Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹181.3 CrAdmitted-Finance 16A 1 EARLE STREET FLAT N 1 FIRST FLOOR KOLKATA 700026 | KOLKATA | WEST BENGAL | 700026 | L1 | Admitted-Finance | |
| 2 | L2₹189.5 Cr+₹8.2 Cr (4.54%)Admitted-Finance 307 SWAIKA CENTER 4A POLLOCK STREET WORKS AT NH 6 POLYPARK DHULAGORI PP 1 PP 2 HOWRAH 711302 KOLKATA 700001 | KOLKATA | HOWRAH | WEST BENGAL | 700001 | L2 | Admitted-Finance | |
| 3 | L3₹189.7 Cr+₹8.4 Cr (4.65%)Admitted-Finance 8TH FLOOR BUILDING 9A DLF PHASE III SECTOR 25 GURUGRAM 122002 | GURUGRAM | GURUGRAM | HARYANA | 122002 | L3 | Admitted-Finance | |
| 4 | L4₹190.6 Cr+₹9.3 Cr (5.13%)Admitted-Finance IMFA BUILDING BOMIKHAL POSTRASULGARH BHUBANESHWAR 751010 DISTT JHURDA ODISHA | BHUBANESHWAR | KHURDA | ODISHA | 751010 | L4 | Admitted-Finance | |
| 5 | L5₹196.0 Cr+₹14.7 Cr (8.10%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Blue Star Limited L7 | Chevrox Constructions Private Limited L6 | The Indian Hume Pipe Co. Ltd., L8 | UMSL Limited L4 | SARJAN INFRACON PVT. LTD. L11 | KEC International Ltd L3 | OFFSHORE INFRASTRUCTURES LIMITED L5 | Zuberi Engineering Construction Private Limited L10 | Laxmi Civil Engineering Services Pvt Ltd L9 | LASER POWER & INFRA PRIVATE LIMITED L2 | Gannon Dunkerley And Co Ltd L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00EXECUTION OF MEGA RURAL PIPED WATER SUPPLY SCHEMES PERTAINING TO KUCHINDA AND BAMRA BLOCKS OF SAMBALPUR DISTRICT IN ALL RESPECT ON EPC MODE COMPRISING WORK OF DETAILED SURVEY, INVESTIGATION, PLANNING, DESIGNING, COST ANALYSIS AND DELIVERABLES MENTIONED IN RFP AS WELL AS AGREEMENT AND OPERATIONS AND MAINTENANCE OF COMPLETE COMMISSIONED SCHEMES FOR 5 (FIVE) YEAR | ||||||||||||||
| 1.01 | CONSTRUCTION WORK:
PWS TO KUCHINDA AND BAMRA BLOCKS OF SAMBALPUR DISTRICT INCLUDING HOUSE CONNECTION, SURVEY & INVESTIGATION AND 1% LABOUR CESS | 1 | Nos | 1,91,71,69,483 ₹1,91,71,69,483 | 1,76,61,97,511 ₹1,76,61,97,511 | 1,92,58,47,984 ₹1,92,58,47,984 | 1,69,50,59,160 ₹1,69,50,59,160 | 2,14,18,29,999 ₹2,14,18,29,999 | 1,68,73,99,907 ₹1,68,73,99,907 | 1,74,29,44,775 ₹1,74,29,44,775 | 2,02,90,18,412 ₹2,02,90,18,412 | 1,98,59,89,987 ₹1,98,59,89,987 | 1,68,55,61,331.39 ₹1,68,55,61,331.39 | 1,61,24,13,000 ₹1,61,24,13,000 Lowest |
| 1.02 | O&M (EXCLUDING ENERGY CHARGES) FOR 5 YEARS INCLUDING 1% LABOUR CESS | 1 | Nos | 23,82,17,035.79 ₹23,82,17,035.79 | 21,94,58,081 ₹21,94,58,081 | 23,92,95,379.05 ₹23,92,95,379.05 | 21,06,18,817.05 ₹21,06,18,817.05 | 26,61,32,127.63 ₹26,61,32,127.63 | 20,96,67,120 ₹20,96,67,120 | 21,65,68,822.7 ₹21,65,68,822.7 | 25,21,14,774.39 ₹25,21,14,774.39 | 24,67,68,296.71 ₹24,67,68,296.71 | 20,94,38,668.61 ₹20,94,38,668.61 | 20,03,49,655.44 ₹20,03,49,655.44 Lowest |
| 2.00 | The Total value of Schedule4 | 1 | Nos | - | - | - | - | - | - | - | - | - | - | - |
Tender Value
₹183.2 Cr
Closing Date
25 Oct 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EIC RWSS ODISHA BHUBANESWAR
EIC RWSS ODISHA BHUBANESWAR
Execution of Rural Piped Water Supply Project pertaining to Kuchinda and Bamra Blocks of Sambalpur district including five years of Operation and Maintenance
2021_RWSS_70036_1
EIC/RWSS/14/2021-22
National Competitive Bid
Civil Works - Water Works
Lump-sum
730 days
Sambalpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹40,000
EE RWSS Division Bhubaneswar
Exempted
EIC RWSS ODISHA BHUBANESWAR
3 Jan 2022
30 Jul 2021
28 Oct 2021
30 Jul 2021
25 Oct 2021
30 Jul 2021
30 Jul 2021 - 3 Aug 2021
4 Aug 2021
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1EXECUTION OF MEGA RURAL PIPED WATER SUPPLY SCHEMES PERTAINING TO KUCHINDA AND BAMRA BLOCKS OF SAMBALPUR DISTRICT IN ALL RESPECT ON EPC MODE COMPRISING WORK OF DETAILED SURVEY, INVESTIGATION, PLANNING, DESIGNING, COST ANALYSIS AND DELIVERABLES MENTIONED IN RFP AS WELL AS AGREEMENT AND OPERATIONS AND MAINTENANCE OF COMPLETE COMMISSIONED SCHEMES FOR 5 (FIVE) YEAR | |||||
| 1.01 | CONSTRUCTION WORK:
PWS TO KUCHINDA AND BAMRA BLOCKS OF SAMBALPUR DISTRICT INCLUDING HOUSE CONNECTION, SURVEY & INVESTIGATION AND 1% LABOUR CESS | 1 | Nos | 1,62,98,64,577.1 | ₹1,62,98,64,577.1 |
| 1.02 | O&M (EXCLUDING ENERGY CHARGES) FOR 5 YEARS INCLUDING 1% LABOUR CESS | 1 | Nos | 20,25,18,093.34 | ₹20,25,18,093.34 |
| 2 | The Total value of Schedule4 | 1 | Nos | 10 | ₹10 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
DA14.pdf
Additional Documents • 2.74 MB
IndicativeDPR.pdf
Additional Documents • 8.97 MB
BOQ_361706.xls
BOQ • 0.23 MB
RFP14.pdf
Tender Documents • 1.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .