Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC SEVALUR | SEVALUR | ₹1.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.4 Cr+₹2.6 L (1.94%)Rejected-Finance | ₹1.4 Cr+₹2.6 L (1.94%) | L2 | Rejected-Finance Above Est rate |
| Sl No | Description | Qty | Unit | RRD CONSTRUCTION L1 | DRS Constructions L2 |
|---|---|---|---|---|---|
| 1.00Strengthening the road from Kattanimedu to veerachipatty Km 0/0-3/01 (R-160) | |||||
| 2.00 | Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | 3,062.16 | Sqm | 6 ₹18,372.96 Lowest | 6 ₹18,372.96 Lowest |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning including etc complete | 3,711.75 | Cum | 22 ₹81,658.5 Lowest | 22 ₹81,658.5 Lowest |
| 4.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A Km 1/0-2/0 & 3/0 -4/650 | 1,224.86 | Cum | 131 ₹1,60,456.66 Lowest | 134 ₹1,64,131.24 |
| 5.00 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. K Km Km 1/0-2/0 & 3/0 -4/650 | 996.23 | Cum | 336 ₹3,34,733.28 Lowest | 343 ₹3,41,706.89 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1,674.36 | Cum | 2,766 ₹46,31,279.76 Lowest | 2,826 ₹47,31,741.36 |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 11,162.24 | Sqm | 83 ₹9,26,465.92 Lowest | 85 ₹9,48,790.4 |
| 8.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 11,268.75 | Sqm | 20 ₹2,25,375 Lowest | 20 ₹2,25,375 Lowest |
| 9.00 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 281.72 | cum | 12,287 ₹34,61,493.64 Lowest | 12,555 ₹35,36,994.6 |
| 10.00 | Road Marking with hot applied thermoplastic compound with reflectorising Glass Beads on Bituminous surface Km 1/0-2/0 & 3/0 -4/650 | 594.6 | Sqm | 889 ₹5,28,599.4 Lowest | 909 ₹5,40,491.4 |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
30 Jul 2025, 3:00 pmClosed
District Collector/Chairman
II Floor, DRDA, Collectorate
Strengthining to the road from kattanimedu to Veerachipatti (R 160 ) (Km 0/0 -3/01) Thogaimalai Block in Karur District under Nabard RIDF 2025-26 With five year Maintenance
2025_RDTN_585518_5
Karur District - NABARD RIDF-2025-26
Open Tender
Civil Works - Roads
Item Rate
180 days
II Floor, DRDA, Collectorate
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.4 L
30 Aug 2025
25 Jul 2025
30 Jul 2025
25 Jul 2025
30 Jul 2025
25 Jul 2025
Amount
Strengthening the road from Kattanimedu to veerachipatty Km 0/0-3/01 (R-160)
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning including etc complete
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A Km 1/0-2/0 & 3/0 -4/650
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. K Km Km 1/0-2/0 & 3/0 -4/650
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied thermoplastic compound with reflectorising Glass Beads on Bituminous surface Km 1/0-2/0 & 3/0 -4/650
Provision for 90cm chevaran octagan Board
Provision For Road Stud with Lens Reflector
Cost of KM Stone ( 1110x350x250mm)
Cost of HM Stone ( 650x150x100mm)
Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years.
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
DRS Constructions (BID ID -1414866)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .