| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹8.2 L+₹2,983.91 (0.36%)Rejected-Finance KERALA KL KERALA | ALAPPUZHA | KERALA | 686534 | L2 | Rejected-Finance L2 | |
| 3 | L3₹8.6 L+₹39,463.72 (4.83%)Rejected-Finance CHEMPANODA KATIKULAM ROAD PERAMBRA KOZHIKODE DISTRICT KERALA | KOZHIKODE | KERALA | 673525 | L3 | Rejected-Finance L3 | |
| 4 | L4₹8.8 L+₹57,857.07 (7.08%)Rejected-Finance 1003 SUB TREASURY DEVIKULAM | L4 | Rejected-Finance L4 | |
| 5 | L5₹11.1 L+₹2.9 L (35.2%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | RAJOYJOSEPH PJ L3 | N.P. KANARAN L2 | Ramakrishnan L5 | RAJAN L4 | JOBIN K CHERIYAN L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00CANAL LINING | ||||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 284.66 | cum | 191 ₹54,370.06 | 180 ₹51,238.8 | 179.84 ₹51,193.25 Lowest | 195.6 ₹55,679.5 | 182.68 ₹52,001.69 |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 2,000 | sqm | 6 ₹12,000 | 6.6 ₹13,200 | 5.24 ₹10,480 Lowest | 7.04 ₹14,080 | 6.58 ₹13,160 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 24.9 | cum | 5,916 ₹1,47,308.4 | 5,645 ₹1,40,560.5 | 7,842.04 ₹1,95,266.8 | 6,023.03 ₹1,49,973.45 | 5,625.19 ₹1,40,067.23 Lowest |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 262.4 | sqm | 626 ₹1,64,262.4 | 600 ₹1,57,440 | 830 ₹2,17,792 | 637.46 ₹1,67,269.5 | 595.36 ₹1,56,222.46 Lowest |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 49.61 | cum | 6,390 ₹3,17,007.9 | 6,095 ₹3,02,372.95 | 8,471 ₹4,20,246.31 | 6,506.09 ₹3,22,767.12 | 6,076.34 ₹3,01,447.23 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.92 | cum | 6,888 ₹33,888.96 | 6,570 ₹32,324.4 | 9,130.18 ₹44,920.49 | 7,012.39 ₹34,500.96 | 6,549.19 ₹32,222.01 Lowest |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 36.96 | cum | 237 ₹8,759.52 | 215 ₹7,946.4 | 179.59 ₹6,637.65 Lowest | 241.8 ₹8,936.93 | 225.01 ₹8,316.37 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 213.2 | sqm | 236 ₹50,315.2 | 230 ₹49,036 | 313.69 ₹66,878.71 | 240.92 ₹51,364.14 | 225.01 ₹47,972.13 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.17 | cum | 7,822 ₹32,617.74 | 7,465 ₹31,129.05 | 10,368.64 ₹43,237.23 | 7,963.57 ₹33,208.09 | 7,437.55 ₹31,014.58 Lowest |
Tender Value
₹10.6 L
EMD Value
₹26,481
Closing Date
27 Aug 2025, 6:00 pmClosed
Assistant Executive Engineer KYIP O and M Sub Di
O/OAssistant Executive Engineer KYIP O and M Sub DiVISION Peruvannamuzhi
GENERAL-KyIP ACP(PLAN) 2025 26 Rectification of Nochad Distributary in between ch 00 000 to 00 500 km in Nochad Grama Panchayath General Civil Work
2025_Irrig_783513_2
IRR/PI/TR/4156/2025_5_2_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
NOCHAD
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹26,481
Yes
10 Oct 2025
20 Aug 2025
30 Aug 2025
20 Aug 2025
27 Aug 2025
20 Aug 2025
Amount
CANAL LINING
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
N.P. KANARAN (BID ID -2311334)
RAJOYJOSEPH PJ (BID ID -2310802)
RAJAN (BID ID -2312297)
Ramakrishnan (BID ID -2312128)
Bidder Name
N.P. KANARAN
Ramakrishnan
RAJAN
RAJOYJOSEPH PJ
JOBIN K CHERIYAN
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1298674.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .