEI OR Equivalent | 30 | Meter | 2,875 ₹86,250 | 3,050 ₹91,500 | 3,078 ₹92,340 |
| 8.00 | Supplying and making straight through ioint with heat shrinkable kit with 10 Sq mm Copper 4 Core Joint Kit L.T and doing necessary testing (Hipot ) to ensure proper jointing work
Make: Raychem, 3M OR Equivalent | 1 | Nos. | 2,645 ₹2,645 | 1,840 ₹1,840 | 2,000 ₹2,000 |
| 9.00 | Supplying and making straight through joint with heat shrinkable kit with 70 Sq mm Aluminium Joint Kit L.T and doing necessary testing (Hipot ) to ensure proper jointing work.
Make: Raychem, 3M OR Equivalent | 1 | Nos. | 3,738 ₹3,738 | 2,772 ₹2,772 | 5,000 ₹5,000 |
| 10.00 | Supplying and making straight through joint with heat shrinkable kit with120 Sq mm Aluminium Joint Kit L.T and doing necessary testing (Hipot ) to ensure proper jointing work
Make: Raychem, 3M OR Equivalent | 1 | Nos. | 4,198 ₹4,198 | 2,772 ₹2,772 | 6,500 ₹6,500 |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
16 Jun 2025, 3:00 pmClosed
CAO
IIM Ahmedabad , Sargam Marg, Vastarapur ,Ahmedabad - 380015
Shifting of Housing Compact Sub-Station (CSS) and allied works at IIMA Main Campus
2025_IIMA_861371_1
IIMA/Contracts/TW-10/2025-26
Open Tender
Electrical Works
IIM Ahmedabad
As per Tender Document
7 documents required · 7 mandatory
₹0
₹60,000
Yes
IIM Ahmedabad
25 Mar 2026
23 May 2025
17 Jun 2025
23 May 2025
16 Jun 2025
3 Jun 2025
23 May 2025 - 30 May 2025
29 May 2025
Amount
SITC of 300 sqmm X 3.5Core AL Arm Cable including clamping of cable (wall , tray, surfaceetc and Al cable tag on both ends) including all functional tests Make: Polycab,Finolex and KEI OR Equivalent
SITC of 240 sqmm X 3.5Core AL Arm Cable ( including clamping of cable (wall , tray, surfaceetc and Al cable tag on both ends) (180 meter near shifting of housing CSS, 320 meter extra laying from MSP to MSP as indicated by IIMA)including all functional tests Make: Polycab,Finolex and KEI OR Equivalent
SITC of 150 sqmm X 3.5Core AL Arm Cable including clamping of cable (wall , tray, surface etc and Al cable tag on both ends)including all functional tests Make: Polycab,Finolex and KEI OR Equivalent
SITC of 120 sqmm X 3.5Core AL Arm Cable including clamping of cable (wall , tray, surface etc and Al cable tag on both ends)including all functional tests Make: Polycab,Finolex and KEI OR Equivalent
SITC of 70 sqmm X 3.5Core AL Arm Cable including claming of cable (wall , tray, surface etc and Al cable tag on both ends)including all functional tests Make: Polycab,Finolex and KEI OR Equivalent
SITC of 10 sqmm X 4 Core CU Arm Cable including claming of cable (wall , tray, surface etc and Al cable tag on both ends)including all functional tests Make: Polycab,Finolex and KEI OR Equivalent
SITC 400 Sq mm Aluminium 3 Core H.T Cable including all functional tests Make: Polycab,Finolex and KEI OR Equivalent
Supplying and making straight through ioint with heat shrinkable kit with 10 Sq mm Copper 4 Core Joint Kit L.T and doing necessary testing (Hipot ) to ensure proper jointing work Make: Raychem, 3M OR Equivalent
Supplying and making straight through joint with heat shrinkable kit with 70 Sq mm Aluminium Joint Kit L.T and doing necessary testing (Hipot ) to ensure proper jointing work. Make: Raychem, 3M OR Equivalent
Supplying and making straight through joint with heat shrinkable kit with120 Sq mm Aluminium Joint Kit L.T and doing necessary testing (Hipot ) to ensure proper jointing work Make: Raychem, 3M OR Equivalent
Supplying and making straight through joint with heat shrinkable kit with 150 Sq mm Aluminium Joint Kit L.T and doing necessary testing (Hipot ) to ensure proper jointing work Make: Raychem, 3M OR Equivalent
Supplying and making straight through joint with heat shrinkable kit with 240 Sq mm Aluminium Joint Kit L.T and doing necessary testing (Hipot ) to ensure proper jointing work Make: Raychem, 3M OR Equivalent
Supplying and making straight through joint with heat shrinkable kit with 300 Sq mm Aluminium Joint Kit L.T and doing necessary testing (Hipot ) to ensure proper jointing work Make: Raychem, 3M OR Equivalent
Supplying and making straight through joint with heat shrinkable kit with 400 Sq mm Aluminium Joint Kit H.T and doing necessary testing (Hipot ) to ensure proper jointing work Make: Raychem, 3M OR Equivalent
SITC of Cables Termination with Double compression Cable Gland & relevant Lugs -300 sqmm X 3.5Core AL Arm Cable Termination
SITC of Cables Termination with Double compression Cable Gland & relevant Lugs-240 sqmm X 3.5Core AL Arm Cable Termination (6+ 3 extra cable)
SITC of Cables Termination with Double compression Cable Gland & relevant Lugs 150 sqmm X 3.5Core AL Arm Cable Termination
SITC of Cables Termination with Double compression Cable Gland & relevant Lugs 120 sqmm X 3.5Core AL Arm Cable Termination
SITC of Cables Termination with Double compression Cable Gland & relevant Lugs 70 sqmm X 3.5Core AL Arm Cable Termination
SITC of Cables Termination with Double compression Cable Gland & relevant Lugs 10 sqmm X 4 Core CU Arm Cable Termination
SITC of Cables Termination with Double compression Cable Gland & relevant Lugs of HT Cable 3 x 400 Sq mm Aluminium
Depth of Excavation - 3 Feet x 1 Feet (Including sand & Brick/Half Hume Pipe Filling )
Depth of Excavation - 1.5 Feet x 1 Feet (Including sand & Brick/Half Hume Pipe Filling)
Providng & fixing 25 × 3 mm CU. Strip With Green Sleeve Supply and laying cu. earthing required size strips for interconnecting the earthing stations, panels, DB's etc. in accordance with national and international standards such as IS:1897 in built up trenches, on walls/ceiling, buried in ground generally as specified complete with : a) Fixing accessories, b) Corrosion protection of buried conductors with bituminous coating and covered with PVC tapes.
Installation, Testing (all routine test )and commissioning after shifting of existing 750 KVA dry type ABB make Transformer (Existing CSS Details: Make: ABB, Manufacturing Year :2007 ,IEC:61330 Type- CSS -SN.7.10 Transformer (11KV/433 Volt), Capacity: 750 KVA , MV Switchgear: RMU 12 KV,620A, LV Switchgear : 1250A,433 V ), LV and HV Panel complete as required to different location(As indicated by IIMA)
Skilled Labour
Unskilled Labour
Note: *The lengths of the cable have been estimated as per visible site condition and may vary during exceution. Bidder needs to verify the same at site and include the same in their proposed exceution plan accordingly before quoting rates. *Billing shall be done as per actual quantites executed.In case the quantity is exceeding the actual quanity prior approval of IIMA must be taken before execeution. **For payment related to labour work all entries at security Gate at IIMA is mandatory. Any parts/subcomponets used for the various items should also be of equivalent make as quoted in the BOQ and mentioned in the execution plan by the bidder only. Any substandard product's quality will not be acceptable.The detailed execution plan as to be submitted by the bidder should mention make of each componenet/part also.
VAIDEHI ENTERPRISE (BID ID -3233006)
ABHISHEK INTEGRATIONS LIMITED (BID ID -3232943)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB