Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹18.0 L+₹93,405.69 (5.47%)Admitted-Finance 12 2 39 4 A MURAD NAGAR ROAD MURAD NAGAR SUB POST OFFICE MEHDIPATNAM HYDERABAD TELANGANA 500028 | HYDERABAD | TELANGANA | 500028 | L2 | Admitted-Finance |
Tender Value
₹24.8 L
EMD Value
₹49,680
Closing Date
24 Jul 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
commissioner
nagar nigam kota
nagar nigam kota ward no 62 various yog bhawan and teen shed other vikas work 4 nit 8
2026_DLB_574908_4
NNK/CIVIL/2026/156-169 nit 8
Open Tender
Civil Works
Percentage
180 days
kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
commissioner
₹49,680
Yes
3 Aug 2026
14 Jul 2026
27 Jul 2026
14 Jul 2026
24 Jul 2026
14 Jul 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WORK NAME | |||||
| 1.01 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m. Column. L wall. S Wall | 109.24 | cum | 229.5 | ₹25,070.58 |
| 1.02 | Carriage of Materials by mechanical transport including loading, unloading and stacking :Sand, bazri,
ballast, kankar up to 5 km | 98.32 | cum | 203.81 | ₹20,038.6 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 56.61 | cum | 4,575 | ₹2,58,990.75 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 32 | cum | 5,910 | ₹1,89,120 |
| 1.05 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and
similar works. | 2,500 | Kg | 144.5 | ₹3,61,250 |
| 1.06 | Providing, laying, spreading and compacting of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion. Grading - III Material | 24 | cum | 1,360 | ₹32,640 |
| 1.07 | Random rubble dry stone Kharanja (soling) under floor. L wall. S Wall | 26.4 | cum | 2,270 | ₹59,928 |
| 1.08 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. Footing. Footing | 12.96 | Sqm | 236.5 | ₹3,065.04 |
| 1.09 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts. Column | 67.5 | Sqm | 375 | ₹25,312.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
0004.pdf
Tender Documents • 1.33 MB
BOQ_1022558.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .