The Chief Officer, Padra Municipality, Padra
BID DOCUMENT FOR PROVIDING, SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF GRID CONNECTED ROOFTOP SOLAR PROJECT WITH (05 YEAR) OPERATION AND MAINTENANCE, AND AUTOMETIC SOLAR CLEANING SYSTEM IN VARIOUS AREA AT PADRA NAGARPALIKA UNDER: SWARNIM JAYANTI MUKHYA MANTRI SHEHRI VIKAS YOJANA YEAR: 202526.
308942
SJMMSVY 2025-26
Open
Solar Power Plants-Goods
Vadodara
12 documents required · 12 mandatory
₹4,248
The Chief Officer, Padra Municipality, Padra
₹1.1 L
27 May 2026
27 May 2026
27 May 2026
16 Jun 2026
27 May 2026
Total Amount Rs.
Note : 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
SECTION-7 BILL OF QUANTITIES-183
Signature of Contractor President Chief Officer
Padra Nagarpalika Padra Nagarpalika
SECTION-7 BILL OF QUANTITIES-184
PADRA NAGARPALIKA PADRA
NAME OF WORK : ESTIMATE FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF 21 KW GRID
CONNECTED ROOFTOP SOLAR PROJECT WITH 05 YEAR O & M,AND AUTOMETIC SOLAR CLEANING SYSTEM AT
SAYAJI GARDEN WATER WORKS , AT PADRA DIST. VADODARA
Item No. & Description Qty. Per Amount
Supply, Installation, Testing & Commissioning of following size of Grid Tied Solar Power Plant with
Solar Panels (ALMM approved): Frame Material : Anodized Aluminum alloy Frame With Twin Wall Profile, Front Cover :
High Transmission Low-Iron Tempered Glass (AR Coated), High efficency and positive power tolerance Pmax: 0/+5, Module
Efficiency should be approx. 19.5%-22%, Normal operating temperature 45'C, Junction Box with Waterproof IP67 & MC4
Compatible and Enclosed with Bypass diodes, 100% Electroluminescence test to ensure error free Modules, Thep. temp. co-
efficient of the PV module shall equal or better than -0.45%/degree C. Solar PV modules of minimum fill factor 75% to be
used. Unit Production:- More than 4.5 Unit /kw /day (Actual)(1Year Avg) With 10 year Product warranty and 25 year Linear
Power Warranty includes all mechanical and electrical parameters of the Solar panel. Modules must be complied to the
DCR(Domestic content requirements). The Ration of AC to DC is 5:6 for the Installation capacity which are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000 V , Max efficiency: 97.5% - 98.9%, O/p Frequency: 50/60Hz, Operating
Altitude (m) ≤4000, O/p Power Factor: ~1, O/P THDi: <3%, Operating Tempreture Range: -25~60°C, Integrated protection of
Inverter are Anti-islanding Protection, Input Reverse Polarity Protection, Insulation Resistor Detection, Ground fault
protection, Residual Current Monitoring Unit, Output Over Current Protection, Output Short Circuit Protection, Output
Over Voltage Protection, PV array string fault Protection. Protection Degree: IP65, User Interface LCD & APP, Datalogger &
Communication: GPRS / Wi-Fi.
Integrated, Input Reverse Polarity Protection Integrated, Insulation Resistor Detection Integrated, Residual Current
Monitoring Unit Integrated, Output Over Current Protection Integrated, Output Short Circuit Protection Integrated, Output
Over Voltage Protection Integrated, Protection Degree: IP65, User Interface LCD & APP,Datalogger & Communication:
GPRS / Wi-Fi, Module Mounting Structure: The mounting (Rectangular pipe / square pipe / circular pipe) with requisite
cross bars, nuts and bolts, etc. shall be Hot deep galvanized with minimum 80micron coating. The Rectangular / square
/circular hollow pipe section used for the structure should have a minimum thickness of 2.0 mm. other than above, the
material thickness should be minimum 2.5 mm. A certificate of a structural engineer certifying the strength and stability of
the mounting structure to withstand the weight and wind speed of 150 km/hour throughout the life span of 25 years of
the system, shall be submitted by the vendors. Hot Dipped Galvanized steel coils. suitable arrangement for base plate for
foundation , solar panel mounting, the structure should be suitable for carry the load of solar panel,wiring, sprinkler
system etc. with necessary foundation work/wall mount, j bolt, anchor fastner etc. the nut bolt used for installtion of
stucture should be (SS 304) quality.The ground clearance of the bottom most edge of solar panel shall not be less than
mm to 1200 mm or as per site’s technical/feasibility requirement.
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM Balane of System with necessary Swichgears
(Suitabel size and protection of ACDB & DCDB), inter connecting wiring, earthing system as per the CEIG drawing approval,
lightining arrester system as per the CEIG drawing approval, all liasoning work with various gov. dipartment like state nodal
agency,DISCOM & CEIG is included in agency scope
(Excluding All charges namely GEDA Application fees, Solar connectivity Charges, Meter connectivity Charges, Meter
(C ) Grid Tied Solar Power System: 11 - 25 kW (3 - phase)
SBD SECTION-7 BILL OF QUANTITIES-185
Item No. & Description Qty. Per Amount
The all inclusive comprehencive annual maintance contract cost covers yearly maintanance of solar Pv Modules, Inverter,
wiring,earthing,switchgears, etc with material and labour cost including preventive maintanance.The cost covers entire
installation. AMC also includes monthly site visit and inspection of project with submission of inspection and solar
generation report. All parts should be replaced/repaired if found faulty within specified time. Agency has to provide
necessory licening work for warranty,power,Bidirectional meter etc
(C ) 21KW-50KW System
1St year 21.00 4078.38 KW
2nd Year 21.00 4078.38 KW
3Rd Year 21.00 4078.38 KW
4Th Year 21.00 4078.38 KW
5Th Year 21.00 4078.38 KW
Providing & erecting Automatic solar panel cleaning system for solar
power projects which includes necessary plumbing work (UPVC pipes
and accessories) from source of water to project site (upto
meters),Suitable size of sub mercible/ open well motor, necessary wiring
for motor and sprinkler system with safety, timer circuit for
automatically on/off the sprinkler system, necessary size oand number
of nozzles/JET (minimum 1 Nozzle/Jet per module).
(D) 21KW-50KW Cleaning System
Total Amount Rs. ..............
Total Amount Rs. ..............
Meter connectivity Charges Rs…...…......
Add GEDA Application fees Rs…...…......
Meter Testing Charges and system stability/strenthning charges. Rs…...…......
Amount Rs. ..............
Add 18% GST Charge Rs…...…......
Net Amount Rs. ..............
SBD SECTION-7 BILL OF QUANTITIES-186
PADRA NAGARPALIKA PADRA
NAME OF WORK : ESTIMATE FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF 4.00 KW GRID CONNECTED
ROOFTOP SOLAR PROJECT WITH 05 YEAR O & M AT AMBAJI POND , TA PADRA DIST. VADODARA
Item No. & Description Qty. Per Amount
Supply, Installation, Testing & Commissioning of following size of Grid Tied Solar Power Plant with
Solar Panels (ALMM approved): Frame Material : Anodized Aluminum alloy Frame With Twin Wall Profile, Front Cover : High
Transmission Low-Iron Tempered Glass (AR Coated), High efficency and positive power tolerance Pmax: 0/+5, Module Efficiency
should be approx. 19.5%-22%, Normal operating temperature 45'C, Junction Box with Waterproof IP67 & MC4 Compatible and
Enclosed with Bypass diodes, 100% Electroluminescence test to ensure error free Modules, Thep. temp. co-efficient of the PV
module shall equal or better than -0.45%/degree C. Solar PV modules of minimum fill factor 75% to be used. Unit Production:- More
than 4.5 Unit /kw /day (Actual)(1Year Avg) With 10 year Product warranty and 25 year Linear Power Warranty includes all
mechanical and electrical parameters of the Solar panel. Modules must be complied to the DCR(Domestic content requirements).
The Ration of AC to DC is 5:6 for the Installation capacity which are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000 V , Max efficiency: 97.5% - 98.9%, O/p Frequency: 50/60Hz, Operating Altitude
(m) ≤4000, O/p Power Factor: ~1, O/P THDi: <3%, Operating Tempreture Range: -25~60°C, Integrated protection of Inverter are Anti-
islanding Protection, Input Reverse Polarity Protection, Insulation Resistor Detection, Ground fault protection, Residual Current
Monitoring Unit, Output Over Current Protection, Output Short Circuit Protection, Output Over Voltage Protection, PV array string
fault Protection. Protection Degree: IP65, User Interface LCD & APP, Datalogger & Communication: GPRS / Wi-Fi.
Integrated, Input Reverse Polarity Protection Integrated, Insulation Resistor Detection Integrated, Residual Current Monitoring Unit
Integrated, Output Over Current Protection Integrated, Output Short Circuit Protection Integrated, Output Over Voltage Protection
Integrated, Protection Degree: IP65, User Interface LCD & APP,Datalogger & Communication: GPRS / Wi-Fi, Module Mounting
Structure: The mounting (Rectangular pipe / square pipe / circular pipe) with requisite cross bars, nuts and bolts, etc. shall be Hot
deep galvanized with minimum 80micron coating. The Rectangular / square /circular hollow pipe section used for the structure
should have a minimum thickness of 2.0 mm. other than above, the material thickness should be minimum 2.5 mm. A certificate of a
structural engineer certifying the strength and stability of the mounting structure to withstand the weight and wind speed of
km/hour throughout the life span of 25 years of the system, shall be submitted by the vendors. Hot Dipped Galvanized steel coils.
suitable arrangement for base plate for foundation , solar panel mounting, the structure should be suitable for carry the load of solar
panel,wiring, sprinkler system etc. with necessary foundation work/wall mount, j bolt, anchor fastner etc. the nut bolt used for
installtion of stucture should be (SS 304) quality.The ground clearance of the bottom most edge of solar panel shall not be less than
300 mm to 1200 mm or as per site’s technical/feasibility requirement.
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM Balane of System with necessary Swichgears (Suitabel size and
protection of ACDB & DCDB), inter connecting wiring, earthing system as per the CEIG drawing approval, lightining arrester system as
per the CEIG drawing approval, all liasoning work with various gov. dipartment like state nodal agency,DISCOM & CEIG is included in
(Excluding All charges namely GEDA Application fees, Solar connectivity Charges, Meter connectivity Charges, Meter testing Charges
(A) Grid Tied Solar Power System: 1 - 6 kW
The all inclusive comprehencive annual maintance contract cost covers yearly maintanance of solar Pv Modules, Inverter,
wiring,earthing,switchgears, etc with material and labour cost including preventive maintanance.The cost covers entire installation.
AMC also includes monthly site visit and inspection of project with submission of inspection and solar generation report. All parts
should be replaced/repaired if found faulty within specified time. Agency has to provide necessory licening work for
warranty,power,Bidirectional meter etc
SBD SECTION-7 BILL OF QUANTITIES-187
Item No. & Description Qty. Per Amount
(A) 1KW-10KW System
1St year 4.00 5564.09 KW
2nd Year 4.00 5564.09 KW
3Rd Year 4.00 5564.09 KW
4Th Year 4.00 5564.09 KW
5Th Year 4.00 5564.09 KW
Providing & erecting Automatic solar panel cleaning system for solar power
projects which includes necessary plumbing work (UPVC pipes and accessories)
from source of water to project site (upto 30 meters),Suitable size of sub
mercible/ open well motor, necessary wiring for motor and sprinkler system with
safety, timer circuit for automatically on/off the sprinkler system, necessary size
oand number of nozzles/JET (minimum 1 Nozzle/Jet per module).
(A) 1KW-5KW Cleaning System
Total Amount Rs. ..............
Total Amount Rs. ..............
Meter connectivity Charges Rs…...…......
Add GEDA Application fees Rs…...…......
Meter Testing Charges and system stability/strenthning charges. Rs…...…......
Amount Rs. ..............
Add 18% GST Charge Rs…...…......
Net Amount Rs. ..............
SBD SECTION-7 BILL OF QUANTITIES-188
PADRA NAGARPALIKA PADRA
NAME OF WORK : ESTIMATE FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF 36 KW GRID CONNECTED
ROOFTOP SOLAR PROJECT WITH 05 YEAR O & M AT WATER WORKS NEAR AMBAJI TEMPLE , TA PADRA DIST.
Item No. & Description Qty. Per Amount
Supply, Installation, Testing & Commissioning of following size of Grid Tied Solar Power Plant with
Solar Panels (ALMM approved): Frame Material : Anodized Aluminum alloy Frame With Twin Wall Profile, Front Cover : High
Transmission Low-Iron Tempered Glass (AR Coated), High efficency and positive power tolerance Pmax: 0/+5, Module Efficiency
should be approx. 19.5%-22%, Normal operating temperature 45'C, Junction Box with Waterproof IP67 & MC4 Compatible and
Enclosed with Bypass diodes, 100% Electroluminescence test to ensure error free Modules, Thep. temp. co-efficient of the PV module
shall equal or better than -0.45%/degree C. Solar PV modules of minimum fill factor 75% to be used. Unit Production:- More than
Unit /kw /day (Actual)(1Year Avg) With 10 year Product warranty and 25 year Linear Power Warranty includes all mechanical and
electrical parameters of the Solar panel. Modules must be complied to the DCR(Domestic content requirements). The Ration of AC to
DC is 5:6 for the Installation capacity which are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000 V , Max efficiency: 97.5% - 98.9%, O/p Frequency: 50/60Hz, Operating Altitude (m)
≤4000, O/p Power Factor: ~1, O/P THDi: <3%, Operating Tempreture Range: -25~60°C, Integrated protection of Inverter are Anti-
islanding Protection, Input Reverse Polarity Protection, Insulation Resistor Detection, Ground fault protection, Residual Current
Monitoring Unit, Output Over Current Protection, Output Short Circuit Protection, Output Over Voltage Protection, PV array string
fault Protection. Protection Degree: IP65, User Interface LCD & APP, Datalogger & Communication: GPRS / Wi-Fi.
Integrated, Input Reverse Polarity Protection Integrated, Insulation Resistor Detection Integrated, Residual Current Monitoring Unit
Integrated, Output Over Current Protection Integrated, Output Short Circuit Protection Integrated, Output Over Voltage Protection
Integrated, Protection Degree: IP65, User Interface LCD & APP,Datalogger & Communication: GPRS / Wi-Fi, Module Mounting
Structure: The mounting (Rectangular pipe / square pipe / circular pipe) with requisite cross bars, nuts and bolts, etc. shall be Hot
deep galvanized with minimum 80micron coating. The Rectangular / square /circular hollow pipe section used for the structure
should have a minimum thickness of 2.0 mm. other than above, the material thickness should be minimum 2.5 mm. A certificate of a
structural engineer certifying the strength and stability of the mounting structure to withstand the weight and wind speed of
km/hour throughout the life span of 25 years of the system, shall be submitted by the vendors. Hot Dipped Galvanized steel coils.
suitable arrangement for base plate for foundation , solar panel mounting, the structure should be suitable for carry the load of solar
panel,wiring, sprinkler system etc. with necessary foundation work/wall mount, j bolt, anchor fastner etc. the nut bolt used for
installtion of stucture should be (SS 304) quality.The ground clearance of the bottom most edge of solar panel shall not be less than
300 mm to 1200 mm or as per site’s technical/feasibility requirement.
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM Balane of System with necessary Swichgears (Suitabel size and
protection of ACDB & DCDB), inter connecting wiring, earthing system as per the CEIG drawing approval, lightining arrester system as
per the CEIG drawing approval, all liasoning work with various gov. dipartment like state nodal agency,DISCOM & CEIG is included in
(Excluding All charges namely GEDA Application fees, Solar connectivity Charges, Meter connectivity Charges, Meter testing Charges
(D) Grid Tied Solar Power System: 26 - 50 kW (3 - phase)
The all inclusive comprehencive annual maintance contract cost covers yearly maintanance of solar Pv Modules, Inverter,
wiring,earthing,switchgears, etc with material and labour cost including preventive maintanance.The cost covers entire installation.
AMC also includes monthly site visit and inspection of project with submission of inspection and solar generation report. All parts
should be replaced/repaired if found faulty within specified time. Agency has to provide necessory licening work for
warranty,power,Bidirectional meter etc
SBD SECTION-7 BILL OF QUANTITIES-189
Item No. & Description Qty. Per Amount
(C ) 21KW-50KW System
1St year 36.00 4280.38 KW
2nd Year 36.00 4280.38 KW
3Rd Year 36.00 4280.38 KW
4Th Year 36.00 4280.38 KW
5Th Year 36.00 4280.38 KW
Providing & erecting Automatic solar panel cleaning system for solar power projects
which includes necessary plumbing work (UPVC pipes and accessories) from source
of water to project site (upto 30 meters),Suitable size of sub mercible/ open well
motor, necessary wiring for motor and sprinkler system with safety, timer circuit for
automatically on/off the sprinkler system, necessary size oand number of
nozzles/JET (minimum 1 Nozzle/Jet per module).
(D) 21KW-50KW Cleaning System
Total Amount Rs. ..............
Total Amount Rs. ..............
Meter connectivity Charges Rs…...…......
Add GEDA Application fees Rs…...…......
Meter Testing Charges and system stability/strenthning charges. Rs…...…......
Amount Rs. ..............
Add 18% GST Charge Rs…...…......
Net Amount Rs. ..............
SBD SECTION-7 BILL OF QUANTITIES-190
PADRA NAGARPALIKA PADRA
NAME OF WORK : ESTIMATE FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF 60 KW GRID CONNECTED
ROOFTOP SOLAR PROJECT WITH 05 YEAR O & M AT SBM SITE-AT SAREJA TOWN , TA PADRA DIST. VADODARA
Item No. & Description Qty. Per Amount
Supply, Installation, Testing & Commissioning of following size of Grid Tied Solar Power Plant with
Solar Panels (ALMM approved): Frame Material : Anodized Aluminum alloy Frame With Twin Wall Profile, Front Cover : High
Transmission Low-Iron Tempered Glass (AR Coated), High efficency and positive power tolerance Pmax: 0/+5, Module Efficiency
should be approx. 19.5%-22%, Normal operating temperature 45'C, Junction Box with Waterproof IP67 & MC4 Compatible and
Enclosed with Bypass diodes, 100% Electroluminescence test to ensure error free Modules, Thep. temp. co-efficient of the PV
module shall equal or better than -0.45%/degree C. Solar PV modules of minimum fill factor 75% to be used. Unit Production:-
More than 4.5 Unit /kw /day (Actual)(1Year Avg) With 10 year Product warranty and 25 year Linear Power Warranty includes all
mechanical and electrical parameters of the Solar panel. Modules must be complied to the DCR(Domestic content requirements).
The Ration of AC to DC is 5:6 for the Installation capacity which are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000 V , Max efficiency: 97.5% - 98.9%, O/p Frequency: 50/60Hz, Operating Altitude
(m) ≤4000, O/p Power Factor: ~1, O/P THDi: <3%, Operating Tempreture Range: -25~60°C, Integrated protection of Inverter are Anti-
islanding Protection, Input Reverse Polarity Protection, Insulation Resistor Detection, Ground fault protection, Residual Current
Monitoring Unit, Output Over Current Protection, Output Short Circuit Protection, Output Over Voltage Protection, PV array string
fault Protection. Protection Degree: IP65, User Interface LCD & APP, Datalogger & Communication: GPRS / Wi-Fi.
Integrated, Input Reverse Polarity Protection Integrated, Insulation Resistor Detection Integrated, Residual Current Monitoring Unit
Integrated, Output Over Current Protection Integrated, Output Short Circuit Protection Integrated, Output Over Voltage Protection
Integrated, Protection Degree: IP65, User Interface LCD & APP,Datalogger & Communication: GPRS / Wi-Fi, Module Mounting
Structure: The mounting (Rectangular pipe / square pipe / circular pipe) with requisite cross bars, nuts and bolts, etc. shall be Hot
deep galvanized with minimum 80micron coating. The Rectangular / square /circular hollow pipe section used for the structure
should have a minimum thickness of 2.0 mm. other than above, the material thickness should be minimum 2.5 mm. A certificate of
a structural engineer certifying the strength and stability of the mounting structure to withstand the weight and wind speed of
km/hour throughout the life span of 25 years of the system, shall be submitted by the vendors. Hot Dipped Galvanized steel coils.
suitable arrangement for base plate for foundation , solar panel mounting, the structure should be suitable for carry the load of
solar panel,wiring, sprinkler system etc. with necessary foundation work/wall mount, j bolt, anchor fastner etc. the nut bolt used
for installtion of stucture should be (SS 304) quality.The ground clearance of the bottom most edge of solar panel shall not be less
than 300 mm to 1200 mm or as per site’s technical/feasibility requirement.
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM Balane of System with necessary Swichgears (Suitabel size
and protection of ACDB & DCDB), inter connecting wiring, earthing system as per the CEIG drawing approval, lightining arrester
system as per the CEIG drawing approval, all liasoning work with various gov. dipartment like state nodal agency,DISCOM & CEIG is
included in agency scope
(Excluding All charges namely GEDA Application fees, Solar connectivity Charges, Meter connectivity Charges, Meter testing
(E) Grid Tied Solar Power System: 51 - 100 kW (3 - phase)
The all inclusive comprehencive annual maintance contract cost covers yearly maintanance of solar Pv Modules, Inverter,
wiring,earthing,switchgears, etc with material and labour cost including preventive maintanance.The cost covers entire installation.
AMC also includes monthly site visit and inspection of project with submission of inspection and solar generation report. All parts
should be replaced/repaired if found faulty within specified time. Agency has to provide necessory licening work for
warranty,power,Bidirectional meter etc
SBD SECTION-7 BILL OF QUANTITIES-191
Item No. & Description Qty. Per Amount
(D) 51KW-100KW System
1St year 60.00 3852.14 KW
2nd Year 60.00 3852.14 KW
3Rd Year 60.00 3852.14 KW
4Th Year 60.00 3852.14 KW
5Th Year 60.00 3852.14 KW
Providing & erecting Automatic solar panel cleaning system for solar power
projects which includes necessary plumbing work (UPVC pipes and accessories)
from source of water to project site (upto 30 meters),Suitable size of sub
mercible/ open well motor, necessary wiring for motor and sprinkler system with
safety, timer circuit for automatically on/off the sprinkler system, necessary size
oand number of nozzles/JET (minimum 1 Nozzle/Jet per module).
(E) 51KW-100KW Cleaning System
Total Amount Rs. ..............
Total Amount Rs. ..............
Meter connectivity Charges Rs…...…......
Add GEDA Application fees Rs…...…......
Meter Testing Charges and system stability/strenthning charges. Rs…...…......
Amount Rs. ..............
Add 18% GST Charge Rs…...…......
Net Amount Rs. ..............
SBD SECTION-7 BILL OF QUANTITIES-192
PADRA NAGARPALIKA PADRA
NAME OF WORK :ESTIMATE FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF 16 KW GRID CONNECTED
ROOFTOP SOLAR PROJECT WITH 05 YEAR O & M AT FULBAUG GARDEN , TA PADRA DIST. VADODARA
Item No. & Description Qty. Per Amount
Supply, Installation, Testing & Commissioning of following size of Grid Tied Solar Power Plant with
Solar Panels (ALMM approved): Frame Material : Anodized Aluminum alloy Frame With Twin Wall Profile, Front Cover : High
Transmission Low-Iron Tempered Glass (AR Coated), High efficency and positive power tolerance Pmax: 0/+5, Module Efficiency
should be approx. 19.5%-22%, Normal operating temperature 45'C, Junction Box with Waterproof IP67 & MC4 Compatible and
Enclosed with Bypass diodes, 100% Electroluminescence test to ensure error free Modules, Thep. temp. co-efficient of the PV
module shall equal or better than -0.45%/degree C. Solar PV modules of minimum fill factor 75% to be used. Unit Production:-
More than 4.5 Unit /kw /day (Actual)(1Year Avg) With 10 year Product warranty and 25 year Linear Power Warranty includes all
mechanical and electrical parameters of the Solar panel. Modules must be complied to the DCR(Domestic content requirements).
The Ration of AC to DC is 5:6 for the Installation capacity which are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000 V , Max efficiency: 97.5% - 98.9%, O/p Frequency: 50/60Hz, Operating Altitude
(m) ≤4000, O/p Power Factor: ~1, O/P THDi: <3%, Operating Tempreture Range: -25~60°C, Integrated protection of Inverter are Anti-
islanding Protection, Input Reverse Polarity Protection, Insulation Resistor Detection, Ground fault protection, Residual Current
Monitoring Unit, Output Over Current Protection, Output Short Circuit Protection, Output Over Voltage Protection, PV array string
fault Protection. Protection Degree: IP65, User Interface LCD & APP, Datalogger & Communication: GPRS / Wi-Fi.
Integrated, Input Reverse Polarity Protection Integrated, Insulation Resistor Detection Integrated, Residual Current Monitoring Unit
Integrated, Output Over Current Protection Integrated, Output Short Circuit Protection Integrated, Output Over Voltage Protection
Integrated, Protection Degree: IP65, User Interface LCD & APP,Datalogger & Communication: GPRS / Wi-Fi, Module Mounting
Structure: The mounting (Rectangular pipe / square pipe / circular pipe) with requisite cross bars, nuts and bolts, etc. shall be Hot
deep galvanized with minimum 80micron coating. The Rectangular / square /circular hollow pipe section used for the structure
should have a minimum thickness of 2.0 mm. other than above, the material thickness should be minimum 2.5 mm. A certificate of
a structural engineer certifying the strength and stability of the mounting structure to withstand the weight and wind speed of
km/hour throughout the life span of 25 years of the system, shall be submitted by the vendors. Hot Dipped Galvanized steel coils.
suitable arrangement for base plate for foundation , solar panel mounting, the structure should be suitable for carry the load of
solar panel,wiring, sprinkler system etc. with necessary foundation work/wall mount, j bolt, anchor fastner etc. the nut bolt used
for installtion of stucture should be (SS 304) quality.The ground clearance of the bottom most edge of solar panel shall not be less
than 300 mm to 1200 mm or as per site’s technical/feasibility requirement.
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM Balane of System with necessary Swichgears (Suitabel size
and protection of ACDB & DCDB), inter connecting wiring, earthing system as per the CEIG drawing approval, lightining arrester
system as per the CEIG drawing approval, all liasoning work with various gov. dipartment like state nodal agency,DISCOM & CEIG is
included in agency scope
(Excluding All charges namely GEDA Application fees, Solar connectivity Charges, Meter connectivity Charges, Meter testing
(C ) Grid Tied Solar Power System: 11 - 25 kW (3 - phase)
The all inclusive comprehencive annual maintance contract cost covers yearly maintanance of solar Pv Modules, Inverter,
wiring,earthing,switchgears, etc with material and labour cost including preventive maintanance.The cost covers entire installation.
AMC also includes monthly site visit and inspection of project with submission of inspection and solar generation report. All parts
should be replaced/repaired if found faulty within specified time. Agency has to provide necessory licening work for
warranty,power,Bidirectional meter etc
SBD SECTION-7 BILL OF QUANTITIES-193
Item No. & Description Qty. Per Amount
(C ) 11KW-20KW Cleaning System
1St year 16.00 3681.45 KW
2nd Year 16.00 3681.45 KW
3Rd Year 16.00 3681.45 KW
4Th Year 16.00 3681.45 KW
5Th Year 16.00 3681.45 KW
Providing & erecting Automatic solar panel cleaning system for solar power
projects which includes necessary plumbing work (UPVC pipes and accessories)
from source of water to project site (upto 30 meters),Suitable size of sub
mercible/ open well motor, necessary wiring for motor and sprinkler system with
safety, timer circuit for automatically on/off the sprinkler system, necessary size
oand number of nozzles/JET (minimum 1 Nozzle/Jet per module).
(B) 11KW-20KW System
Total Amount Rs. ..............
Total Amount Rs. ..............
Meter connectivity Charges Rs…...…......
Add GEDA Application fees Rs…...…......
Meter Testing Charges and system stability/strenthning charges. Rs…...…......
Amount Rs. ..............
Add 18% GST Charge Rs…...…......
Net Amount Rs. ..............
SBD SECTION-7 BILL OF QUANTITIES-194
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
ALMM APPROVED LIST.pdf
BOQ.pdf
Notes.pdf
OTHER IMPORTANT-1.pdf
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
SBD.pdf
Download all tender documents and submit your bid