| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC CHANDPURA TIKAMGARH DIST TIKAMGARH MP | TIKAMGARH | TIKAMGARH | MADHYA PRADESH | ₹2.9 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹3.2 CrRejected-AOC | ₹3.2 Cr | L2 | Rejected-AOC Not a lowest bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically disqualified |
Tender Value
₹4.0 Cr
EMD Value
₹4.0 L
Closing Date
21 Feb 2026, 5:00 pmClosed
Managing Director
The Managing Director, WATCO Ground Floor, Unnati Bhawan, Satyanagar, Bhubaneswar-751007, Odisha, India (0674) 2571444
Annual Operation and Maintenance of 129 MLD WTP at Sector-12, CDA and Intake Well, Chahata, Cuttack under WATCO Division, Cuttack (For Two Years)
2026_WATCO_125209_1
WATCO (W)-27(06)/2025-26 Dtd.28.01.2026
National Competitive Bid
Civil Works - Water Works
730 days
Sector-12, CDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
₹4.0 L
Yes
5 Jun 2026
7 Feb 2026
24 Feb 2026
7 Feb 2026
21 Feb 2026
7 Feb 2026
7 Feb 2026 - 12 Feb 2026
Supplying Labour for Running of head works.
Supplying labour and T&P for running of 129MLD water Treatment Plant for 22 to 24 hours with chemical dosing, running of Chemical dozing pumps, flash Mixture, Clarifocculator, Back washing of Filter Bed, Operation of all valves including desludging etc of units of WTP all complete as per direction of Engineer-in-charge at 129MLD WTP, CDA Cuttack.
Supplying labour, T&P for running Clear water cenrifugal Pump sets of capacity 375HP (2W+1S) and 425HP (2W+1S) at clear water pump house and running of V.T Pump set of capacity 270 KW(2W + 1S) and DG set 700KV at raw water pump house for 22 to 24 hours, including maintenance electrical system, providing bulb, fusewire, flexiblewire and minor electrical defects at different units of WTP, Electrical Sub-Station, Transfermer, LT and HT lines etc all complete as per direction of Engineer-in-charge. at 129MLD WTP, CDA Cuttack.
Supplying labour, T&P for running of Gas chlorination system in pre-chlorination and post chlorination system, each provided with 900Kg tonner and 2nos 1.00HP chlorine pump, water pump etc for 22 to 24 hours etc all complete as per direction of Engineer-in-charge at 129MLD WTP, CDA Cuttack.
Supplying labours and T&P for Operation of Automation System including operation of Back wash system control panel, measurement of incoming flow, water level at clear water reservoir, monitoring of water quality through online sensor, PLC Panel and SCADA software etc all complete as per direction of Engineer-in-charge at 129MLD WTP CDA and Intake Well(Chahata) Cuttack.
Minor maintenance work and Watch & ward of WTP Premises.
Supplying all labour T&P for sweeping office building, pump house, Filter house, Chemical House, Other Annex building including cost of broomsticks and jhudis etc all complete as per the direction of Engineer-in-charge at 129MLD WTP, CDA Cuttack.
Supplying materials, labour, T&P for removal of debris, trees and lawns etc all complete as per the direction of Engineer-in-charge at 129MLD WTP, CDA Cuttack.
Supplying labour and T&P for watch and ward of all units of WTP, clear water pump houses Reservoir, Electrical Sub-Station etc all complete as per the direction of Engineer-in-charge at 129MLD WTP, CDA and Intake Well(Chahata), Cuttack.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
DTCN.pdf
Tender Documents • 1.11 MB
BOQ_578293.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid