Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | -11.10% | ₹1.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -0.11% | ₹1.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹1.9 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
10 Aug 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
C/O TILE PATH AND IMPROVEMENT OF DRAIN FROM MASJID SHARIEF TO KHARI W5 BACHI UNDER ADP (PRI) HALQA LARI BLOCK BONIYAR YEAR 2026-27
2026_RDPR_317247_8
145/Xen/Rew/Bla/2026-27 Dated 22/07/2026
Open Tender
Civil Works
Percentage
30 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹3,880
25 Aug 2026
22 Jul 2026
11 Aug 2026
22 Jul 2026
10 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:
1:3:6 or richer mix (i/c equivalent design mix) | 3.24 | CUM | 1,725.2 | ₹5,589.65 |
| - | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc (not exceeding 1.5 m in width) and for shafts, wells , cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 3.38 | CUM | 479.3 | ₹1,620.03 |
| - | P/l of dry stone soling hand packed tightly i/c carriage and h/l | 4.41 | CUM | 1,050 | ₹4,630.5 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 5.19 | CUM | 5,202.9 | ₹27,003.05 |
| - | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 50.4 | SQM | 816.15 | ₹41,133.96 |
| - | Providing and laying in position cement concrete of specified grade including curing excluding the cost of centring and shuttering. All work upto plinth level with:but 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 8.15 | CUM | 5,733.6 | ₹46,728.84 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 24 | SQM | 286.35 | ₹6,872.4 |
| - | 6 mm Cement plaster of mix: 1 : 3 ( 1 cement : 3 coarse sand) | 79.5 | SQM | 241.25 | ₹19,179.38 |
| - | RCC work for slab of drains in M20 grade 1:1.5:3 | 1.08 | CUM | 7,788.4 | ₹8,411.47 |
| - | steel Reinforcement for RCC work | 97.2 | KG | 115 | ₹11,178 |
stage.html
html • 0.02 MB
finance_1039061.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1039061.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].