Loading…
Loading…
Tender Value
₹30.2 L
EMD Value
₹30,200
Closing Date
17 Aug 2026, 5:00 pmClosed
Deputy Municipal Commissioner, North Zone
INTERLOCKING PAVER BLOCK PAVING AT SAIJPUR LAKE & PARKING PLOT IN GHATAK-3 OF SAIJPUR WARD IN NORTH ZONE
332890
Tender Notice No.06-2026/27 Tender no.142
Open
Civil Works
Works
Ahmedabad
4 documents required · 4 mandatory
₹1,500
Municipal Commissioner, Ahmedabad
₹30,200
8 Aug 2026
8 Aug 2026
8 Aug 2026
17 Aug 2026
8 Aug 2026
Sr. Department No. of Total Amount
Manager (North Zone). The technical bid shall be opened online on Dt.- 21.08.2026 at
11.00 hrs. Any change / correction / corrigendum in respect of above work shall be placed
on line. Contractors are requested to see the website before 24 hours of submission of their
Assistant Manager (North zone), Ahmedabad Municipal Corporation
North Zone Office Building, Memco-Naroda road, Ahmedabad
Deputy Municipal Commisioner
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
"Rajiv Gandhi Bhavan", Memco - Naroda Raod, Ahmedabad-25.
MEMORANDUM OF WORK
Municipal Commissioner invites online e-tenders from interested contractors for INTERLOCKING PAVER
BLOCK PAVING AT SAIJPUR LAKE & PARKING PLOT IN GHATAK-3 OF SAIJPUR WARD IN
1 Name of work INTERLOCKING PAVER BLOCK PAVING AT SAIJPUR
LAKE & PARKING PLOT IN GHATAK-3 OF SAIJPUR
WARD IN NORTH ZONE
2 Time Limit 12 MONTHS
3 Tender Validity Period 120 Days (Excuding Monsoon)
4 Eligibility Criteria Register “E1” class in PWD in Govt. R&B/CPWD/AMC
or equivalent register with any other state Govt. or
5 Estimated Cost put to Rs. 3019980.04(exclusive of GST). GST will be paid extra by
tender AMC/Authority at prevailing rate to the contractor.
6 Tender fees Rs.1500.00 Demand Draft in favour of Municipal
(Non refundable) Commissioner, Ahmedabad)
7 Contractor's Class “E1” class
8 1% Earnest Money Deposit Rs.30200.00 (Demand Draft or pay order or Bank Guarantee
in favor of Municipal Commissioner, AHMEDABAD/) To be
submitted as prescribed in 8.0 below. Demand Draft or Bank
Guarantee shall be from Nationalized Bank / Scheduled Bank
and valid for 120 days.(As per AMC finance dept. circular
No-5 Dt.5/5/07 & F.D. Circular No. 29 Dt. 7/08/2010) &
attached ANNEXURE - 1 finance dept. circular No -
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees
Tender Fees along with Tender as described in the invitation of tender and
submitted to Assistant Manager (NORTH zone) , Rajiv
Gandhi Bhavan, Memco-Naroda Road, Ahmedabad To be
Submitted Physically As per N.I.T
10 Date of Opening of Technical Bid will be opened online as per N.I.T. in the
Technical bid office of Add.City Engineer (North Zone), Rajiv Gandhi
Bhavan, Memco – Naroda Road, Ahmedabad Municipal
Corporation, Ahmedabad
11 Security Deposit 5 % of the Sanctioned Tender Amount in form of Bank
Guarantee / Demand Draft / Local MICR .(As per Annexure-
12 Mode of sending the Price bid should be submitted by online e-tender only and
Tender Documents Technical bid should be submitted physically also in sealed
envelope systems By RPAD/Speed post/ Hand Delivery in
sealed covers in Duplicate (One Original & One Duplicate)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Each part shall be separately duly sign & seal by contractor .
13 liquidated damages 0.1% of contract price per day from the date of delay.
Maximum limit of liquidated damages for delay in
completion of work will be 10% of the Contract Price
rounded of to the neared thousand.
14 Deduction of Retention Retention
Money from each RA Bill 1. @ 2% of the value of work done will be deducted from each
RA bill. It will be released along with release of payment of
15 Place of Arbitration Ahmedabad
16 Language of Arbitration English
17 Amount to be deducted from Welfare cess as per act 1996 @ 1 % of bill amount
each bill for labour welfare
fund (non-refundable)
18 Contractor's Name
19 Contractor's Address
20 Contractor's Register
21 Contractor's Bank Name
22 Branch Address
23 Bank Account Number
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
26 Solvency The tenderer should submit solvency certificate from
Nationalize/Schedule bank of an amount of 20% Estimated
Tender cost. The bank solvency should not be older than one
27 Time permitted to start parts Whenever a work is allotted by Engineering staff, whether minor
of work or msjor part of any amount, the contractor shall be bound to
start the work within 48 hours so intimation of work.
Communication done telephonically via SMS, via whatsapp and
through letter/ E-mail shall be considered legal and binding for
the same. Failure of company to start the works in 48 hours of
intimation as above by contractor. the contractor shall be levied
penalty of (1) Rs.1000/- per day (for tender amounting upto
lakh). (2) Rs. 2500/- per day (for tender amounting above
lakh to 30 lakh). (3) Rs. 5000/- per day (for all tender amounting
avove 30 lakh). Three time failure by contractor shall make
contractor responsible to be debar unless and otherwise
justified properly in writing/binding within 15 days so flast notice
28 Supervisor Clause Contractor Should Provide One Supervisor per Tender. Failure
of Providing Supervisor contractor shall be levied penalty of
Rs.1000/- per day
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all the tend
without assigning any reasons there of.
Seal and Signature of the Bidder Add.City Engineer
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Finance dept. circular No - 10 Dt.05/08/2024
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
(A) Guarantee issued by following banks will be accepted as SD/EMD on permanent basis.
(1) All Nationalized Banks including the Public Sector Bank-IDBI LTDP
(2) Private Sector Banks authorized by RBI to undertake State Government
Business (at present : AXIS Bank, ICICI Bank, HDFC Bank)
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period up to March
2016. The validity cut-off date is with respect to date of issue of Bank Guarantee irrespective of date of
termination of Bank Guarantee.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Special Note: The issuing branch of all bank guarantees shall of Ahmedabad City Only.
25. Joint venture and subcontracting shall not be allowed under this tender.
Seal and Signature of the Bidder Add.City Engineer
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION,( hereinafter called “the Employer”) invites sealed
Tender document from reputed and qualified bidders for the construction of Works detailed in the Table
Sr. Name of Works Approximate Earnest Money Completion
No. value of works Deposit (Rs.) Period
1 INTERLOCKING PAVER Rs. 3019980.04 Rs. 30200.00 12- MONTHS
BLOCK PAVING AT
PARKING PLOT IN
GHATAK-3 OF SAIJPUR
WARD IN NORTH ZONE
2. Interested bidders shall download the tender documents from AMC’s website
www.amc.nprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be As per N.I.T in the form of Demand Draft /
Pay Order from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER, Ahmedabad,
payable at Ahmedabad, which shall be non refundable. The Details of Tender fees shall be submit
with scan copy at the time of Quoting price bid of the tender and Physically to be submitted along
with technical bid Vol.-1 with other enclosure.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works in the
above Table payable at Ahmedabad and drawn in favor of MUNICIPAL COMMISSIONER,
Ahmedabad, payable at Ahmedabad,. Earnest Money Deposit will have to be specified in Clause 2 of
Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) North Zone, Rajiv Gandhi Bhavan,
Memco – Naroda Road, Ahmedabad As per N.I.T
6. The Bids will be opened on As per N.I.T at the office of Addl.City Engineer (N/Z) , 1st Floor, Rajiv
Gandhi Bhavan, Ahmedabad Municipal Corporation, Memco-Naroda road, Ahmedabad-25. in the
presence of bidders or their representatives who choose to attend. In the event of the specified date of
bid submission/opening being declared a holiday for the Employer, the bids shall be received /opened
on the next working day at the same place and the same time.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FEATURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a).The Bidder should quote the price bid in e- tender form before last date of online submission as per N.I.T
and all other details as asked in the tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate
envelope (marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed Post/
Hand Delivery in duplicate. This envelope shall be sealed in an outer envelope. The Bid envelopes shall
be marked as follows:-
Tender Document Vol.
Registration certificate of class
Power of Attorney
Personal Details
Enclosures as asked in tender
Technical specifications duly sign by contractor.
c).The envelope shall be addressed to the Employer at the following address:
Assistant Manager, North Zone,
1st Floor, Rajiv Gandhi Bhavan,
Memco-Naroda Road,
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for
the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the
g).ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY. Projects
for which incomplete information has been provided will not be considered for evaluation. The Bidder
may attach separate sheets if so required. However, the final bound document submitted, has to be
submitted in vertical A4 size (210 mm X 297 mm) except Form of Bids.
2. Assessment of Submission
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2.1The Employer will open the physically submitted document of all the bids received for the package
(except those received late) containing the sealed Tender volume and other enclosures then announce
the names of bidders in the presence of bidders or their representatives who choose to attend on the date
and time mentioned in the IFB. In the event of specified date of bid opening being declared as a holiday
for the Employer, the Tender will be opened at the appointed time and location on the next working
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer at
the opening will announce bidder’s names, , the presence/or absence of EMD, the amount and validity
of EMD furnished with each bid, is valid registration and such other details, as the Employer may
consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the Invitation
for Bid and has not been furnished in the form, the bid shall be rejected by the Employer as non-
responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with valid
EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD, the bid shall
be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed,
meets the eligibility and qualification criteria, has the required available bid capacity, is accompanied
by the requisite certificates, undertaking and other relevant information specified in the bid documents
and is substantially responsive to the requirement of the bidding documents and provides any
clarification for ascertaining the correctness of the information/details.
2.7 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening, including
the information disclosed to those present in accordance with Sub Clause 3.2 thereof.
2.8 The bidders or their representatives who are present shall sign attendance sheet evidencing their
2.9 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the nonconforming
deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2 and qualified for award of Contract in accordance
with Clause 5(General Terms and Condition).
4. Procedure for Tender Opening
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Received copies of tender in physical form with in schedule time, will be open on schedule date and
time. In the event of specified date of bid opening being declared bidders who qualify the criteria then
bidder bid will be considered for opening of price bid.(Following clause no. 5 of ITB).
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be substantially
responsive to the bidding documents and who has offered the lowest Evaluated Bid Price, provided that
such bidder has been determined to be (i) eligible in accordance with the provisions of Clause
3(General Terms and Condition); and (ii) qualified in accordance with the provisions of Clause
5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify
the successful bidder by cable/fax and confirmed by registered letter that his bid has been accepted.
This letter shall name the sum which the Employer will pay the Contractor in consideration of the
execution, completion and maintenance of the Works by the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. As per City Engineer Circular (WRM) no. 6 2011/12 DT: 24/06/2011. A successful Bidder has to
deposit security deposit / Bank Guarantee with in 15 days after receiving letter of Indent. Time
limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion,
ask any bidder for authentication the correctness of the information/details furnished by him in his bid.
Such request by the Employer and the response by bidder shall be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from
the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid comparison or
contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons not
officially concerned with such process until the award to the successful bidder has been announced.
Any effort by a bidder to influence the Employer's processing of bids or award decisions may result in
the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself
on its own responsibility all information that may be necessary for preparing the bid and entering into a
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
contract for construction of the Works. The costs of visiting the Site shall be at the bidder’s own
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter its
premises and lands for the purpose of such inspection, but only upon the express condition that the
bidder, its personnel and agents, will release and indemnify the Employer and its personnel and agents
from and against all liability in respect thereof and will be responsible for death or personal injury,
loss of or damage to property and any other loss, damage, costs and expenses incurred as a result of
the inspection.
vhevºt lk-28 <&t ltKktFt<t vhevºt lk 31,32 <t.7/7/2017 îtht <t.1/7/2017 vAe cnth vtzJtbt ytJuj
/ytJlth xuLzhbt (bxehegÕm + juch mÃjtg mt&u) G.S.T lt ltuxeVefuNl bwsc G.S.T sgt jtdw vz<tu ntug ðgt
moehnw ftblt cezhu G.S.T ltuxeVefuNl bwscle yuÃjefucujexe ægtlbt
htFe xuLzhlwk cezekd fhJtlw hnuNu.
Seal and Signature of the Bidder Add.City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document for
the construction of works (as defined in these documents, hereinafter referred to as "the Works") detailed in
the table given in the IFB.
1.2 The Works consist of:
INTERLOCKING PAVER BLOCK PAVING AT SAIJPUR LAKE & PARKING PLOT IN
GHATAK-3 OF SAIJPUR WARD IN NORTH ZONE
2. Source of Funds
2.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for Required class and or
equivalent with specialization in road works. If contractor is not registered with AMC in the
relevant class, on award of contract he shall be required to register himself with AMC within
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the
Employer shall reasonably request.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be required
to provide evidence of the origin of materials, equipment, and services to the satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
General information
All individual firms must complete the information in this form. Nationality information shall be provided
for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone/ Contact:
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the
following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and included in
b) Record of poor performance such as abandoning the work, rescinding of contract for which the reasons
are attributable to the non-performance of the contractor, consistent history of litigation awarded
against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their misleading
or false representations in the forms statements etc. for the period to be decided by the Employer
6. One Bid per Bidder
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a joint
venture. A bidder who submits or participates in more than one bid for a contract package will be
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to
comply with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause
bids which are not substantially responsive to the requirements of the bidding documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and the
Employer shall be written in the English language. Supporting documents and printed literature furnished
by the bidder may be in another language provided they are accompanied by an accurate translation of the
relevant passages in the English language, in which case, for purposes of interpretation of the bid, the
English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted online by the bidder.
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in figures
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in figures
and words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid submission
specified in Clause. The Employer as non-responsive shall reject a bid valid for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may
request the bidders to extend the period of validity for a specified additional period. The request and
the responses thereto shall be made in writing or by fax. A bidder may refuse the request without
forfeiting his bid security. A bidder agreeing to the request will not be required or permitted to
modify his bid but will be required to extend the validity of his Bid Security for the period of the
extension, and in compliance with Clause 2 ( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in Instructions
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly
authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with instructions
issued by the Employer, or as necessary to correct errors made by the bidder, in which case the
person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date
specified in the IFB.
Any bid received by the Employer after the deadline for submission of bids will be returned unopened to
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a date
determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high
quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner and
medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will rest
entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of original and
extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for award
has engaged in corrupt or fraudulent practices in competing for the contract in question. The Employer
will declare the firm ineligible, either indefinitely or for a stated period of time, to be awarded a
contract by AHMEDABAD MUNICIPAL CORPORATION if it at any time determines that the firm
has engaged in corrupt or fraudulent practices in competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private sectors by
which they improperly and unlawfully enrich themselves and/or those close to them, or induce
others to do so, by misusing the position in which they are placed, and it includes the offering,
giving, receiving, or soliciting of anything of value to influence the action of any such official
in the procurement process or in contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a Procurement
process or the execution of a contract to the detriment of the Borrower, and includes collusive
practice among bidders (prior to or after bid submission) designed to establish bid prices at
artificial non-competitive levels and to deprive the Borrower of the benefits of free and open
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract without
assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable for
disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the Tender
volume is submitted without valid documents and without proof of eligibility criteria it will be rejected.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or are
conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing
laws as well as framed from time to time). Any penalties laid due to violation of such laws shall be
directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the road
i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic blinkers,
traffic signs as per design, safety tapes etc. to be arranged at site. Necessary florescent marking on
traffic signs to be provided so that it should be visible at night. During night working hours safety in
charge personnel shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary
diversions for proper working at site including traffic signages, safety cones, traffic blinkers,
barricading tapes, red and green flags etc for making easy smooth and safe conditions for the
traffic. The Contractor shall and must provide above at his own cost.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new
connection on behalf of AMC. It includes filling the necessary application to power Supply Company,
follow up and getting the supply, filling the necessary test reports to the power supply company. All
official fees including security deposits and other expenses shall be of initially paid by the contractor.
Contractor shall not sub-let the work without permission of the authority.
Seal and Signature of the Bidder Add.City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINANCIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be valid
for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be returned as promptly
as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when
the bidder has furnished the required performance security and signed
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) furnish the required Performance Security or
ii) sign the Agreement.
3. (A) Security Deposit :-
Within 15 (Fifteen) days of the date of receipt of the Letter of Acceptance, the successful bidder shall
deliver to the Employer, a Initial Security Deposit in the form of a Bank Guarantee for an amount
equivalent to 5% (five percent) of the Contract Price .
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as per
format shall be issued from any Nationalized or RBI approved foreign bank having net worth of more
than Rs.500 Crore of Indian Operation and acceptable to Employer.
(C) Retention :-
a).Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released
along with release of payment of Final Bill.
4. Approved Bank: - As per AMC finance Department Circular No-08 Dt.04/05/12
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the
8. Penalty: - Compensation for (0.10%) zero point one percentage of Delay contract price for uncompleted
work per day subject to a maximum up to ten percentage of contract price or as decided by Municipal
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT etc. on material
procurement or any other component for the works from any source shall be borne by the contractors.
All duties, taxes, Service Tax and other levies payable by the Contractor under the Contract, or for any
other cause as of the date 28 days prior to the deadline for submission of the bids, shall be included in
the rates and prices and the total bid price submitted by the bidder and the evaluation and comparison of
bids by the Employer shall be made accordingly.
Seal and Signature of the Bidder Add.City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
Tender form B-1
FORM B-1 OF GUJARAT STATE ROADS AND BUILDING DEPARTMENT /
WATER RESOURCES DEPARTMENT may be referred.(only English version)
Note binding on the contractors
01. The terms and conditions of contract mentioned in the Clause no 1 to 77 of Form B-1 of Gujarat
State Road and Building Department / Water Resources Department shall be applicable. Binding on
the contractors unless specifically mentioned about it hereunder in clause no.15 to
02. Please read “Ahmedabad Municipal Corporation “instead of “Government / Government of Gujarat
“wherever written.
03. Please read “ Ahmedabad Municipal Corporation “ instead of “ Government of Gujarat State Public
Works Department/Public Works Department/ Government “ wherever written.
04. Please read “City Engineer" instead of “Superintending Engineer “or Executive Engineer wherever
05. “Ahmedabad Municipal Corporation “herein called as “AMC “
06. “Governor for the state of Gujarat “shall be read as “Municipal Commissioner / Ahmedabad Municipal
07. The contents / details / information mentioned in the relevant point under the heading
08. The contents / details / information mentioned in the relevant point under the heading “NOTICE
INVITING TENDERS” may be read as under-
Point No 1 may be read as: Tenders are invited by Municipal Commissioner ,AMC for the work of
INTERLOCKING PAVER BLOCK PAVING AT SAIJPUR LAKE & PARKING PLOT IN
GHATAK-3 OF SAIJPUR WARD IN NORTH ZONE
OF AHMEDABAD CITY Point No.3 : The class of contractor shall be as per
Memorandum of Works in Brief.
The Cl. No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted.
09. The contents / details / information mentioned in the relevant point under the heading
“ADDITIONAL INSTRUCTIONS TO PERSONS TENDERING” shall be read as under-
Point No .2.1 may be read as per the details mentioned in the tender notice
10. DECLARATION FORM & DECLARATION CERTIFICATE are given separately in Tender
Document and it shall be applicable.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
11. TENDER FOR WORKS to be read as given in tender documents / Tender Form.
12. MEMORANDUM to be read as per the details given in tender notice
13. The contents / details / information mentioned in the following CLAUSE under the heading
“TERMS AND CONDITION OF CONTRACT” shall be read as under-
Clause 1: Security Deposit: to be read as per the details given separately elsewhere in the
tender documents.
Clause 2: Liquidated Damages for delay: to be read as per the details given separately
elsewhere in the tender documents.
14. Clause No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted in the form B-1.
Seal and Signature of the Bidder Add.City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. After sanction of tender a Letter of Intent shall be issued to contractor and in response to that letter,
contractor shall have to arrange for Security Deposit within 15 days. If S.D is given within 10days
of issuance of Letter of Intent, time limit shall be counted from that date. If S.D is given after
days of issuance of letter of intent, contractor shall be finned Rs. 200/- per day of delay and shall
be deducted from contractor’s bill. In this case time limit shall start latest by the 10th day of letter
of intent, Security Deposit of 5% of tender amount shall be deposited by pay order, demand draft, .
of nationalized bank /scheduled bank by pay order, demand draft, . of nationalized bank/scheduled
bank only. Contractor shall have to sign contract paper with AMC.
2. In case of earnest money . bounce back, contractor’s tender shall treated as cancelled and the
contractor shall not be given any tender, offer, quotation work in AMC for one year.
3. Conditional tender shall not be accepted
4. Tender validity period is 180 days from the date of opening of tender
5. Muni. Commissioner shall have right to accept, reject the tender as well as the rate at which tender
to be accepted and awarded.
6. Specification of tender items shall be as per PWD manual in general/AMC’s norms and B-1 form
conditions shall be applicable. In case of controversy, Add.C.E’s decision shall be final.
7. Contractor shall have to deposit Earnest Money deposit with tender.
8. Work shall be allotted as per contractors registration class.
9. Contractor shall have to work in such a system that there shall be no damage to any service line of
electric, telephone, gas, any type of service cable ,drainage or water lines etc. In case of damage to
service line, the whole responsibility of accident shall be on contractor’s shoulder. It will be
responsibility of contractor to safe guard the labours against any accident or damage of lives. In
case of police complain, Contractor shall be held responsible for negligence. In case of soil /land
collapse, contractor shall be held responsible for not supporting the soil suffering with strutting,
shuttering Contractor shall safeguard the labour before allowing the labour to enter in excavated or
other site. In case of accident to labours, contractor shall be held responsible for police complain
against him. AMC’s staff shall be responsible for any accident at the site of the work.
10. Contractor shall take insurance of his all labour. and supervisory staff
11. Only registered contractor shall quote the tender , If the contractor is registered with government
then they shall have to apply to registration in AMC within 90 days from the date of work order.
12. AMC’S general condition and Form -B-1 shall be binding to the contractor B-1 Form is put up on
AMC’s web site.
13. Payment of running bill , final bill shall be as per policy of AMC in force at time of payment
14. Any time of litigation shall be in court of Ahmedabad city jurisdiction only.
15. As per site conditions/requirement of site, there shall be increase or decrease in tender item
quantities. In such case contractor shall not have right to any price rise. In case of decrease in any
tender item quantity, contractor shall not ask for compensation.
16. If any construction material brought to site by contractor , is not as per specification, or any
inferior quality material brought to site, then such rejected material shall be removed from the site
within 24 hours, otherwise AMC can throw away such material at any place and recover the
amount for such removal work from contractor bill. In this case contractor shall not be entitled for
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
17. Cost of testing of material shall be done by the contractor. He shall provide vehicle for taking
material/staff from site to testing laboratory/ manufacturing site and contractor shall be bear the cost
of transportation of staff and material.
18. Contractor shall work as per labour Act. Contractor shall not be given any payment if labour
act rules are not followed or insurance of labour is not taken for work
19. Contractor shall deposit the material on site in such a way that it should not become obstruction to
any one in any way
20. All type of taxes(e.g. sales tax, surcharge, vat etc) to be by the contractor.
21. If asked by AMC Engineering staff, contractor shall take photograph of site of work/before start of
work, during work and after the completion of work, with digital camera and deposit to AMC office
or transfer photograph from camera to AMC computer. No additional cost shall be paid.
22. In case of cancellation/rejection of tender, contractor shall not be entitled for any compensation Or
23. In case of extra item, rate shall be taken from SOR of the year of tender preparation. If item is not
available in SOR, then market rate shall be derived by the Eng. dept by rate analysis. Contractor
shall not ask for the rates as per his rate analysis. This should be clearly understood and taken in to
consideration while quoting the tender by the contractor.
24. During execution of work, contractor shall take safety measures like protection by ropes, drums,
danger sign boards, plastic strips, bamboos, wooden poles etc as per requirement & instruction of
Engg.- in- charge. In case of accident due to lack of protection, contractor shall responsible for
police complains, compensation etc AMC staff shall not be held responsible for contractors
25. If instructed by AMC officials, contractor shall have to keep daily progress register and get is
signed by Ass. city Engineer. Contractor shall maintain record of daily No. of labours, employed,
work done, rectification work carried out by contractor after Eng.-in-charge inspection & the
compliance of the same. If such rectification work is not done by contractor within 24 days the
contractor shall be finned Rs. 250/- day of delay & shall be recovered from the contractors bill
26. Contractor is not entitled for any type of compensation or right for the cancellation of tender or
tender items by any means.
27. If work is not completed within specified time limit penalty shall be recovered from bills as per
tender condition.
28. Deduction from bills shall be done as per rules prevailing or the rules which shall come in to force,
by State or Central Govt.
29. 1% amount shall be deducted for labour welfare fund as per state Govt order.
30. Quantity in item is tentative. It is likely to be change.(increase or decrease) as per site
requirement during execution of work.
31. All above conditions shall over rule the conditions given in Form B-1
32. Contractor shall have to register the work as per labour act & as per building safety act, 1906 with
,Dy.Director building safety act, Shram bhavan, 5th floor labour commissioner office, Khanpur,
33. Befor quoting tender, contractor shall have to take complete information of the work after seeing
site and from the concerned Asst. Engineer or Asst. city engineer.
34. In case of the bank detail are not given then EMD return procedure shall be delayed.
35. Before quoting the tender contractor should know that, he has seen the site & understood the item
of works, site conditions. He should be in a position to provide labours at the time of festivals like
Holi, Diwali, Navratri, Marriage season, rainy season or any other time of the year Contractor can
not say that he has no labours due to festivals.
I have read all above conditions carefully and ready to work as per above conditions.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Seal and Signature of the Bidder Add.City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
ltu^ :- vhevºt lk-28 <&t ltKktFt<t vhevºt lk 31 <t.7/7/2017 îtht <t.1/7/2017 vAe cnth vtzJtbt ytJuj
/ytJlth xuLzhbt (bxehegÕm + juch mÃjtg mt&u) G.S.T lt ltuxeVefuNl bwsc G.S.T sgt jtdw vz<tu ntug ðgt
mœhnw ftblt cezhu G.S.T ltuxeVefuNl bwscle yuÃjefucujexe ægtlbt htFe xuLzhlwk cezekd fhJtlw hnuNu.
cezhu xuLzhbtk <ublt Chuj CtJ ytkfz <&t Nçœtubtk cLlubt ChJtlt hnuNu. Nçœtubtk CtJ Chuj l
ntug <uJt xuLzhtu ytvtu ytv hœ dKJtbtk ytJNu. <&t ytJuj yLg cezhtu vife mit&e ytuAt ytJuj
CtJlt xuLzhle bkswhe btkdJtbtk ytJNu.
ybœtJtœ Bgwrlrmvj ftuvtuohuNl
ftb btxulwk xftJthe œh Jt¤wk xuLzh ylu ftuLx[tfx
xuLzhh btxule Nh<tuu
1 xuLzhhle jtgft<
1 y: yt xuLzh su <u Jdolt y.Bgw.ftu y&Jt fuL÷ y&Jt htsg mhfthle btLg gtœelt ftuLx[fxhtu Che NfNu. dJobuLxlt btLg
ftuLx[[tfxhu y.Bgw.ftuvtuo.btk btLg ftuLx[[tfxhtule gtœebtkk hSMxu[Nl fhtJJtlwk hnuNu.
1 c: btLg ©uKelt ftuLx[tfxh <hefu ltuk^Keltkk «btKvºtle MJ«btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
1 f: ftb sJtcœth xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs ftb fhJt mûtb ntug <ublu s ytvJtbtkk
ytJNu. ftb yvt<t vnujt ftuLx[tfxhu ftb mkk<tu»tfthf <ubs xtRb jebexbtkk vwÁk fhJt sYhe mJj<, ylwCJ, ûtb<t ylu
VtgltLmegj hemtumo hsw fhJtlt hnuNu.
1 z: ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh mh¾gwjh,lk -
17, <t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMx[uNl Ve, heLgwyj Ve <&t yvd{uzuNl Ve
ylu btvœkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
1 R: xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkkath yluJvhtNlt ceò
hM<tytu&e mkk<wÐ ntuJtlwk btle juJtbtkk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekkd(fu su ftb fhJt, ftb vwhwk fhJt <&t ftblt
buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekkd btxu, gtzo, zevtu btxule søgt vtu<tle he<u bu¤Je
juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxule søgt)
2: yt ftble mbg bgtoœt bubtuhuLzbbt sKtJuj «btKu le hnuNu.
3: xuLzh Jujezexe rvhegz ( 120 ) rœJm mw^ele hnuNu.
4: xuLzh Ve ylu R.yub.ze.
4 y: xuLzh Ve zebtLz z[tVx &e aqfJJtle hnuNu. œhuf xuLzh œeX yjd xuLzh xuLzh Ve ChJtle hnuNu. xuLzh Ch<e JF<u yluoMxble
ChJtle hnuNu. ytuAe hfble xuLzh Ve,R.yub.ze fu xuLzh Ve, rJltlt xuLzhtu hœ ct<j (fuLmj) dKtNu.
4 c: xuLzh mt&u bwfJtbt ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhkxe/zebtLz z[tVx MJefthJtbtk ytJNu. œhuf xuLzh
œeX yjd R.yub.ze ChJtle hnuNu. R.yub.ze hfb Yt.1 fhtuz mw^ele ykœtS< hfblt ftb btxu htu¾zt, zebtLz z[tVx, cukf
duhkxelt MJYvbt <&t Yt. 1 fhtuz &e Wvhle ykœtS< hfblt ftb btxu R.yub.ze le hfb btºt zebtLz z[tVx, vu ytuzoh fu cukf
duxhelt MJYvbtk ytvJtle hnuNu. yLg ftuR he<u Chuj R.yub.ze. btLg htFJtbtk lnek ytJu ylu xuLzh hœct<j XhNu.
4 f: xuLzh Ve <&t R.yub.zele hfblt ze.ze vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlw ltb <&t btuctRj lkch ylu vtxeo ftuz yJ~g
4 z: cukf duhkxe btºt ybœtJtœ Nnuhle s MJefthJtbt ytJNu.
4 R: ytuAe hfble xuLzh Ve, R.yub.ze fu xuLzh Ve, rJltlt xuLzhtu hœ ct<j (fuLmj) dKtNu.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
5 y: xuLzh Vtubo ylu ylwmwrabtkkle œhufu œhuf Ftje søgt xuLzh Chlthu Che xuLzh ztu¾gwbuLxm vh< fhJtlt hnuNu.
5 c: fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.su ftuLx[tfxh©eytuyu hSMx[uNl heLgw fhJuj l ntug <u
ftuLx[txh©eyu xuLzh ChJt lne.
5 f: ftuLx[ftxhtuyu xuLzhbt cukflw ltb,Ft<t lkch ,btRfh lkch, mhltbw ,btu.lkch,vtxeo ftuz ,RbuRj ytRze MvÐ yûthtubt
5 z: yt xuLzhtu zwÃjefux ftuveytu mt&u Chelu Wvhtuf< mhltbu YcY/hSMxh yuze./Mvez vtuMx/ fwheyh &e rlg< mbg bgtoœtbt
btufjJtlt hnuNu.mekdj xuLzh ftuve/mne fgto Jdhle ftuve hœ fhJtbt ytJNu.
6: ftuLx[tfxhtuyu leaule ctc<tu ft¤SvwJof JtkkaJt rJlkk<e Au.
1) J^w fu ytuAtle xftJthelt œh Nçœtu <ubs ytkkfztbtkk ytvJt. xuLzh Chlthu yt he<u cl<e hfb vK Ftltbtk ltuk^Je ylu
hfbltu fwj mhJt¤tu bwfJtu.
2) ftuR fkkvlelu ltbu xuLzh juJtbkkt ytÔgwk ntug <tu fkkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk bwFðgthltbwk xuLzh
mt&u hsw fhJtlwk hnuNu.
3) ftuLx[tfxhu RLfbxuût mkkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwk fe mne fhJe.
7) xuLzhbt stu ftuR mw^tht J^tht ntug <tu <u ykdu xuLzh Ch<t vnujt AuÕju œeJmu rlg< JucmtRx y&Jt Jtuzo fauheyu sYhe
<vtm fhelu s xuLzh btufjJw.
xuLzh Chlthlu sKtJJtbtkk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt œuJtNu lrn ylu ytJe ftuR AufAtf
fu VuhVth juJtNu lrn, <ultkk jFtKbtkk ftuR Cwwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkkfzt vh Auftu bthelu <ult mtawk
jFtK fu ytkkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
8 y: xuLzh hsw fh<tkk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtkk ytÔgw lrn ntug <tu xuLzh ybtLg dKJtbkkt
ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg rlgbtu
ylu mwaltytu vK ft¤SvwJof JtkkaJt rJlkk<e Au.
ftuRvK fthK œNtoÔgt rmJtg ftuRvK fu c^t xuLzhtu yMJefth fhJtltu nf yctr^< hnu Au.
xuLxhhu ctujvtuWLx vul lt cœju Ntne Jt¤e vul &e Chujt xuLzh <whk< s ybtLg dKJtbkt ytJNu.
8 c: Wvhle ctc<tu Wvhtkk< xuLzh leault mkkstudtubtkk <h< ybtLg XhJtlu vtºt &Nu.
xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt rJd<tubtkk bwfuj Nh<
y&Jt mw^thtbtkk ftuR VuhVth mwaJ<t ntug.
xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkkÏgwk/ltkkÏgt ntug fu cœÕgwk/cœÕgt ntug.
c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
xuLzh Chlth y&Jt vuZele ctc<btkk œhuf Ctdeœth y&Jt <u ykkdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l fhu y&Jt xuLzhbt <u
btxu htFJtbtkk ytJuje søgtbtkk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
8 f: Nh<e xuLzh MJefthJtbtk ytJNu lne.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
8 z: xuLzh MJefthJw , hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe hnuNu. ftuR
fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykkdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtu fhe NfNu
lrn fu ftgœtfeg ftgoJtne yt ykkdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s œuJtlwk Au <uJtu &R NfNu lrn.
8 R: xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk ytJNu. ylu <ubtk atjw
ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
9: rJmkkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtf btklt sÚ&t ylu hfble ftuRvK Cwjawf leault rlgbtu ylwmth mhCh fhJtbtkk
xuLzh Chlthu œhlt Ftltbtkk sKtJuj Nçœtu ylu ytkkfzt Jåau ftuR ymkkdr<lt fumbtkk Nçœtubtkk sKtJuj hfb btLg htFJtbtkk ytJNu.
10 y: ftbltu «tud{um mbg bgtoœt bwsc fhJtltu hnuNu. yt mbg bgtoœt 10 jtF mw^elt ftb btxu yuj.ytu.ytR. ytÃgt
<theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃgt <theF&e 15 rœJm&e NY &guj dKJtbt
ytJNu. <&t <u mbg œhrbgtl ftble 5% juFu zevtuÍex Che fhthvºt fhJtltu hnuNu.
10 c: mûtb m•tt îtht Yt.10,00,000.00 (œm jtF) mw^elt xuLzhle bkswheltu XhtJ vtzgt ctœ ( LOI) ytvJtbtk ytJNu ðgth
ctœ rœl - 10 btk rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk
«Joðbtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
10 f: bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu suxjt rœJm ftbdehe btuze vqhe fhuj ntug <uxjt rœJmle
vulÕxe xuLzh hfb (fhth rfkb<) lt 0.1 % bwsc «r< rœJm bwsc xuLzhbtk bkswh &guj mbgbgtoœt ctœlt FhuFh ctfe
ftble hfblt bn•tb 10% juFu (jefJezexe zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
xuLzh Chuj œh vwhtk &gujt ftb btxult Au ylu <ubtk bswhe, vtjF, ÃjtLx, œuFhuF, mrJom-ftbdehe, Jes¤e, htugÕxe Jduhu <btb
Faoltu <&t sYh sKtg ðgthu ht<vt¤elt ftblu jd<t J^thtlt Faoltu mbtJuN &Nu ylu xtkkfujt CtJ fu œh fh<t J^thtle
ftuR awfJKe ykkdult <ublt ftuR œtJt ægtlbtkk juJtNu lnekk. xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu (vAe <u
ctkk^ftb rJCtdltu fboathe ntug fu l ntug) <ublu ytvuje btne<elu yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnekk.
<ublw xuLzh ChJt <&t <ubtkk swœt swœt CtJ ylu œh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu
vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtkk&e WCt &<t ftuR stuFb fu sJtcœthebtkk&e Axfe NfNu lnekk. mœh ftbbtk ftuR vK
ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
11 c: ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «Joðbtl rlgb bwsc fhJtbt ytJNu. <&t Bgwrl.
frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt ckDlf<ot hnuNu.
11 f: ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb (xuLzh bwsclwk vubuLx + yu¾Mx[t ytRxb) Wvh
% juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[[tfxhlt cejbtkk&e fvt<
12: yu)fhth mkkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce)xuLzhbtk œNtoJuj ftb mkkck^e œM<tJusbtkk œNtoJuj rJd<btkk rJmkkd<<tlt rfMmtbtk leau œNtoJuj ¢btlwmth œM<tJusbtkk
œNtoJuj rJd< d{tng htFJtbkkt ytJNu.
yu) yufb ylu fœ
(2) xuLzh Vtubolwk CtJvºtf
(3) MvuNeVefuNl
z[tuRkdbtk fœ, ytfth, ytkkfzt fœta Ftuxt ntug <tu btvujtkk fœ, ytfthlu ylwmhJwk.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
(2) xuLzh Vtubole ylwmwra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtkk yt mkkck^e Wvhefûttyu rJmkkd<<t ykdule ltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.le bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykkr<b dKJtbkkt ytJNu.
13 : xuLzhhu z[tuRkd fu MvuNeVefuNlbtkk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rl-atso Ãjtl <&t
MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
14 : yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJtle hnuNu.
15 : yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
16 : atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu <ule mkvwKo
sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR btKmlt òlbtj lu
lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vhegtœ &tg <tu <ule sJtcœthe vK ftuLxtfxhle hnuNu. CuFz ^me l
vzu <ule sJtcœthe vK vtujem Vhegtœbt ftuLx[tfxhle hnuNu. CuFz Dme l vzu <u btxu mjtb<elt vdjt (suJt fu œtuhzwk ctk^e
bswh Ftztbtkk W<thJt, mtuhekkd ylu Mx[[xekkd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtkk k k W<thNu <tu ftuLx[[tfxh s vtujem
Vhegtœbt sJtcœth hnuNu. Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu sJtcœth hnuNu lrn. Btswhtultu rJbtu vK W<thJtu.
17 : bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. bxehegÕm jtJJt fu
jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu.
18 : M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u ykdu ftb fhJt
ftuLx[tfxh ck^tgujt Au.
19: mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh< jR sJtltu hnuNu. yLg&t <ule
lwfNtlle sJtcœthe ftuLx[tfxhle hnuNu.
20 :ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au.<ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch yufx/vtujemlt ftgœtlw
vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle hnuNu.
21: ftuRvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobt hnuNu.
22: btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu hnuNu.
23: ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
24: ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t xuMxekd
fhtJJtlwk hnuNu.<&t y ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgbtulw vtjl fhJtlw hnuNu
25: yt xuLzhbtkk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ rM&<e bwsc xuLzhbtk mbtJuN l ntug <uJe J^thtle ftbdehe
fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk ytJNu ylu <u
bwsc awfJKe fhJtbtk ytJNu.
26: atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[[tfxhle hnuNu. subtkk vevzt,œtuhzt, Cgmwaf ctuzo,ÃjtMxef vxe,rJ.
ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkkvwKo sJtcœthe ftuLx[tfxhle hnuNu.
27: M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt rfMmbtk juch
yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtcœthe ftuLx[tfxhle hnuNu.
28: stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubt œhhtus fhuj ftbdehe <&t yr^ftheytuyu ftb
mw^thJt fu vtu{d{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu <u «btKu M&¤
Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle mððtt yuze.mexe yuLSlehgh©elu hnuNu.
29: œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl Nh<tu bwsc hnuNu
su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze.mexe.yuLSlegh©eltu rlKog ytFhe hnuNu.Jtuxhekd fhJtbtk lrn
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t
zucheÍ WvtzJtbtk ytJNu ylu cejbtkk&e hfb ftve juJtbtk ytJNu.
30: juch JuÕVuh Vkkz btxu ntjbtkk htsg mhfth©eyu fhuj nwfb bwsc 1%(yuf xft) hfb cejbtk&e ftve juJtbt ytJNu.
31: vhevºt lk-28 <&t ltKktFt<t vhevºt lk 31 <t.7/7/2017 îtht <t.1/7/2017 vAe cnth vtzJtbt ytJuj/ytJlth
xuLzhbt (bxehegÕm + juch mÃjtg mt&u) G.S.T lt ltuxeVefuNl bwsc G.S.T sgt jtdw vz<tu ntug ðgt mœhnw ftblt cezhu
G.S.T ltuxeVefuNl bwscle yuÃjefucujexe ægtlbt htFe xuLzhlwk cezekd fhJtlw hnuNu.
32. mefgwhexe zevtuÍex / vVtuobLm duhxele hfb Yt.1 fhtuz mw^ele ykœtS< hfblt ftb,ze.ze ,cukf duhkxelt MJYvbt <&t Yt.1
fhtuz &e Wvhle ykœtS< hfblt ftb btxu mefgwhexe zevtuÍex / vVtuobLm duhkxele hfb btºt ze.ze.,vuytuzoh, cukf duhkxe lt
MJYvbt ytvJtle hnuNu. zebtLz z[tVx / cukf duhkxe ‘‘ Bgwrl.frb§h©e ybœtJtœ ’’lt ltbltu ytvJtltu hnuNu.
33.ybœtJtœ Bgwrlrmvj ftuvoutuhuNl Bgwrlrmvj frbNlh©ele muLx[j yturVm mh¾gwjh lk 41 bwsc xuLzhhyu ltufheœt<t <hefu
hSMxu[Nl Vhrsgt< fhtJJtlw hnuNu.
34.ybœtJtœ Bgwrlrmvj frbNlh©ele <t.16.02.23 le bkswhe bwsc “ «J<obtl S.yum.xe. J^thtltu awfJJtbtk ytJNu”
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
yufhthlwk Vtubo
1) nwk /ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk buk/ybu M&¤le bwjtft< je^e Au
ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je
2) nwk /ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t œM<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk/Aeyu.
ftuLx[tfxhle mne ylu rmfft
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
TECHNICAL SPECIFICATIONS
SPECIFICATIONS OF MATERIALS
1.1. Water shall not be salty or brackish and shall be clean, reasonably clear and free objectionable
quantities of silt and traces of oil and injurious alkalis, salts, organic matter and other deleterious
material which will either weaken the mortar or concrete or cause efflorescence or attack the steel
in R.C.C Container for transport, storage and handling of water shall be clean. Water shall conform
to the standards specified in I.S.456-1978.
1.2. If required by the Engineer-in-charge it shall be tested by comparison with distilled water.
Comparison shall be made by means of standard cement tests for soundness, time of setting and
mortar strength as specified in I.S.269-1976. Any indication of unsoundness, change in time of
setting by 30 minutes or more or decrease of more than 10 per cent in strength of mortar prepared
with water sample when compared with the results obtained with mortar prepared with distilled
water shall be sufficient cause for rejection of water under test.
1.3. Water for curing mortar, concrete or masonry should not be too acidic or too alkaline. It shall be
free of elements which significantly affect the hydration reaction or otherwise interfere with the
hardening of concrete during curing or those which produce objectionable stains or other unsightly
deposits on concrete or mortar surfaces.
1.4. Hard and bitter water shall not be used for curing.
1.5. Portable water will be generally found suitable for curing mortar or concrete.
3.1 Cement shall be ordinary Portland slag cement as per I.S. 269-1976 or Portland slag cement as per
M-4. White Cement :
4.1 The white cement shall conform to I.S. 80412-E
M-5. Coloured Cement:
5.1 Coloured cement shall be with white or gray Portland cement as specified in the item of the work.
5.2 The pigments used for coloured cement shall be of approved quality and shall not exceed 10% of
cement used in the Mix. The mixture of pigment shall be properly grounded to have a uniform
colour and shade. The pigments shall have such properties to provide for durability under exposure
to sunlight and weather.
5.3 The pigment shall have the property such that it is neither by the cement nor detrimental to it.
6.1. Sand shall be natural sand, clean, well graded, hard strong durable and gritty particle free from
injurious amounts of dust clay, kankar nodules, soft or flaky particles shale, alkali, salts organic
matter, loam, mica or another deleterious substance and shall be got approved from the Engineer-in-
charge. The sand shall not contain more than 8 percent of silt as determined by field test. If
necessary the sand shall be washed to make it clean.
6.2. Coarse Sand : The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed
The sieve analysis of coarse shall be as under:
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation Passing Sieve Designation Passing Sieve
6.3 Fine Sand:The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand shall be as
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation Passing Sieve Designation Passing Sieve
M-8. Stone Grit:
8.1. Grit shall consist of crushed or broken stone and be hard strong, dense, durable, clean, of proper
gradation and free from skin or coating likely to prevent adhesion of mortar Grit shall generally be
cubical in shape and as far as possible flaky elongated pieces shall be avoided. It shall generally
comply with the provisions of I.S. 383-1970. Unless special stone of particular quarries is
mentioned, grit shall be obtained from the best black trap or equivalent hard stone as approved by
the Engineer-in-charge. The grit shall have no deleterious reaction with cement.
8.2. The grit shall conform to the following gradation as per sieve analysis:
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation through Sieve Designation through Sieve
8.3. The crushing strength of grit will be such as to allow the concrete in which it is used to used to built
up the specified strength of concrete.
8.4. The necessary tests for grit shall carried out as per the requirements of I.S.2386(Parts I to VII)
1963, as per instructions of the Engineer-in-charge. The necessity of test will be decided by the
Engineer-in-charge. The necessity of test will be decided by the Engineer-in-charge.
Sand: Sand Shall conform to specification M-6.
10.1. Proportion of Mix : 10.2.1. Mortar shall consist of such proportions of slaked lime and sand as
may be specified in the item. The slaked lime and sand be measured by volume.
10.2. Preparation of Mortar :
10.3.1. Lime mortar shall be prepared by wet process as per I.S. 1625-1971. Power driven mill shall be
used for preparation of lime mortar. The slaked lime shall be placed in the mill in an even layer and
ground for the 180 revolutions with a sufficient water. Water shall be added as required during
grinding (care being taken not to add more water) that will bring the mixed material to a
consistency of stiff paste. Thoroughly wetted sand shall then be added evenly and the mixture
ground for another 180 revolutions.
10.3. Storage : 10.4.1 Mortar shall always be kept damp, protected form sum and rain till used up
covering it by tarpaulin or open sheds.
10.4. Use : 10.5.1 All mortar shall be used as soon as possible after grinding it should be used on the day
on which it is prepared. But in no case mortar made earlier than 36 hours shall be permitted for use.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
TECHNICAL SPECIFICATIONS:
Following technical specifications shall be applicable to the relevant items of BOQ
Work name :- INTERLOCKING PAVER BLOCK PAVING AT SAIJPUR LAKE & PARKING
PLOT IN GHATAK-3 OF SAIJPUR WARD IN NORTH ZONE
Item No:1 Dismantling the following including loading, unloading and disposal of
unserviceable material for all lead or as directed by Engineer-In-Charge and stacking the
serviceable material and backfilling the resulting trenches and pits complete.
a. central verge -kerb stone
b. Dismantling tiled or stone floors laid in mortar including stacking of serviceable
material and disposal of uservicalble material with all lead and lifts.
c. Demolition & disposal of unservisable material with all lead and lift for unreinforeced
concrete. (AMC sor)
d. Demolition of brick work & stone masonry including stacking of serviceable materials
and disposal of unserviceable materials with all lead and lift (1) In cement mortar.
e.Demolition including stacking of serviceable materials and disposal of unserviceable
materials with all lead and lift. (I) R.C.C work.
The demolition shall consist of demolition of one or more parts of the structure as specified or shown in the drawings. Demol
implies taking up or down or breaking up. This shall consist of demolishing whole or part of work including all relevant item as specifi
or shown in the drawings.
The demolition shall always be planned before hand and shall be done in reverse order of the one in which the structure w
constructed. Contractor is fully responsible for proper and safe demolition.
Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work or property, which is to
intact, before dismantling and demolishing is taken up and the work shall be carried out in such a way that no damages is caused
the adjoining property.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary precautions shall be taken to keep t
nuisance down as and where necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to be damaged by dropping from a height
demolishing roof, masonry etc. shall be carefully dismantled first. The dismantled articles shall be properly stacked as directed.
All materials obtained from demolition shall be the property of Government unless otherwise d shall be kept in safe custody u
handed over to the Engineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out and stacked properly as directed, with
lead and lift. All unserviceable materials, rubbish etc. shall b stacked as directed by the Engineer-in-charge.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
Mode of measurements & payment :
Measurements of all work except hidden work shall be taken before demolition dismantling and no allowance for increase in bul
be allowed. The demolition of lime concrete shall be measured under this item. Specification for deduction for voids, openings e
shall be on same basis as that employed for construction of work.
All work shall be measured in decimal system as fixed in its place subject to the following limits, unless otherwise stated hereinafte
(a) Dimensions shall be measured to the nearest 0.01 mt. (b) Area shall be worked out to the nearest 0.01 sq. mt. (c,d,e) Cub
connection shall be worked out to the nearest 0.01 Cu.m.
The rate shall include cost of all labour involved and tools used in demolishing and dismantling including scaffolding. The rate shall a
include the charges for separating out and stacking the serviceable materials properly and disposing the unserviceable materi
all lead and lift. The rate also includes for temporary storing for the safety of the portion not required to be pulled down or
adjoining property and providing temporary enclosures or partitions where considered necessary.
The rate shall be for a unit of one cubic metre.
For Dismantling of Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors laid on mortars shall be done Dismantl
implies carefully taking up or down or these are fixed by nail screws bolts etc. the shall be taken out with proper tools.
Mode of measurement & Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate shall include stacking t
unserviceable materials as directed will lead and lift.
The rate shall be for a unit of (a) RMT (b) one sq. Meter (C) CMT(d)Cu.m(e)Cu.m
Item No:2 Extra rate over item of excavation of earth for excavation of asphalt pavement
/ RCC of thickness up to 0.20 meter including demolishing the asphalt carpet, metal,s
oiling/cutting Reinforcement etc.comp. with stacking the material as directed. (Based on
Previously approved rate by C E sir )
a.up to 0.20 meter thickness (By Manual)
b.0.20 to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter machine including
cost of operator, fuel, & transportation etc complete.
c.0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter machine
including cost of operator, fuel, & transportation etc complete.
The Item shall be carried out as per Item description and as per instruction of Engineer-in-Charge and/or his authorized representativ
The rate includes the cost of excavation of bituminous macadam i.e. bituminous layers only like DBM, BC etc including the lab
tools, equipment and all other incidental expenses. Non Bituminous Sub-layer/Sub base are not considered in this item.
Work shall be carried out manually or by Machinery as per site requirements.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
The mode of payment for this item shall be on Smt. Basis.
Item No:3 Box cutting the road surface to proper slope and camber for making a base for
road work including removing the excavated stuff and depositing on the road side slope as
directed upto 200 Mt.lead
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such ordinary excavating implement
organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials and rubbish of all kind, bu
wood and trees shall be removed as directed. The materials so obtained shall be property of the Government and be conveyed a
stacked as directed. within 200 M. lead. The roots of the trees coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be paid.
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall assume full responsibility
alignment, elevation and dimension of each and all parts of the work. Contractor shall supply laborers, materials, etc. requi
setting out the reference marks and bench marks and shall maintain them as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and depth as shown in the drawings
as directed. The contractor shall do the necessary shoring and shutting or providing necessary slopes to a safe angle, at his own
The payment for such precautionary measures shall be paid separately if not specified. The bottom of the excavated area shal
evened both longitudinally and transversely. as directed by removing and watering as required. No earth filling will be allowed
bringing it to level, if mistake or any other reason excavation is made. deeper or wider that shown on the plan or directed. The ex
depth or width shall be made up with concrete of same proportion as specified for the foundation concrete at the cost of t
contractor. The excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the ground in layer includ
ramming and watering etc. The balance of the excavated quantity shall be removed by the contractor from the site of work to a
as directed with lead upto 200 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of trenches shown on the dra
or as per sections given by the Engineer-in-charge. No payment shall be made for surplus excavation made in excess of abo
requirements or due to slopping and sloping back as found necessary on account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Item No:4 Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage,
sludge, excavated rock, fly ash, aggregates of any kind executed outside the road site. Rate
also includes spreading & levelling etc complete. Internal conveyance above 50 mt done
within the work site is not payable.
f) Lead From 5 Km to 10 Km.
g) Lead From 10 Km to 15 Km.
Disposal of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash, aggregates of any kind is subject
the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off within a lead of 200 meters or as per instructi
given by Engineer in charge. Useful materials obtained from clearing site and excavation shall be stacked and used within the work si
Internal conveyance above 200 mt within the work site i.e. From starting chainage to End chainage of a given road WILL NOT
PAYABLE. Materials suitable for construction of Embankment, earthen shoulder and subgrade shall be stacked at convenient plac
within a work site for reuse. No extra payment will be paid to the contractor for stacking of earth within the work site and reu
the construction of Embankment layer, sub grade and earthen shoulder purpose. Only surplus earth shall be disposed off outs
work site as per instruction given by Engineer-In-charge. Useful stones from rock excavation shall be stacked nearly within a lead of
M. and will be allowed to be used by the contractor on payment at rates laid down in the contract or if not so aid down, at schedule
rates of the Division or at a mutually agreed rates if there are no such rates in the Schedule of rates.
If surplus materials are required to be conveyed outside the work site i.e. Outside conveyance from a particular stretch of given ro
will be paid in this item as per instruction of Engineer in charge. No bulkage of disposed earth will be considered for the payment.
The rate shall be for a unit of one cubic meter.
Item No:5 Providing, laying, spreading and compacting graded stone aggregate to wet
mix macadam specification including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers
in sub- base / base course on well prepared surface and compacting with vibratory roller to
achieve the desired density as per Codal Provision.
Production & Supply of WMM
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular material, premixed with water,
dense mass on a prepared sub-grade/sub- base/ base or existing pavement as the case may be in accordance with the requirements
these Specifications. The material shall be laid in one or more layers as necessary to lines, grades and cross-sections shown on t
approved drawings or as directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When vibrating or other approved types
compacting equipment are used, the compacted depth of a single layer of the sub-base course may be upto 200 mm with the appro
of the Engineer.
Physical Requirements
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Coarse aggregates shall be crushed stone. The aggregates shall conform to the physical requirements set forth in Table
Sevaliya/Timba/Ankodiya special aggregate is only acceptable.
If the water absorption value of the coarse aggregate is greater than 2 percent, the soundness test shall be carried out on the mater
delivered to site as per IS:2386 (Part-5).
Table 19-1 : Physical Requirements of Coarse Aggregates for Wet Mix Macadam for Sub-base/Base Courses
S. No. Test Test Method Requirements
1. Los Angeles Abrasion value or IS:2386 (Part-4) 40 percent (Max.)
Aggregate Impact value
IS:2386 (Part-4) or 30 percent (Max.)
2. Combined Flakiness and Elongation indices (Total)
IS:2386(Part-1) 35 percent (Max.)*
* To determine this combined proportion, the flaky stone from a representative sample should first be separated out. Flakiness index is weight of flaky stone m
divided by weight of stone sample. Only the elongated particles be separated out from the remaining (non-flaky) stone metal. Elongation index is weight of elonga
particles divided by total non-flaky particles. The values of flakiness index and elongation index so found are added up
Grading Requirements
The aggregates shall conform to the grading given in Table 19-2.
Table 19-2 : Grading Requirements of Aggregates for Wet Mix Macadam
IS Sieve Designation Percent by weight passing the IS Sieve
600 micron 8-22
Material finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be graded from coarse to fine and shall not vary from the low limit on one sie
to the high limit on the adjacent sieve or vice versa.
Construction Operations:-
Preparation of Base
The surface of the sub-grade/sub-base/base to receive the Wet mix macadam course shall be prepared to the specified gr
camber and cleaned of dust, dirt and other extraneous material. Any ruts or soft yielding places shall be corrected in an app
manner and rolled until firm surface is obtained.
Where the Wet mix macadam is to be laid on an existing metalled road, damaged area including depressions and potholes shall
repaired and made good with the suitable material. The existing surface shall be scarified and re-shaped to the required grade a
camber before spreading the coarse aggregate for Wet mix macadam.
Preparation of Mix
Wet Mix Macadam should be prepared in an approved mixing plant of suitable capacity having provision for controlled addition
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
water and forced/positive mixing arrangement like pugmill or pan type mixer of concrete batching plant. For small quantity of wet m
work, the Engineer may permit the mixing to be done in concrete mixers.
Quantity of water should not vary from OMC determined as per IS : 2720 (part VIII) by more than agreed limit. The mixed mater
should be uniformly wet and no segregation should be permitted.
Spreading of mix
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared subgrade/sub-base/base in requir
quantities. In no case should these be dumped in heaps directly on the area where these are to be laid nor shall their hauling ove
partly completed stretch be permitted.
The mix may be spread either by a paver finisher or motor grader or as per instruction of Engineer-in-Charge and/or his authoriz
representative. For portions where mechanical means cannot be used, manual means as approved by the Engineer shall be used. T
motor grader shall be capable of spreading the material uniformly all over the surface. Its blade shall have hydraulic control suita
for initial adjustments and maintaining the same so as to achieve the specified slope and grade.
The paver finisher shall be self-propelled, having the following features:
(i) Loading hoppers and suitable distribution mechanism
(ii) The screed shall have tamping and vibrating arrangement for initial compaction to the layer as it is spread without rutting
otherwise marring the surface profile.
(iii) The paver shall be equipped with necessary control mechanism so as to ensure that the finished surface is free from surfa
The surface of the aggregate shall be carefully checked with templates and all high or low sports remedied by removing or add
aggregate as may be required. The layer may be tested by depth blocks during construction. No segregation of layer and fine partic
should be allowed. The aggregates as spread should be of uniform gradation with no pockets of fine materials.
After the mix has been laid to the required thickness, grade and crossfall/camber the same shall be uniformly compacted, to the f
depth with suitable roller. If the thickness of single compacted layer does not exceed 100 mm, smooth wheel roller of 80 to
weight may be used. For a compacted single layer upto 200 mm, the compaction shall be done with the help of vibratory roller
minimum static weight of 80 to 100 kN or equivalent capacity roller. The speed of the roller shall not exceed 5 km/h.
In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower edge and progress gradua
towards the upper edge. Thereafter, roller should progress parallel to the centre line of the road, uniformly over-lapping ea
preceding track by at least one third width until the entire surface has been rolled. Alternate trips of the roller shall be terminated
stops at least 1 m away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward until the edges have bee
compacted. The roller shall then progress gradually towards the centre parallel to the centre line of the road uniformly overlapp
each of the preceding track by at least one-third width until the entire surface has been rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any other cause shall be corrected at once
specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly compacted with mechani
tampers or a plate compactor. Skin patching of an area without scarifying the surface to permit proper bonding of the added m
shall not be permitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like motion in the sub-base/base course
subgrade. If irregularities develop during rolling which exceed 12 mm when tested with a 3 metre straight edge, the surface should
loosened and premixed material added or removed as required before rolling again so as to achieve a uniform surface conforming
the desired grade and crossfall. In no case should the use of unmixed material be permitted to make up the depressions. Roll
be continued till the density achieved is at least 98 per cent of the maximum dry density for the material as determined by the meth
outlined in IS : 2720 (Part-8).
After completion, the surface of any finished layer shall be well-closed, free from movement under compaction equipment or a
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
compaction planes, ridges, cracks and loose material. All loose, segregated or otherwise defective areas shall be made good to the f
thickness of the layer and recompacted.
Setting and drying:
After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours.
Opening to Traffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam surface till it has dried and the wear
Surface Finish and Quality Control of Work
Surface evenness:
The surface finish of construction shall conform to the requirements of Clause in Item No. 16&17&18.
Quality control:
Control on the quality of materials and works shall be exercised by the Engineer as per Table 19-3.
Table 19-3 : Test and Frequency for Materials for Wet Mix Macadam
Type of Test Frequency IS Code
Construction (As per Circular No. 66)
Wet Mix Gradation One test per 200 Cu.m. IS:2386, Part-I-1963
Aggregate Impact Value One test per 1000 Cu.m. IS:2386, Part-IV
Combined Flakiness and One test per 500 Cu.m. IS:2386, Part-I
Elongation Indices
Atterberg Limits of portion of One test per 200 Cu.m. IS:2720, Part-V
aggregates passing
425 micron sieve
Density of compacted layer One set of three tests per IS:2720, Part-VIII
Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or where the course is otherw
defective due to subgrade soil getting mixed with the aggregates, the full thickness of the layer shall be scarified over the affect
area, reshaped with added premixed material or removed and replaced with fresh premixed material as applicable and recompacte
The area treated in the aforesaid manner shall not be less than 5 m long and 2 m wide. In no case shall depressions be filled up w
unmixed and ungraded material or fines.
Arrangement for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor shall take all necessary measures
the safety of traffic during construction and provide, erect and maintain such barricades, including signs, marking, flags, lights a
flagmen as per instruction of the Engineer-in-charge.
Measurements for Payment
The rate shall be for a unit of one cubic meter.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Item No:6 Repairing damaged M.H. and rasing M.H. up to road level incl. removing
damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3
and fixing C.I. steps and existing MH sheet cover, removing the debris from MH and
carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
(D) up to 0.90 mt. (@ Ten Coarse )
This item relates to repairing work of above item of machine hole with fixing existing seat at top & fixing pre-cast FRC cover (mediu
duty) repairing up to 2.00 mt. depth. This item relates to repairing existing machine hole of 1.40 x 1.00 or 1.00 x 0.75 mt. size w
removing first existing seat & cover including demolishing existing loose masonry work up to from GF level to depth if specified & up
same height brick work in CM 1:5 shall be completed & after of that work plastering work in CM 1:3 shall also be done. Rate i
fixing existing or new (if not there) C.I. steps shall fixed at time of masonary work. After completion of brick work & plastering sam
machine hole seat & cover fixing at top & casted it in C.C. 1:2:4 etc. Measurements shall be given on no. of basis up to 2.00 mt. dep
For detailed specification refer R & B Department booklet for General Technical Specification for building works.
Items also includes:
1. Proper Barricading to avoid accidents.
2. Removal of debris from site.
3. Compaction of Bitumen by Roller.
4. Applying tack coat before laying of Hotmix material.
The mode of payment for this item shall be on No. Basis.
Item No:7 Repairing damaged I.C./ Raising removing damaged brick work and repairing
by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing
chamber sheet cover, removing the debris from chamber and carting the same as directed.
The mode of payment for this item shall be on No. Basis.
Item No:8 Providing F.R.C. MH seat cover incl. carting to the work site etc. comp.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
a. (SET cover and frame) F.R.C. Extra Heavy Duty [EHD-35] Machinehole Covers &
Frame- 560mm ø clear opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table 1 (As Per Central stores circular
b. (SET cover and frame) F.R.C. Heavy Duty [HD-20] Machinehole Covers &
Frames- 560mm ø clear opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table 1(As Per Central stores circular
c. (SET cover and frame) F.R.C. Medium Duty [MD-10] Machinehole Covers &
Frames- 560mm ø clear opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table 1 (SET cover and frame) (As
Per Central stores circular No. 11 /2022-23 Dt.14.3.2023)
The rate shall be for a unit of per set.
Item No:09 Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for
Footpath in M-20 grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba
or equivalent quality for pre-cast blocks, reasonably exposed finish/ formwork , mould
with well equipped with vibratory system for kerb stones of approved design including
curing, etc. complete, including the cost of formwork etc. complete. The rate shall also
include necessary cutting of asphalt, fixing the Kerb stones in line and level on 5 cm thick
sand bedding with necessary equipments and materials. The rate shall also include the
flush pointing in CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides of
the kerb stone fixed with Bituminous concrete mixed in proper position as directed by
Engineer in change to form a portable mixture. In any case Gravel or such type of
materials shall not be allowed for production. a) Laying on 5 cm thick Sand Bedding
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
The specifiction of following materials shall be conforming with specification mentioned for relavent material / items in Ge
technical specification for building work of R&B Department of Gujarat.
Water shall conform to M-1
Graded stone aggregate 20 mm. nominal size to M-10
Contractor shall have to manufacture the blocks as per the dimensions given in the drawing. Specific machineries shall be use
manufacture the precast blocks. These machineries should be compatible to produce blocks of required strength and dimensions.
machine shall contain hydraulic Press or advanced equipment to generate required compaction & Grade and finish. Moulds/ Ste
Plates/ Dies of the machine shall be dimensionally checked & to be got approved before commencing the production. Contractor
prepare proper Drying Yard for keeping the blocks before curing. The drying yard shall be levelled and covered so that no sh
cracks are formed. Contractor shall prepare adequate size curing pond to cure the blocks for not less than 21 Days. No other means
curing shall be allowed. The technical specification of concrete shall confirm to IS 456-2000. The concrete mix is not required to
designed and only nominal mix as per IS: 456-2000 shall be followed. The proportion of the concrete mix shall be 1:1.5:3 (1 ceme
1.5 coarse sand: 3 graded stone aggregate 20 mm. nominal size) by volume. Concrete work shall have fairly exposed concrete surfa
or as specified in the item. The designation ordinary M-10, M-15, M-20, M-25 specified as per I.S. corresponds approximately to 1:3
1:2:4, 1:1.5:3 and 1:1:2 nominal mix of ordinary concrete, by volume respectively. The ingredients required for ordinary concre
containing one bag of cement of 50 Kg. by weight (0.0342 m3.) for different proportions of mix shall be as per IS 456-2000. T
proportion of the aggregate for the kerb stone shall be modified as per the approval of the engineer-in-charge. The water ceme
ratios shall not be more than those specified as per IS. The cement of the mix shall be increased, if the quantity of water in a mix has
be increased to overcome the difficulties of placement and compaction so that the water cement ratio specified in the table is n
exceeded. The maximum size of coarse aggregate shall be as large as possible within the limits specified but in no case great
1/4th of the minimum thickness of the member, provided that the concrete can be placed without difficulty so as to surround
reinforcement thoroughly and to fill the corners of the form. For reinforced concrete work, coarse aggregates having a nomina
20 mm. are generally considered satisfactory. Admixture shall be used in concrete only with approval of the Engineer-in-charge bas
upon the evidence that with the passage of time, neither the compressive strength of concrete is reduced nor are other requis
qualities of concrete impaired by the use of such admixtures.
Proportioning shall be done by volume, except cement which shall be measured in terms of bags of 50 kg weight. The volume of
such bag can be taken as 0.0342 m3. Boxes of suitable sizes shall be used for measuring sand and aggregate. The size of the box
(internal) shall be 30cm. x 30 cm. and 38 cm. deep. While measuring the aggregate and sand, the box shall be filled without s
ramming or hammering. The proportioning of sand shall be on the basis of its dry volume and in case of damp sand; allowances
bulk age shall be made.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be kept in first class w
condition and maintained throughout the construction. Measured quantity of aggregate, sand, and cement required for each bat
shall be poured into the drum of the mechanical mixer while it is continuously running. After about half a minute of dry
measured quantity of water required for each batch of concrete mix shall be added gradually and mixing continued for another o
and a half minute. Mixing shall be continued till materials are uniformly distributed and uniform colour of the entire mass is obtain
and each individual particle of the coarse aggregate shows complete coating of mortar containing its proportionate amount of ceme
In no case shall the mixing be done for less than 2 minutes after all ingredients have been put into the mixer. Mixers which have be
out of use for more than 30 minutes shall be thoroughly cleaned before putting in a new batch. Unless otherwise agreed to by t
Engineer-in-charge, the first batch of concrete from the mixture shall contain only 2/3rds of normal quantity of coarse aggrega
Mixing plant shall be thoroughly cleaned before changing from one type of cement to another.
The degree of consistency which shall depend upon the nature of the work and methods of vibration of concrete shall be determ
by regular slump tests in accordance with IS: 1199-1959. The slump of 10 mm. to 25 mm. shall be adopted when vibrators are used.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
All Moulds shall be cleaned and made free from standing water, dust, snow, or ice immediately before placing of concrete.
Formwork/Metal Mould for exposed concrete surface (If indicated):
All the moulds shall be checked for exact dimensions of the precast blocks. All the edges of the precast blocks shall confirm the pro
of the final drawing & edges/ curvatures of the moulds shall be checked accordingly. Moulds shall be regularly checked for correctne
of dimensions of Blocks, twists, bends due to handling, etc. Before starting every days work.
Care shall be taken to set all form work/Mould in perfect line, level (or in required camber or slope as specified) and plumb. Fo
work/Mould propping shall be strong, rigid, and sturdy. The form work/Mould shall be as per pattern & design shown in drawi
Form work/Mould shall be done accurately and precisely so as to achieve neat, clean and smooth concrete surface, in line, level a
plumb. Clinks, twists, offsets, warps, riveting etc. in plates or forms shall not be allowed. Before placing concrete, forms
thoroughly cleaned off of all rust, dust, and loose materials. Colourless oil or grease of approved quality shall be applied before plac
steel. Also the form work material will be of wood/plywood/steel or any sort of such material, as approved by the Engineer-in
and/or his authorized representative; so that all exposed concrete surfaces have uniform colour.
For all kind of exposed concrete work only one brand (to be approved by the Engineer-in charge) of cement shall be used.
Removal of Moulds:
Specific time shall be identified for removal of moulds, such that the concrete of the precast blocks shall gain strength to withstand t
stresses generated due to self weight and handling to drying yards without any deformation to shape/ dimensions/ edges.
Sufficient time shall be given to the block after it is removed from the mould so that it can gain strength and dry in shade to preve
any cracks due to shrinkage. This shall be done in drying yards.
Curing of block shall be done only in curing pond and curing shall be done for minimum 14 days.
Drying period after removing from pond & before delivery to site: Water should be drained of from the block before it is actually se
to the site. Time should be provided for proper draining of water which may be present in the block kept for curing in the pond.
Precaution shall be taken while transporting of the blocks to site.
The blocks should be loaded and unloaded with due care so as to avoid generation of stresses leading to breaking of block. Care shou
be taken to prevent the block from breaking during transporting.
The pits of the size 150mm in width and required depth shall first be excavated, true to line and level. The relevant specifications
item A- 1 shall be followed for excavation work. The pits shall be filled with a layer of 50mm. thick sand bedding. The curbs then sh
be placed in position of which 50mm. shall be below road. Care should be taken to maintain proper line and level. The joints betwe
the kerbs shall be pointed with C.M. 1:2 and cured for minimum seven days.
Sampling and testing of concrete:
Samples from fresh concrete shall be taken as per IS : 1199-1959 and cubes shall be made, cured and tested at 7 days or 28 days
per requirements in accordance with IS : 516-1959. A random sampling procedure shall be adopted to ensure that each concrete ba
shall have a reasonable chance of being tested i.e. the sampling should be spread over the entire period of concreting and co
At least 1 sample shall be taken from each shift. Ten test specimens shall be made from each sample, 5 for testing at 7 days, and t
remaining 5 at 28 days. The samples of concrete shall be taken on each day of the concreting as per above frequency. The numb
specimens may be suitably increased as deemed necessary by the Engineer-in-charge when procedure of tests given above reveal
poor quality of concrete and in other special cases. The average strength of the group of cubes cast for each day shall not be less th
the specified cube strength of 200 Kg/cm2 at 28 days. 20% of the cubes cast for each day may have value less than the specif
strength provided the lowest value is not less than 85% of the specified strength. If the concrete made in accordance with t
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
proportions given for a particular grade, does not yield the specified strength, such concrete shall be classified as belonging to t
appropriate lower grade. Concrete made in accordance with the proportions given for a particular grade shall not, however, be
in a higher grade on the ground that the test strength are higher than the minimum specified. If rock pockets/honeycombs in t
opinion of Engineer-in-charge are of such an extent or character so as to affect the strength of the structure, materially or to endang
the life of the steel reinforcement, he may declare the concrete defective and require the removal and replacement of the portion
the structure affected.
Precast Kerb Stones:
The relevant specifications of concreting as per item above shall be followed except that work shall be carried out for precast concre
kerb stones as specified in the item. All Precast members shall be cast at workshop. Sufficient curing shall be done before placement
the same the method of transporting and placing the precast members shall be as approved by the Engineer-in-charge. Memb
shall be so transported that no breakage or undue stresses are induced in them. If required, all members shall have a key provided
both the faces i.e top and bottom surfaces, of adequate size so as to fill the same with concrete while laying. The function of this key
to avoid the leakage through the joint between the precast member and the member on which it is laid.
Mode of Measurements and Payment :
The rate shall include cost of formwork and cost of reinforcement. The volume occupied by reinforcement shall not be deducted fro
The rate shall be for a unit of Rmt.
Item No:10 Providing and Laying of Rubber Moulded Paver Block Grey/Coloured
mm thick, M-35 Grade of any size ; shape (Usually Uni-Paver Blocks) using black trap
good quality aggragate of 20 mm nominal size for footpath, parking areas, service
lanes and other areas as mentioned in the drawing / instruction of engineer in charge.
Cost includes formworks using rubber mould, Rate providing and laying paver blocks as
per required grading and specification. The paver block shall be mechanically compacted.
The work of paving blocks shall be executed in line and level by skill mason of flooring
work only. It should be laid in such a way that the no cutting of the paver block to be
necessary. if cutting of paver block necessary then it should be cut by machine only and
carting. The finished surface of the paver block shall have resonably good, plain finished.
Paver blocks shall be compacted and shall be relaid if necessary. Gravel or such type of
materials shall not be allowed for production. Laying on 5cms thick sand beddding.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
21.1 Scope of work :
Excavation and compaction up to 300 mm in height for footpath paving in all sorts of soil murrum including sorting outs and stack
of useful materials stuff up to 50mt.
The scope of work includes manufacturing, supplying, and lying of precast paver blocks at various Retail outlets. The work in
Verification of the existing site condition and advising our project in charge to lay suitable base course if required. Contracto
required to satisfy themselves with quality of sub grade, sub-base course before the paver blocks are laid and suggest strengthenin
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks. Manufacturing of paver blocks in yo
plant as per requirements in technical specification enclosed. Supplying of paver blocks at site, including handling at both ends.
Laying of paver blocks at site as per requirement in technical specification on 50 mm thick sand bedding, within shortest possible ti
the site is public place hence care should be taken to ensure that the routine activities should not be disturbed. The job of laying m
required to be carried out during night also.
Testing of paver blocks shall through reputed Govt. /Non Govt. Test house only and submission of test results as per requirem
Technical Specifications. AMC reserves the right to carryout test at random. Cost for such tests to be borne by party. The contrac
shall guarantee that all material and components designed, fabricated, supplied, and laid by him shall be free from any type of def
due to faulty material and/or workmanship/erection for a period of One year from the date of completion of work. However, t
contractor one year's shall render free maintenance.
TECHNICAL SPECIFICATIONS:
21.2 Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
21.2.1 Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level of compaction by application
hydraulic compaction and also by high intensity vibration to the moulds. The machine should have automatic control panel
for uniformity in strength.
21.2.2 Concrete Batching & Mixing Plant: (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient should be mixed in concre
Batching & Mixing plant with minimum capacity of 30 cum/hour. The plant should equipped with automatic control panel
maintaining water cement ratio from batch to batch to obtain concrete of uniform quality and strength. The plant should
equipped with adequate mechanism for mechanized loading of raw materials into mixer and conveyor belt for transportati
of concrete from mixer to concrete block making machine to maintain quality of wet cement.
21.2.3 The factory should have well designed curing area to ensure adequate curing of paver blocks.
21.2.4 Laboratory (Desirable but not essential) :
The testing equipment should have required in the Laboratory as per the following:
A Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
Systematic record of test results of various paver blocks manufactured in the factory.
Concrete Mix Design for various grade of concrete used for making of paver blocks.
21.3 Specifications For Coloured Paver Blocks:
Coloured concrete paver blocks shall be manufactured as per attached specifications using or equivalent approved colo
Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum colour pigment of 3% by weight of ceme
The colour shade shall be “RED” as selected by AMC before commencement of the work. White cement shall be used
colored pavers to obtain the desired colour shade. The job also includes providing 50 mm thick sand bedding to match t
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from the date of laying
the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be as per attachment.
21.4 Pavers Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the same should be retained until t
laying. The surface should be reasonably smooth and of anti skid and anti glare type. The paver should have uniform chamfe
to facilitate easy drainage surface run off. The pavers should have uniform interlocking space of 2mm to 3mm to ensu
compacted sand filling after vibration on the paver Surface. The concrete mix design should be followed for each batch
materials separately and automatic batching plant is to be used to achieve uniformity in strength and quality. The pavers sh
be manufactured in single layer only. Skilled labour should be employed for laying blocks to ensure line and level of layi
desired shape of the surface and adequate compaction of the sand in the joints. The pavers shall be of cement gray colo
without any pigment & for coloured pavers refer “specifications for coloured pave`” The pavers are to be skirted all rou
with kerbing using solid concrete blocks of size 150mm X 250mm X 380mm. The kerbing should be embedded for 100m
depth. The concrete used for kerbing shall be cured properly for 7 days minimum.
21.5 Paver Block Dimensions:
Thickness 60 mm
Shape Unipaver, I shape or directed by Addl.C.E.
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use of any pigment.
For coloured pavers refer “specifications for coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
21.6 Testing of Paver Blocks :
SR. NO. * TEST Average Values Frequency
1. Compressive Strength Min. 35 N/Sq mm for 60mm thick
250 Smt / 1 Test
2. Flexural Strength Minimum 4.5 N/Sq mm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
* Sampling and testing procedure as per enclosed specifications
21.7 Sampling and Testing Procedure for Paver Blocks
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
21.7.1 Sampling for Testing
Sampling of Paver blocks.
Method of sampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks, shall be divided into t
approximately equal groups. Three blocks shall be drawn from each group.
Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated section of part thereof, and t
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid damage to the paving in tran
Protect the paving from damage and contamination until they have been tested. The testing shall be carried as soon
possible, after the sample has been taken. As soon as practicable after sampling. The samples shall be stored in water at
degree C 5 degree C for 24 hours prior to testing.
The item is to be executed as per instructions and to the entire satisfaction of Engineer-in-Charge and/or his authoriz
representative using Rubber mould and Table vibrator for Kerb instead of mechanical press system.
Extra rate for excavation of asphalt payment of any thickness including demolishing the asphalt carpet, metal, soling e
complete with stacking the materials as directed. The road surface of asphalt shall carefully be opened to full width
directed by the Engineer-in-Charge and/or his authorized representative.
Excavation area shall be properly identified and marked in rectangular shape. The road crust shall be opened up to ent
depth i.e. including soling. All the materials shall be separately deposited in such a way and in places as may be determined
the Engineer-in-Charge and/or his authorized representative. In case rubble not being so deposited or being mixed up w
the excavated materials will not be allowed for refilling. The cost of materials shall be charged from the contractor. T
decision of the C.E. shall be final and binding to the contract
For detailed specification for Laying of Paver Block on sand bedding, refer R & B Department booklet for General Techni
Specification for building works.
The rate shall be for a unit of SMT
Item No:11 Providing and laying cement concrete 1:5:10 (1- Cement : 5- fine sand : 10-
graded brick bat aggregates 40mm nominal size) and curing complete.
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials and watered and ramm
directed. The proportion of cement, sand and hand broken stone aggregates shall be one part of cement, 5 parts of coarse sand
parts of hand broken stone aggregates and shall so measured by volume. The concrete shall be mixed in a mechanical mixer at
of work. Hand mixing may however be allowed for smaller quantity of work if approved by the Engineer-incharge. When hand mixing
permitted by the Engineer-in charge in case of breakdown of machinery’s and in the interest of the work. it shall be carried out o
water tight platform and care shall be taken to ensure that mixing is continued until the mass is uniform in colour and consistency. T
quantity of water shall be sufficient to produce a dense concrete of required workability for the purpose. The concrete shall
handled from the place of mixing to the final position in not more than 15 minutes by the method as directed and shall be pla
its final position, compacted and finished within 30 minutes of mixing with water i.e. before the setting commences. The concrete sh
be laid in layers of 15 cms. to 20 cms. The concrete shall be rammed with heavy iron rammers and rapidly to get the requir
compaction and to allow all the gaps to be filled with mortar. After the final set, the concrete shall be kept continuously wet
required by pounding for a period of not less than 7 days from the date of placement The concrete shall be measured for its l
breadth and depth, limiting dimensions to those specified on plan or as directed.
Mode of measurements shall be on CMT basis
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Item No:12 Labour work for fixing interlocking blocks / any kind of pavement on up to
50 mm th sand bedding, levelling, watering and fixing in line & level as well cleaning the
site etc.comp. as directed.
Work shall be carried out as per item description including cost of all labour and materials etc. complete as directe
General standard practice of laying of paver block is applicable.
The measurements shall be on SMT basis.
Item No:13 Supplying And Fixing Nimbhada Ladi 37 To 50 Mm Thick For Walk-Way,
Covering The Activity Of Excavation, Ramming, Laying On Sand Bedding As Per
Requirement To Fix The Nibhada Stone In Line & Level With Cement Pointing In
Cement Mortar 1:2 Etc Complete As Directed.
Work shall be carried out as per item description including cost of all labour and materials etc. complete as directe
General standard practice of laying of paver block is applicable.
The measurements shall be on SMT basis.
Item No:14 Pre cast concrete kerb Providing and fixing M25 Grade of concrete
precast exposed / Fair finish / texture finish kerb stones of approved make as per approved
sample of any size and any type. Kerbs shall be fixed on the foundation prepared as
per approved design. The rate shall also include for erecting and fixing the pieces
in position for complete kerb system with chamfered type of kerbs including necessary
accessories of kerb like radius kerb, angles and quadrant kerbs, droplet kerbs etc.
complete as per drawing. Kerb shall be fixed as paper joint without any jointing
material. However cement mortar shall be provided at the backside of kerb stone
joint. (Sample must be approved) Cost of excavation, cutting , base , side filling
shall includes as directed engineer - incharge in above item description as per
(a) 450 mm high median kerb.
Work shall be carried out as per item description including cost of all labour and materials etc.
The measurements shall be on RMT basis.
Item No:15 Pre cast concrete kerb Providing and fixing M25 Grade of concrete
precast exposed / Fair finish / texture finish kerb stones of approved make as per approved
sample of any size and any type. Kerbs shall be fixed on the foundation prepared as
per approved design. The rate shall also include for erecting and fixing the pieces
in position for complete kerb system with chamfered type of kerbs including necessary
accessories of kerb like radius kerbs, angles and quadrant kerbs, droplet kerbs etc.
complete as per drawing. Kerb shall be fixed as paper joint without any jointing
material. However cement mortar shall be provided at the backside of kerb stone
joint. (Sample must be approved) Cost of excavation, cutting , base , side filling
shall includes as directed engineer - incharge in above item description as per
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
BOQ (b) 375 mm high Footpath kerb.
Work shall be carried out as per item description including cost of all labour and materials etc.
The measurements shall be on RMT basis.
Item No:16 Filling in foundation and plinth with murrum or selected soil in layers of
cm. thickness including watering, ramming and onsolidating etc. Complete (S.O.R.-
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER
STANDARD P.W.D. TECHNICAL SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK
OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE,
SPECIFICATION GIVEN BY THE ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE
SAME I AGREE TO ABIDE BY THEM.
Conctractor's Signature Add. City Engineer
Address & Mobile no. ( North Zone)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
FORM OF BID AND APPENDIX TO BID
FORM 1 - BID SECURITY (BANK GUARANTEE)
(Hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with the term
and conditions of tender for the work of INTERLOCKING PAVER BLOCK PAVING AT SAIJPUR
LAKE & PARKING PLOT IN GHATAK-3 OF SAIJPUR WARD IN NORTH ZONE
1. Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to total
rupees………………..(in words............................................) Rs. (in figures) and we undertake to pay to
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad. Specified tip to his first written
demand, without demur without delay and without the necessary of a previous of judicial or administrative
procedures and without the necessity of a previous of judicial or administrative procedures and without the
necessity to prove to the Bank the defects or short comings or debits of the contractor any sum within the
2. We further agree that the Guarantee herein contemned shall remain in full force and effect during the
period that would be taken for the acceptance of tender. However unless a demand of claim under this
guarantee is made on its in writing on or before the (Date to be specified will not be less than 180 days
from the stipulated date of receiving the tender) we shall be discharge from all liabilities under the
guarantee thereafter
3. We undertake not to revoke the guarantee during it currency except with the previous
consent of the Municipal Commissioner, Ahmedabad Municipal Corporation, A' bad in
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the
Tenderer or of the Bank.
Signature & Seal of Guarantor ...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is accepted and
intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
7. List of approved banks - .As per ANNEXURE –
Seal and Signature of the Bidder Add.City Engineer (N.Z)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
FORM -2 PERFORMANCE GUARANTEE BOND
(BANK GUARANTEE)
(Clause 37 of Section I Volume 1)
Awarded a contract dated_ __________________for INTERLOCKING PAVER BLOCK PAVING
AT SAIJPUR LAKE & PARKING PLOT IN GHATAK-3 OF SAIJPUR WARD IN NORTH
ZONE.as specified in the tender by the Ahmedabad Municipal Corporation.
Whereas the said M/s __________________________________________has approached Us
___________________________________________Bank to provided a PERFORMANCE
GUARANTES BOND to the AMC for the work undertakes by M/s.
________________________ and Whereas. We, the _____________________________Bank have agreed
to provided such a PERFORMANCE GUARANTEE BOND. Now therefore, we the_
______________________Bank provided the following Performance Bank, Guarantee by way of these
Bond to the AMC.
1. The contract value of the contract provided to M/s. _____________________by the AMC in Rs. _
__________. This guarantee in the nature of PERFORMANCE GUARANTEE is provided so as to ensure
and indemnify the AMC for full and proper performance of the contract by M/s.______________________
the _______________________________Bank hereby indemnify the AMC for all losses and / or damages
to the road surface which would be laid or resurface by M/s.________________________ and such
PERFORMACE GUARANTEE would include any damage to hot mixes, dense bituminous macadam
asphalt, concrete, seal coat, concrete blocks, road markings, signage, steel structures which may be suffered
by the AMC as a result of defective production of mixes, because of poor workmanship, or at all, by way
of this bond, we the _________________________________Bank agree and promises that in the
eventuality of the contractors M/s. __________________________________________not repairing or
remeding the Problem, loss or damage to the road surface we shall indemnify and pay the AMC such
expenses, losses and damages that may be incurred by the AMC, as a result of the AMC getting the work
done itself or from the other source.
2. We _______________________________ Bank agree and understand that the decision as to whether
any losses or damages to the project have taken place or not and / or whether the work suffers from poor
workmanship or not will be taken by the Commissioner of AMC and on the Commissioner's decision
regarding such losses or damages or defect whatsoever being so notified by the AMC to us, We shall
immediately take steps and ensure that M/s.__________________________________ faithfully and
diligently carry out the necessary remedial steps to the full satisfaction of the Commissioner of the AMC.
The opinion of the Commissioner as to whether full and complete remedial steps, to the full satisfaction the
Commissioner of the AMC has been taken or not, will be that of the AMC. For the purpose, of arriving at
such decision as aforesaid it will be open to the Commissioner of the AMC in case he so desires, to
delegate this power to subordinate like the city Engineer to take appreciate decision and the decisions
referred to above will be deemed to be properly take and as if taken by the Commissioner of the AMC. In
the eventually of M/s.______________ not taking remedial action to the almost satisfaction of the
Commissioner of AMC. The AMC will be entitled to get the work done itself or from sources. On the
Commissioner of the AMC notifying to us the total expenses incurred for this purpose. We hereby
expressly have under taken to pay the AMC the said amount forth with and in any case not less than 7 days
from taken to pay the AMC the said binding the amount indicted by the Commissioner of the AMC and our
obligation to pay such amount will be continuing of the AMC and our obligation irrespective of any
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
dispute of differences that may arise between us and M/s. _____________________________ of between
3. The contract value is Rs. __________________________. This PERFORMANCE GURANTEE is
limited to 5% of the said contract value and accordingly it comes to Rs. _______________________ our
liability will be in all cases be limited to Rs._________________.
4. We agree and undertake that this PERFORMANCE GURANTEE will be valid for a period of five years
and one month from the date when the contract work is completed by the
M/s._____________________________________. The Commissioner of the AMC notify such completion
that to us. In case, no such completion it is notified, this performance guarantee will be a valid from five
years from the date of execution of this agreement. The Performance Guarantee will come into effect from
such completion date. In case however, the contract of several parts it will be opened to the Commissioner
to indicate separate completion dates for separate part and to simultaneously indicate a break up of the
contract value equivalent to the separate part. In which case the PERFORMANCE GUARNATEE to extent
of the different completion dates. It is expressly understood that the considering this period of five years
and one month, the date by which the Corporation, intimate the Bank about the losses, damages or
problems as the case may be, shall be considered as long as such intimation is within a period of five years
and one month from the completion date. We the ___________________ Bank will be liable, irrespective
of whether the remedial actions or lack thereof has taken place after the period of the five years and one
5. We _________________________________ Bank agree that the PERFORMANCE GUARANTEE
which is continuing guarantee will be binding, and enforceable against us irrespective of any difference /
disputes between the AMC and M/s. __________________________of between us and
and irrespective of any change or variation or execution time or any forbearance or waiver made or grant
6. In case any disputes arise as to the interpretation or implementation or implementation of this
PERFORMANCE GUARANTEE, the matter shall be referred to the sole arbitration of he Commissioner
of AMC whose decision in the matter will be final. In case any resource to any court of law is necessitated,
the appropriate Civil Court in the Ahmedabad along will have Jurisdiction.
Date: Signature of Contractor
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
FORM 3 - FORM OF AGREEMENT
THIS AGREEMENT made the ____ day of _______, 20__ between Ahmedabad Municipal Corporation
………………..(here in after called “the Employer”) of the one part and
(here in after called “the Contractor”) of the other part.
WHEREAS the Employer is desirous that certain works should be executed by the Contractor, viz.
____________________________________________ and has accepted the bid by the contractor for the
execution and completion of such works and the remedying of any defects therein at a contract price of
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement, words and expressions shall have the same meanings as are respectively assigned to
them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be deemed to form and be read and construed as part of
this Agreement, viz.:
a) the Letter of Acceptance;
b) the General Conditions
c) The Financial Condition
d) the Technical Specifications;
e) the Priced Bill of Quantities; and
f) other documents forming part of the contract.
3. In consideration of the payments to be made by the Employer to the Contractor as here in after
mentioned, the Contractor hereby covenants with the Employer to execute and complete the Works and
remedy any defects therein in conformity in all respects with the provisions of the Contract.
4. The Employer hereby covenants to pay the Contractor in consideration of the execution and completion
of the Works and the remedying of defects therein the Contract Price or such other sum as may become
payable under the provisions of the Contract at the times and in the manner prescribed by the Contract. IN
WITNESS whereof the parties hereto have caused this Agreement to be executed the day and year first
before written.
Signed, sealed, and delivered by the said Employer and the Contractor in the presence
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
On behalf of Ahmedabad Municipal
On behalf of M/s.
Binding Signature of the Employer:
Binding Signature of the Contractor:
Sample Form for updating - qualification information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender 142 Parking Plot Vol-1.pdf
Tender 142 Parking Plot Vol-2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].