Tender Value
₹37.3 L
EMD Value
₹37,500
Closing Date
15 Apr 2026, 6:00 pmClosed
C.E.O & S.E (O&M), Dakshin Gujarat Vij Company, Surat Rural Circle
Construction of Cable Trench at 66 KV Delad SS of Sayan Sdn under Kim Ind. Division Jurisdiction of Surat-R Circle of DGVCL
290653
SRC/Civil/Delad SS Cable trench/2026/109
Open
Civil - All
Works
Surat
4 documents required · 4 mandatory
₹1,180
DAKSHIN GUJARAT VIJ COMPANY LTD.
₹37,500
27 Mar 2026
27 Mar 2026
27 Mar 2026
15 Apr 2026
27 Mar 2026
Name of work :- Construction of Cable Trench at 66 KV Delad SS of Sayan Sdn under Kim Ind.
Division Jurisdiction of Surat-R Circle of DGVCL
m Description Qty. Unit Rate Amount
Demolition including stacking of serviceable materilas and
1 disposal of unserviceable materials with all lead and lift. (i) 9.00 CMT 1099.75
Excavation for foundation upto 1.5 m depth including sorting
out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead.(B) Dense or Hard soil
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials
and disposing off the excavated stuff upto
Meter lead.(B) Dense or Hard soil
Filling available excavated earth (excluding rock) in
trenches. plinth, sides of foundations etc. in layers not
exceeding 20 cm. in depth consolidating each
disposited layer by ramming and watering.
Filling in plinth with sand under floors including watering
5 ramming, consolidating and dressing complete 72.00 CMT 477.03
Providing and laying cement concrete 1:3:6 (1- Cement : 3-
Coarse sand : 6- Graded brick bat aggregate 40mm normal
size) and curing complete excluding cost of formwork in (A)
Foundation and Plinth
Providing laying controlled cement concrete M-250
work with curing complete including the cost of form
work and excluding the rate of reinforcement for
7 reinforced concrete work Upto floor two level ( A ) 40.00 CMT 4612.00
Foundations, footings, Base of columns and Mass
Providing and laying controlled cement concrete
M.250 exposed work with curing etc. complete
8 including the cost of formwork but excluding the cost 83.00 CMT 10717.09
of reinforcement for R.C.C. work in (A) Wall :(iii)
Having upto 250 MM
Providing upto floor two level precast cement
concrete cover with 300 mm width, M-200 including
reinforced with 1.6 mm dia. Mild steel wire including
9 roughening,cleaning, fixing and finishing in cement 163.00 SMT 842.00
mortar 1:3 and curing complete.(E) 100mm thick
Providing TMT Bar FE 500D reinforcement for R.C.C.
10 work including bending, binding and placing in 15400.00 KG 76.52
position complete upto floor two level
Structural steel work ( Confirming to IS 4923-1997) riveted,
bolted or welded in builtup for all type sections, in framed
work, including cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer all
complete as per the structural designs and directions of
Engineer in charge. Column ( 122 x 61 x 3.6mm )
m Description Qty. Unit Rate Amount
Cutting, pulling out and removing thick jungle grass, shrubs,
bushes and unwanted vegetations/pants from their roots
and up-rooting from the area of Khadi i.e. natura drain
channel or gutter filled-up with sewage water, earth,coal
and storm water including removing of silted stuff of mud,
sewage, earth etc. by digging or lifting out all materials by
12 engaging hydraulic excavator of one Cu.M.bucket and 25.00 Hour 711.86
dispose off all stuff and cut vegetations as directed by the
Engr.-in-charge. The rate includes all require dmachineries,
tools & tackles, materials, labours, loading & unloading,
transportation, equipments etc. complete at the risk and
cost of the contractor. Payment will be made for the actual
work done hours at site.
Removing of live bundells of UG Cable during execution of
works which is already laying on existing site including all
13 labours material and risk of agency as directed by EIC. 125.00 RMT 500.00
There are eight to ten UG cables laying at said site but rate
are taken RMT in bundels of cable.
Miscellaneous expense for unforseen work which shall be
14 paid as per SOR Rate. Rate for Non SOR item shall be paid 1.00 JOB 50000.00
at approved rate analysed by EE Civil & DE Civil.
Total Amount Excl. GST
Total Amount Excl. GST
"All royalties, toll tax, local tax, development charges, and any other taxes etc., in respect of this contract and also any
statutory variation in future towards above mentioned taxes & any other taxes if levied in future by statutory authority
applicable to the this contract shall be payable by the con-tractor and DGVCL will not entertain any claim whatsoever in
The Contractor has to pay 1% Labour Welfare Cess of estimated cost to the concern Government Department.
The contractor shall produce the receipt of payment of 1% welfare cess from the respective govt. department before
submission of final bill, otherwise final bill for the works will not be finalised.
The proof of payment made by the contractor to the appropriate department shall be submitted to DGVCL, failing which
appropriate amount shall be withheld on getting information/instruction from the concerned department.
I /We agree to carry out the above work at
Add (+)________% above . Rs.
Less (-) _________% below Rs.
Total cost of work. Rs.
(Total cost of work Rs. ______________________________
Signature of Tendered CEO & SE (O&M)
Seal of company DGVCL,Circle Office Surat-R
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice_Cable Trench at 66 KV Delad SS_109.pdf
Technical Bid_109.pdf
Price Bid_109.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .