| 1 | L1₹2.7 LAccepted-AOC | L1 | Accepted-AOC Competent committee approved the tender in favour of Ist Lowest Bidder | |
| 2 | L2₹2.8 L+₹3,508.50 (1.28%)Rejected-AOC | L2 | Rejected-AOC Competent committee rejected the file due to higher rates |
Tender Value
₹2.8 L
EMD Value
₹2,750
Closing Date
18 Dec 2023, 5:00 pmClosed
SUPERINTENDING ENGINEER
ELECTRICITY DISTRIBUTION CIRCLE, KATJU MARG, BAREILLY
For Increasing Capacity of 03 Nos Existing Distribution Transformer and Installation of 05 Nos New Distribution Transformer of Various Capacity at Various Places under B.P 2023-24 (Rs 1 Crore Per Zone) under EDC, Bareilly
2023_MVVNL_857215_1
84/EDCB/2023-24
Open Tender
Electrical Works
Item Rate
90 days
WORK
AS PER TENDER FORM
3 documents required · 3 mandatory
₹1,180
SE,EDC
₹2,750
29 Jun 2024
29 Oct 2023
19 Dec 2023
29 Oct 2023
18 Dec 2023
29 Oct 2023
Amount
The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDC, Bareilly Approx. distance upto 25 to 80 Km. Including safe loading and unloading.
PCC Pole 8.5 Mtr
ACSR Weasal Conductor
AB Cable 3x95 sqmm
AB Cable 3x50 sqmm
AB Cable 1x16 sqmm
11/0.4 KV 3 Phase 250 KVA T/F
11/0.4 KV 3 Phase 100 KVA T/F
11/0.4 KV 3 Phase 63 KVA T/F
11/0.4 KV 3 Phase 25 KVA T/F
LT Cable 1x240 sqmm
LT Cable 3.5x150 sqmm
LT Cable 3.5x70 sqmm
Other Line material
Construction of T/F plinth 1.5x1.5x2 m3 for mounting 250 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect
Cage fencing of 250 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5'(L)x5'(W)x8’(H) by strenghtening of wire mesh 20x3 mm M.S. flat haorizentally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation.
Pipe Earthing of Transformer (By boring of 4 inch diameter 20 m deep, 40 mm diameter A class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5 m length is inserted at the bottom. Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work Contractor will provide all material, Manpower, T&P, safe carriage of material to worksite. Above work will be carried out under supervision of concerned JE/SDO/EE)
Dismentaling of 63 KVA Transformer as per norms complete in all respect
Dismentaling of 25 KVA Transformer as per norms complete in all respect
Dismentaling of 10 KVA Transformer as per norms complete in all respect
Mounting of 250 KVA T/F Transformers as per norms complete in all respect -
Mounting of 100 KVA T/F Transformers as per norms complete in all respect -
Mounting of 63 KVA T/F Transformers as per norms complete in all respect -
Mounting of 25 KVA T/F Transformers as per norms complete in all respect -
Fabrication & Installation of 11 KV Fuse set unit to be installed on midway of 11 KV Double Pole Structure. Material Detail for complete the work given below :- 1. MS Channel 100x50x2028mm) - 1 Nos (Provided by Contractor) 2. Iron Strip (50x5x305mm) - 3 Nos (Provided by Contractor) 3. 200 mm Fuse wire of required capacity - 3 lenght (Provided by Contractor) 4. Holding Clamps - 2 Nos (Provided by Contractor) 5. Aluminium Lug 70 sqmm - 4 Nos (Provided by Contractor) 6. Off Size Nut & Bolt - As Required (Provided by Contractor) 7- 11 KV Composite Pin Insulator - 6 Nos (Provided by Department) (Manpower & T &P would be provided by the contrator at his own cost)
Erection of Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms
PCC Pole 8.5 Mtr (Single)
PCC Pole 8.5 Mtr (Double)
Grouting of following Pole with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms
PCC Pole 8.5 Mtr (Single)
PCC Pole 8.5 Mtr (Double)
Laying of LT Cable 1x240 sq mm complete in all respect
Laying of LT Cable 3.5x150 sq mm complete in all respect
Laying of LT Cable 3.5x70 sq mm complete in all respect
The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms
Laying, Stringing & Sagging of Following Conductor complete in all respect
ACSR Weasal Conductor
AB Cable 3x95 sqmm
AB Cable 3x50 sqmm
AB Cable 1x16 sqmm
The work of digging of pits, erection of Stay Clamp, Insulator etc.
Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms.
Fixing of 3 Pahse Distribution Box complete in all respect
Supply and Fixing of Following Material as per RESPO norms complete in all respect (would be Provided by contractor through approved vendors of Discom at his own cost)
Stone Pad 300x300x75 mm
Distribution Box Clamp
Cross Arm Holding Clamp
F Clamp with Nut & Bolt
Danger Board With Clamp
Barbed Wire
Aluminium Lug 70 sqmm with Nut&Bolt
Aluminium Lug 240 sqmm with Nut&Bolt
Tailless Unit 400 Amp
P G Clamp
Holding Clamp
Holding Clamp for LT T-Off
LT Clamp With Nut & Bolt
Stay Insulator
LT Shackle Insulator
Nut & Bolt for Shackle Insulator
Piercing Connector
Safe back carriage of Following item (if any) from work site to C.B. Ganj store Bareilly approx distance upto 25-80 Km including loading & unloading.
11/0.4 KV 3 Phase 63 KVA T/F
11/0.4 KV 3 Phase 25 KVA T/F
11/0.4 KV 3 Phase 10 KVA T/F
Qazi contractor and suppliers
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .