Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
17 Jul 2026, 6:00 pm7d left
Dy.Minicipal Commissioner - West Zone
Hand laying patchwork work with hot mix material on different TP roads in the nava vadaj ward of the West Zone.(ARC)(SCHEDULE OF MEINTANACE TYPE WORK)
320693
1/26-27 (T.N.28)
Open
Civil Works - Others
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹20,000
4 Jul 2026
4 Jul 2026
4 Jul 2026
17 Jul 2026
4 Jul 2026
2. Tender Estimated Cost Rs.20,00,000.00
1% of the Tender Cost in the form (Rs.20000.00)
3. Earnest Money
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs.900.00
6. Time-Limit 12 months
7. Validity Period 90 Days
(i) Last Date of Submission of the
a) In Sealed cover in duplicate copies by Registered Post A.D,
(ii) Mode of Sending or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
9. Date of Opening AS PER NIT
Submission of EMD. Tender fee and other Documents during office
Place of Submission & Opening of
10. hours: On AS PER NIT West Zone, 2nd Floor, A.M. Office, Dr.
Tender Ramanbhai Patel Bhavan, Usmanpura.Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and
11. Penalty Due to Delay of work
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30 Lakhs) but not more then 10% of bill
12. Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound
to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation
Time permitted to start parts of as above by contractor the contractor shall be levied penalty of (1)
work Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make
contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
GST ftuLx[t¾xhlu «J<obtl GST yjd&e awfJJtbtk ytJNu.
The staff of the contractor shall wear safety jackets,
shoes, helmets etc. while on duty and any violation will attract
a fine of Rs. 5,000/- for each incident.
15 Safety Failure to erect safety signage or trying to carry out
the works without proper precautions/safety measures as
required will attract a fine of Rs. 5,000/- for each incident.
mœh ftb rNzgwj ytuV buRLxulLm «fthlwk Au subtk ytJuj ytuljtRl me.me.yt.yum Vhegtœlt SLA
( Service Level Agreement) rvhegzbtk rlftj VhSgt< fhJtltu &tg Au.stu ytJuj
ytuljtRl me.me.yt.yum Vhegtœltu <ult SLA ( Service Level Agreement) rvhegzbtk
rlftj fhJtbtk lne ytJu <tu leau bwscle vulÕxe fhJtbtk ytJNu.
Sr no Deparmntent Category Problem SLA Period Penalty per
1. Engineering Road Pot holes on 24 Hours
2. Engineering Road Patch work 72 Hours
portion of road
3. Engineering Road Deep pit-Large 48 Hours
4. Engineering Road Removing of 72 Hours
5. Engineering Road Road Other 48 Hours
6. Engineering Footpath Road- 168 Hours
Contractor's Sign Addl.C.E.(west zone)
AHMEDAB AD MUNICIPAL CORPORATION
Name of Work:- Hand laying patchwork work with hot mix material on different TP roads in the
nava vadaj ward of the West Zone.(ARC)(SCHEDULE OF MEINTANACE TYPE WORK)
AHMEDABAD MUNICIPAL CORPORATION
Name of work :- Hand laying patchwork work with hot mix material on different TP roads in the nava
vadaj ward of the West Zone.(ARC)(SCHEDULE OF MEINTANACE TYPE WORK)
Qty Item Rate Per Amount
1 50 Hiring of Tractor with trolley considering 8 Hrs. Days 2104.09
As working Day hours inclu. Driver
2 Supplying, labour for break down repairing
work for activities like excavation, disliting,
removing debris from trench back filling
etc. comp. as directed by Eng.in charge.
a 200.00 Mazdoor at day /Night No. 497.50
b 50.00 Makadam/ supervision at day / Night No. 711.00
3 48.00 Providing & Supplying JCB Machine on rental Hour 711.86
basis in case of emergency situation and break
down type work & also during unavoidable
condition as per instruction of engg.incharge,
rate includes all nece. shifting, fuel and
operating charges and stacking of useful &
non-useful materials separately up to store.
(No payment should be allowed for non
working condition of machinery and for pipe
line excavation and laying work)
4 Providing, laying, spreading and compacting Cmt 1739.38
graded stone aggregate to wet mix macadam
specification including premixing the Material
with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site,
laying in uniform layers in sub- base / base
course on well prepared surface and
compacting with vibratory roller to achieve the
desired density as per Codal Provision.
A 300 Production & Supply of WMM Cmt 1708.13
B 300 Laying of WMM Cmt 31.25
5 16 Supplying Pneumatic Breaker Machine for Hours 600
RCC Slab or Asphalt Demolishing Work on
site by using Operator, fuel, power Supply
etc. Complete as Directed. (No payment
should be allowed for non working
condition of machinery and for pipe line
excavation and M.H. work. Allowed only
for break down work)
6 4 Providing and operation dewatering Pump 600.00
including fuel charges & operator Charges
etc. as directed etc. comp. (Shift for Eight
Hour) (For Each Pump Set, No payment
should be allowed for non working
condition of machinery)
7 100 Hiring and operating Mud Pumps incl. Cost 18.32
of fuel and operator including the cost of
to and fro transportation, laying of the
delivery hoses as required, lowering and
lifting the pumps as and when required
etc. complete. Set Do As Directed. (No
payment should be allowed for non
working condition of machinery )
8 20 Hire charges for road Roller Per Day 2372.88
9 Re-carting of Hotmix material from place of Work /
AMC store to Location olaying havind narrow width
200.00 like chawls, poles, gamtal roads using JCB MT
foloading to transorting by tractor trolly including
fuel, driver etc complete adirected.
10 Labour charges for hand laying hotmix material
DBM/BC on the road surfacin line & level incl.
cleaning the surface with air compressor and if
require recarting material by JCB at necessory place
of workalso rolling with 8 10 tonnes vibratory roller
and Dust spreading on BC after rolling, ratalso
includes re-carting of Hotmix material from place of
Work / AMstore to Location of laying having
narrow width like chawls, poles, gamtaroads etc.
11 Box cutting the road surface to proper slope and
camber for making a basefor road work including
200.00 removing the excavated stuff and depositing on the Cmt
road side slope as directed upto 200 Mt.lead.
12 Conveyance charge of earth, lime, murrum, building
rubbish, manure, garbage, sludge, excavated rock,
fly ash, aggregates of any kind executed outside the
road site. Rate also includes spreading & levelling
etc complete. Internal conveyance above 50 mt done
within the work site is not payable.
b) Lead From 1Km to 2 Km.
c) Lead From 2 Km to 3 Km.
d) Lead From 3 Km to 4 Km.
13 Providing and applying primer coat with cationic
bitumen emulsion SS1grade conforming to ASTM
GRADE on prepared surface of wet mix macadam
including clearing of Wet mix macadam surface
with air compressor toremove all loose material
1200 other foreign material. The primer shall besprayed Smt
uniformly at the rate of 0.70-1.0 kg/sqm. It shall be
applied by a selfpropelledor towed bitumen pressure
sprayer, equipped for spraying thematerial
uniformly at a specified rate. No dilution or heating
at site of SS1bitumen emulsion shall be permitted.
14 Providing & applying Tack coat with VG-30 Grade
bitumen using bitumenpressure distributor at the rate
of 0.20-0.30 kg/sqm on the existingbituminous
surface cleaned with Air Compressor etccomplete.
15 Repairing damaged M.H. and rasing M.H. up to
road level incl. removingdamaged brick work and
repairing by brick masonry in C.M. 1:5 and plasterin
C.M. 1:3 and fixing C.I. steps and existing MH
sheetcover, removing thedebris from MH and
carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
16 Extra rate over item of excavation of earth for
excavation of asphaltpavement / RCC of thickness
up to 0.20 meter including demolishing the
asphalt carpet, metal,s oiling/cutting Reinforcement
etc.comp. with stacking
the material as directed.
0.20 to 0.30 meter (By any type of Breaker Machine
169 or R.C.C.Cutter machineincluding cost of operator, Smt
fuel, & transportation etc complete.
17 Excavation of asphalt pavement of anythickness
with all sub layer including demolishingthe asphalt
100.00 carpet, metal, soiling using any type Smt
of road cutter and breaker machine
(controlledcutting) including cost of operator, fuel,
&transportation etc complete with stacking
thematerial as directed. (
18 Scarifying of existing bituminous road
surface(flexible Pavement) by mechanical means
uptorequired depth to receive new tar road top
200.00 layeri.e. seal coat and bitumineous concrete Smt
includingtools, plants, fuel, oil etc and disposal
ofunserviceable material/ debries with all lifts
andleads As directed by engineer in charge.
19 Water Tanker 6 kl capacity
TOTAL AMOUNT RS:-
TOTAL AMOUNT RS:-
Contractor's Sign Addl.C.E.
Mobil No: - (west zone)
Hiring of Tractor with trolley considering 8 Hrs. As working Day hours inclu. Driver.
The rate shall be for a unit of
Supplying, labour for break down repairing work for activities like excavation, disliting, removing debris from
trench back filling etc. comp. as directed by Eng.in charge..
Mazdoor at day /Night
Makadam/supervisionatdayNiht
The rate shall be for a unit of
Supplying, labour for break down repairing work for activities like excavation, disliting, removing debris from
trench back filling etc. comp. as directed by Eng.in charge..
The rate shall be for a unit of
Providing & Supplying JCB Machine on rental basis in case of emergency situation and break down type
work & also during unavoidable condition as per instruction of engg.incharge, rate includes all nece.
shifting, fuel and operating charges and stacking of useful & non-useful materials separately up to store. (No
payment should be allowed for non working condition of machinery and for pipe line excavation and
laying work) (Based on Previously approved rate by CE sir )
The rate shall be for a unit of
PER HOURS BASIS
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers in sub- base / base course on well prepared surface and compacting with
vibratory roller to achieve the desired density etc complete.
Production & Supply of WMM to
site of works Laying of WMM
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular material,
premixed with water, to a dense mass on a prepared sub-grade/sub- base/ base or existing pavement as the
case may be in accordance with the requirements of these Specifications. The material shall be laid in one or
more layers as necessary to lines, grades and cross-sections shown on the approved drawings or as directed by
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When vibrating or
other approved types of compacting equipment are used, the compacted depth of a single layer of the sub-base
course may be upto 200 mm with the approval of the Engineer.
Physical Requirements
Coarse aggregates shall be crushed stone. The aggregates shall conform to the physical requirements set forth
in Table 17-1. Sevaliya/Timba/Ankodiya special aggregate is only acceptable.
If the water absorption value of the coarse aggregate is greater than 2 percent, the soundness test shall be
carried out on the material delivered to site as per IS:2386 (Part-5).
Table 3-1 : Physical Requirements of Coarse Aggregates for Wet Mix Macadam for Sub-base/Base
S. No. Test Test Method Requirements
1. Los Angeles Abrasion IS:2386 (Part-4) 40 percent (Max.)
value or Aggregate Impact
value IS:2386 (Part-4) 30 percent (Max.)
2. Combined Flakiness and Elongation IS:2386(Part-1) 35 percent (Max.)*
* To determine this combined proportion, the flaky stone from a representative sample should first be separated out. Flakiness index is
weight of flaky stone metal divided by weight of stone sample. Only the elongated particles be separated out from the remaining (non-
flaky) stone metal. Elongation index is weight of elongated particles divided by total non-flaky particles. The values of flakiness index
and elongation index so found are added up
Grading Requirements
The aggregates shall conform to the grading given in Table 17-2.
Table 3-2 : Grading Requirements of Aggregates for Wet Mix Macadam
IS Sieve Designation Percent by weight passing the IS Sieve
600 micron 8-22
Material finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be graded from coarse to fine and shall not vary from
the low limit on one sieve to the high limit on the adjacent sieve or vice versa.
The surface of the sub-grade/sub-base/base to receive the Wet mix macadam course shall be prepared to the
specified grade and camber and cleaned of dust, dirt and other extraneous material. Any ruts or soft yielding
places shall be corrected in an approved manner and rolled until firm surface is obtained.
Where the Wet mix macadam is to be laid on an existing metalled road, damaged area including depressions
and potholes shall be repaired and made good with the suitable material. The existing surface shall be
scarified and re-shaped to the required grade and camber before spreading the coarse aggregate for Wet mix
Preparation of Mix
Wet Mix Macadam should be prepared in an approved mixing plant of suitable capacity having provision for
controlled addition of water and forced/positive mixing arrangement like pugmill or pan type mixer of
concrete batching plant. For small quantity of wet mix work, the Engineer may permit the mixing to be done
in concrete mixers.
Quantity of water should not vary from OMC determined as per IS : 2720 (part VIII) by more than agreed
limit. The mixed material should be uniformly wet and no segregation should be permitted.
Spreading of mix
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared
subgrade/sub- base/base in required quantities. In no case should these be dumped in heaps directly on the
area where these are to be laid nor shall their hauling over a partly completed stretch be permitted.
The mix may be spread either by a paver finisher or motor grader or as per instruction of Engineer-in-Charge
and/or his authorized representative. For portions where mechanical means cannot be used, manual means as
approved by the Engineer shall be used. The motor grader shall be capable of spreading the material
uniformly all over the surface. Its blade shall have hydraulic control suitable for initial adjustments and
maintaining the same so as to achieve the specified slope and grade.
The paver finisher shall be self-propelled, having the following features:
(i) Loading hoppers and suitable distribution mechanism
(ii) The screed shall have tamping and vibrating arrangement for initial compaction to the layer as it is
spread withoutrutting or otherwise marring the surface profile.
(iii) The paver shall be equipped with necessary control mechanism so as to ensure that the finished
surface is free fromsurface blemishes.
The surface of the aggregate shall be carefully checked with templates and all high or low sports remedied
by removing or adding aggregate as may be required. The layer may be tested by depth blocks during
construction. No segregation of layer and fine particles should be allowed. The aggregates as spread should be
of uniform gradation with no pockets of fine materials.
After the mix has been laid to the required thickness, grade and crossfall/camber the same shall be uniformly
compacted, to the full depth with suitable roller. If the thickness of single compacted layer does not exceed
100 mm, smooth wheel roller of 80 to 100 kN weight may be used. For a compacted single layer upto
mm, the compaction shall be done with the help of vibratory roller of minimum static weight of 80 to 100 kN
or equivalent capacity roller. The speed of the roller shall not exceed 5 km/h.
In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower edge and
progress gradually towards the upper edge. Thereafter, roller should progress parallel to the centre line of the
road, uniformly over-lapping each preceding track by at least one third width until the entire surface has been
rolled. Alternate trips of the roller shall be terminated in stops at least 1 m away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward until the
edges have been firmly compacted. The roller shall then progress gradually towards the centre parallel to the
centre line of the road uniformly overlapping each of the preceding track by at least one-third width until the
entire surface has been rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any other cause shall
be corrected at once as specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly
compacted with mechanical tampers or a plate compactor. Skin patching of an area without scarifying the
surface to permit proper bonding of the added material shall not be permitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like motion in the
sub- base/base course or subgrade. If irregularities develop during rolling which exceed 12 mm when tested
with a 3 metre straight edge, the surface should be loosened and premixed material added or removed as
required before rolling again so as to achieve a uniform surface conforming to the desired grade and crossfall.
In no case should the use of unmixed material be permitted to make up the depressions. Rolling shall be
continued till the density achieved is at least 98 per cent of the maximum dry density for the material as
determined by the method outlined in IS : 2720 (Part-8).
After completion, the surface of any finished layer shall be well-closed, free from movement under
compaction equipment or any compaction planes, ridges, cracks and loose material. All loose, segregated or
otherwise defective areas shall be made good to the full thickness of the layer and recompacted.
Setting and drying:
After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours.
Opening to Traffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam surface till it
has dried and the wearing course laid.
Surface Finish and Quality
Control of WorkSurface
The surface finish of construction shall conform to the requirements of Clause in Item No.
Quality control:
Control on the quality of materials and works shall be exercised by the Engineer as per Table 17-3.
Table 3-3 : Test and Frequency for Materials for Wet Mix Macadam
Type of Test Frequency IS Code
Construction (As per Circular No. 66)
Wet Mix Gradation One test per 200 Cu.m. IS:2386, Part-I-1963
Macada Aggregate Impact Value One test per 1000 Cu.m. IS:2386, Part-IV
Combined Flakiness One test per 500 Cu.m. IS:2386, Part-I
Atterberg Limits of portion One test per 200 Cu.m. IS:2720, Part-V
of aggregates passing
425 micron sieve
Density of compacted layer One set of three tests per IS:2720, Part-VIII
Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or where
the course is otherwise defective due to subgrade soil getting mixed with the aggregates, the full thickness of
the layer shall be scarified over the affected area, reshaped with added premixed material or removed and
replaced with fresh premixed material as applicable and recompacted. The area treated in the aforesaid
manner shall not be less than 5 m long and 2 m wide. In no case shall depressions be filled up with unmixed
and ungraded material or fines.
Arrangement for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor shall take all
necessary measures for the safety of traffic during construction and provide, erect and maintain such
barricades, including signs, marking, flags, lights and flagmen as per instruction of the Engineer-in-charge.
Measurements for PaymeNt
The rate shall be for a unit of one cubic meter.
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by using Operator,
fuel, power Supply etc. Complete as Directed. (No payment should be allowed for non working condition of
machinery and for pipe line excavation and M.H. work. Allowed only for break down work)
Measurements for Payment
The rate shall be for a unit of
Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed etc. comp.
(Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for non working condition of
Measurements for Payment
Therateshallbeforaunitofshiftbasis
Hiring and operating Mud Pumps incl. Cost of fuel and operator including the cost of to and fro transportation,
laying of the delivery hoses as required, lowering and lifting the pumps as and when required etc. complete. Set
Do As Directed. (No payment should be allowed for non working condition of machinery )
Measurements for Payment
Therateshallbeforaunitofhp/hours
Hire charges for road Roller
Measurements for Payment
Therateshallbeforaunitofper days
Re-carting of Hotmix material from place of Work / AMC store to Location olaying havind narrow width
like chawls, poles, gamtal roads using JCB foloading to transorting by tractor trolly including fuel, driver etc
complete adirected.
Measurements for Payment
Therateshallbeforaunitofper MT
Labour charges for hand laying hotmix material DBM/BC on the road surfacin line & level incl. cleaning the
surface with air compressor and if require recarting material by JCB at necessory place of workalso rolling with
8 10 tonnes vibratory roller and Dust spreading on BC after rolling, ratalso includes re-carting of Hotmix
material from place of Work / AMstore to Location of laying having narrow width like chawls, poles,
gamtaroads etc. complete..
Measurements for Payment
Therateshallbeforaunitofper MT
Box cutting the road surface to proper slope and camber for making a basefor road work including
removing the excavated stuff and depositing on the
road side slope as directed upto 200 Mt.lead.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such ordinary
excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials and
rubbish of all kind, bush, wood and trees shall be removed as directed. The materials so obtained shall be
property of the Government and be conveyed and stacked as directed. within 200 M. lead. The roots of the
trees coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be paid.
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall assume
full responsibility for alignment, elevation and dimension of each and all parts of the work. Contractor shall
supply laborers, materials, etc. required for setting out the reference marks and bench marks and shall
maintain them as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and depth as
shown in the drawings or as directed. The contractor shall do the necessary shoring and shutting or providing
necessary slopes to a safe angle, at his own-cost. The payment for such precautionary measures shall be paid
separately if not specified. The bottom of the excavated area shall be 1 evened both longitudinally and
transversely. as directed by removing and watering as required. No earth filling will be allowed for bringing it
to level, if mistake or any other reason excavation is made. deeper or wider that shown on the plan or directed.
The extra depth or width shall be made up with concrete of same proportion as specified for the foundation
concrete at the cost of the contractor. The excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the ground
in layer including ramming and watering etc. The balance of the excavated quantity shall be removed by the
contractor from the site of work to a place as directed with lead upto 200 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of trenches
shown on the drawing or as per sections given by the Engineer-in-charge. No payment shall be made for
surplus excavation made in excess of above requirements or due to slopping and sloping back as found
necessary on account of conditions of soil , and requirements of safety.
The rate shall be for a unit of
one cubic meter.
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock,
fly ash, aggregates of any kind executed outside the road site. Rate also includes spreading & levelling
etc complete. Internal conveyance above 50 mt done within the work site is not payable..
b) Lead From 1Km to 2 Km.
c) Lead From 2 Km to 3 Km.
d) Lead From 3 Km to 4 Km.
Disposal of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregates of anykind is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off within a lead of
meters or as per instruction given by Engineer in charge. Useful materials obtained from clearing site and
excavation shall be stacked and used within the work site. Internal conveyance above 200 mt within the work
site i.e. From starting chainage to End chainage of a given road WILL NOT BE PAYABLE. Materials
suitable for construction of Embankment, earthen shoulder and subgrade shall be stacked at convenient places
within a work site for reuse. No extra payment will be paid to the contractor for stacking of earth within the
work site and reused for the construction of Embankment layer, sub grade and earthen shoulder purpose. Only
surplus earth shall be disposed off outside the work site as per instruction given by Engineer-In-charge. Useful
stones from rock excavation shall be stacked nearly within a lead of 50 M. and will be allowed to be used by
the contractor on payment at rates laid down in the contract or if not so aid down, at schedule of rates of the
Division or at a mutually agreed rates if there are no such rates in the Schedule of rates.
If surplus materials are required to be conveyed outside the work site i.e. Outside conveyance from a
particular stretch of given road will be paid in this item as per instruction of Engineer in charge. No bulkage of
disposed earth will be considered for the payment.
The rate shall be for a unit of one cubic meter.
Providing and applying primer coat with cationic bitumen emulsion SS1grade conforming to ASTM GRADE on
prepared surface of wet mix macadamincluding clearing of Wet mix macadam surface with air compressor
toremove all loose material other foreign material. The primer shall besprayed uniformly at the rate of 0.70-1.0
kg/sqm. It shall be applied by a selfpropelledor towed bitumen pressure sprayer, equipped for spraying
thematerial uniformly at a specified rate. No dilution or heating at site of SS1bitumen emulsion shall be
The rate shall be for a unit of one smt
Providing&applyingTackcoatwi-30 Grade bitumen using bitumenpressure distributor at the rate of 0.20-0.30
kg/sqm on the existingbituminous surface cleaned with Air Compressor etccomplete. For D.B.M.or B.C.
The rate shall be for a unit of one smt
Repairing damaged M.H. and rasing M.H. up to road level incl. removingdamaged brick work and repairing
by brick masonry in C.M. 1:5 and plasterin C.M. 1:3 and fixing C.I. steps and existing MH sheetcover,
removing thedebris from MH and carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
The rate shall be for a unit of Nos Basis
Extra rate over item of excavation of earth for excavation of asphaltpavement / RCC of thickness up to
meter including demolishing theasphalt carpet, metal,s oiling/cutting Reinforcement etc.comp. with
stackingthe material as directed.
0 20 to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter machineincluding cost of operator,
fuel, & transportation etc complete.
The rate shall be for a unit of Smt Basis
Excavation of asphalt pavement of anythickness with all sub layer including demolishingthe asphalt carpet,
metal, soiling using any typeof road cutter and breaker machine (controlledcutting) including cost of
operator, fuel, &transportation etc complete with stacking thematerial as directed. (
The rate shall be for a unit of Smt Basis
Scarifying of existing bituminous road surface(flexible Pavement) by mechanical means uptorequired depth
to receive new tar road top layeri.e. seal coat and bitumineous concrete includingtools, plants, fuel, oil etc
and disposal ofunserviceable material/ debries with all lifts andleads As directed by engineer in charge..
The rate shall be for a unit of Smt Basis
Water Tanker 6 kl capacity
The rate shall be for a unit of Hours Basis
ybœtJtœ BGþrlrmvj ftuvotuhuNl
vr©b Ítul - Esluh Ftðþ
1. Ft<t îtht «t&b LOI (juxh ytuV RLxebuNl) RMgw fhJtbtk ytJNu. LOI (juxh ytuV RLxebuNl)
bégt ctœ rœl-10 btk 5 % (vtka xft) juFu auf&e / rzbtLz z[tVTx / vu ytuzoh / luNljtEÍz cukf
duhkxe&e zevtuÍex Che fhthvºt fhJtltu hnuNu. <u ctœ Jfo ytuzoh RMgw fhJtbtkk ytJNu ylu
Jfoytuzohle <theF&e mbg bgtoœt NÁ &guj dKJtbt ytJNu <ub A<tk vK ftb NY fhJtbtk lrn
ytJu <tu rlgbtlwmth ftgoJtne fhJtbt ytJNu.
2. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
3. xuLzh Jujezexe 120 r>Jm hnuNu.
4. xuLzh MJefthÔþk, h> fhÔþk, ftulu ytvÔþk ylu fgt CtJ&e ytvÔþk, <u ykdu zu. BGþrl. frb.©e ltu rlKog
5. xuLzh Chuj ftuLx[t¾xh vife ftuEvK ftuLx[t¾xhlu vK yt CtJu ftb ytvJtbtk ytJu <tu ceò btLg
ftuLx[t¾xh Jtk^tu jE NfNu lrn.
6. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftb NY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s c^u NY
fhÔþk vzNu. yuf ftb ÃþÁ &tg vAe cesw ftb NY fheyu yuÔþk atjNu lrn.
7. atÕþ ftbu ftuE vK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEllu
LþfNtl &Nu <tu <ule mkÃËKo sJtc>the (òlbtjle) ftuLx[t¾xhle vtu<tle hnuNu. mtEx vh ftb
>hBgtl bswh fu sl<tlt ftuE btKmlt òl btj fu LþfNtl &tg <ule sJtc>the ftuLx[t¾xhle
hnuNu. vtujem Vhegt> &tg <tu <ule sJtc>the vK ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <ule
sJtc>the vK vtujem Vhegt>btk ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk
(suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt, mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu
Ftztbtk W<thNu <tu ftuLx[t¾xh s vtujem Vhegt>btk sJtc>th hnuNu ylu BGþrl. ftuvtuohuNlltu ftuEvK
MxtV ytlt btxu sJtc>th hnuNu lrn.ytxÕþk mbSlu s xuLzh ChÔþk.
8. yt xuLzh su <u Jdolt btLg gt>elt ftuLx[t¾xhtu Che NfNu. dJbuoLxlt btLg ftuLx[t¾xhu y.BGþ.ftuvtuo.
btk btLg ftuLx[t¾xhle gt>ebtk hSMx[uNl ðþhk< fhtJÔþk vzNu.
9. yt Wvhtk< y.BGþ.ftuvtuo.lt slhj ftuLx[t¾x fLzeNl vK btLg htFJtle hnuNu. Vtubo ce-1le Nh<tu
ck^lf<to hnuNu. ftb htuz ylu rcÕz´d Ftðþk - øþsht< htßglt MvuNeVefuNl «btKu fhJtLþk hnuNu
<&t MxtVle Mþalt vK mtEx Wvh atÕþ ftbu ægtlbtk juJtle hnuNu. ce-1 Vtubo <&t MvuNeVefuNl
øþsht< çþf Mxtuh, mu¾xh-21, dtk^eldh Ft<u&e ftuLx[t¾xhu ò<u bu¤Je juJtltu hnuNu. <u Jtkaelu vAe
10. ftuLx[t¾xhlu vubuLx BGþrl. ftuvtuo. Ltt rl<erlgb Bþsc fhJtbtk ytJNu.
11. ftuEvK ftg>tfeg jexeduNl yb>tJt> Nnuhle ftuxobtk hnuNu.
12. bxehegj fu ceò xuMx´d hevtuxo ftuLx[t¾xhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu.
yt ykdultu mkÃËKo Fao <&t BGþrl. MxtVlu juctuhuxhe Mþ^e <&t buLGþVu¾ah´d søgt Mþ^e jtJJt jE
sJtltu Fao vK ftuLx[tfhu CtudJJtltu hnuNu.
13. juch yu¾x «btKu hSMx[uNl ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk
hnuNu. juch yu¾x «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[t¾xh mkÃËKovKu sJtc>th hnuNu.
14. btj su <u Mxtumo Wvh y&Jt mtEx Wvh Mþalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
15. muÕm xuût, ytu¾x[tug, mhatso, yLg xuût fu yLg ftuEvK fhJuht ChJtle sJtc>the ftuLx[t¾xhle
16. atEÕz juch yuBvjtug fhe NftNu lrn.
17. ftuLx[t¾xh îtht yuze.mexe.Rsluh©e / zu. mexe. Rsluh©ele mwalt bwsclt bxehegjltk muBvj hsw
18. ftuLx[t¾xhu atÕþ ftbu mtEx Wvh zeSxj fubuht&e ftb atÕþ > vnujtk, åttÕþ ftbu <&t ftb ÃËKo
>lt Vtuxtud{tV BGþrl. yturVmbtk ytvJtlt hnuNu.
19. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[t¾xh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle
btkdKe fhe NfNu lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
20. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult
jtJJtlt hnuNu. ßgtk ftuE atuFJx l &E ntug ðgtk ytE.yum. ftuz «btKu bxehegÕm jtJJtLþk <&t
xuMx´d fhtJJtLþk hnuNu.
21. htßg / fuL÷ mhfth©elt JF<tu JF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtlt nwfb
mhfth©eyu fhuj ntuE <u Bþsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
22. juch JuÕVuh Vkz btxu ntjbtk htßg mhfth©eyu fhujt nwfb Bþscle hfb cejbtk&e ftve juJtbtk
23. mœh ftb rNzgwj ytuV buRLxulLm «fthlwk Au subtk ytJuj ytuljtRl me.me.yt.yum Vhegtœlt
SLA( Service Level Agreement) rvhegzbtk rlftj VhSgt< fhJtltu &tg Au.stu ytJuj
ytuljtRl me.me.yt.yum Vhegtœltu <ult SLA ( Service Level Agreement) rvhegzbtk
rlftj fhJtbtk lne ytJu <tu leau bwscle vulÕxe fhJtbtk ytJNu.
Sr Deparmntent Category Problem SLA Penalty
no Period per one
1. Engineering Road Pot holes on the road 24 Hours
2. Engineering Road Patch work Relaying 72 Hours
of a portion of road
3. Engineering Road Deep pit-Large 48 Hours
Settlement of road
4. Engineering Road Removing of waste- 72 Hours
Dust Laying on both
side of the road after
5. Engineering Road Road Other 48 Hours
6. Engineering Footpath Road-Footpath 168
Repairing Hours
Wvhtu¾< Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkae Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mrn <&t me¬tu yuze.mexe Rsluh (v.Ítul)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 28.pdf
Download all tender documents and submit your bid