| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC NEAR KATI CHAURAHA HUZURPUR ROAD BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | ₹1.4 Cr | L1 | Accepted-AOC LOWEST |
| 2 | L2₹1.4 Cr+₹49,259.99 (0.35%)Rejected-Finance D 249 GREEN ESTATE A2Z BUILDER DEVELOPERS NH 58 ROORKEE ROAD MODIPURAM MEERUT UP 250110 | MEERUT | MEERUT | UP | 250110 | ₹1.4 Cr+₹49,259.99 (0.35%) | L2 | Rejected-Finance HIGH RATE BIDDER |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
13 Jan 2020, 1:00 pmClosed
SE 9TH CIRCLE I W BAHRAICH
OFFICE OF THE SE 9TH CIRCLE I W BAHRAICH
CONSTRUCTION OF GHAT AND FUNERAL SHED BESIDE THE RIGHT BANK OF OLD SARYU RIVER AT BIRTHANA GHAT (KURSANDA) DISTRICT-BAHRAICH U.P.
2020_UPIDC_420747_1
06/SE/NAVAM/2019-20
Open Tender
Civil Works
Item Rate
90 days
KURSANDA BAHRAICH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
EE SARYU DRAINAGE KHAN 1
₹2.8 L
17 Mar 2021
7 Jan 2020
13 Jan 2020
7 Jan 2020
13 Jan 2020
7 Jan 2020
Amount
Earth work in excavation of foundation for toe walls and sleepers of ghats including ramming, dressing all leads and lifts for disposal of excavated earth.
P/L C.C. 1:4:8 in foundation of toe wall & sleeper with cement, coarse sand and stone ballast (4.75 to 40 mm size) including cost of all material labour and T&P required for proper completion of work.
P/L R.C.C. in 1:2:4 in toe walls, sleepers and side walls etc. including cost of all materia, labour and T&P required for proper completion of work.
P/L R.C.C. 1:1.5:3 in step with grit 10-20 mm size coarse sand in construction of ghat including cost of all material, labour and T&P etc. required for proper compleiton of work.
S/L C.C. 1:2:4 under step of Ghat including cost of all material, labor and T&P required for proper completion of work.
S/L of shinghle 150mm thick as filter 12 to 20mm under Ghat including cost of all material, labor and T&P required for proper completion of work.
S/L of coarse sand 150mm thick as filter under Ghat including cost of all material, labor and T&P required for proper completion of work.
S/L local sand in filter under ghat including cost of all material, labor and T&P required for proper completion of work under the Ghat.
S/L fine dressed stone patia in 1:3 cement and coarse sand mortar on ghat platform, steps andside walls etc. including cost of all material, labour and T&P required for completion of work.
S/F nominal steel in conc. slab for ghat including cost of all material, labour and T&P etc. required for completion of work.
Hiring of 2 Pumps for 15 hours for 10 days of 5 HP deisel pump including operetor and P.O.L.
Supplying of Mirzapur Stone Boulder 20 to 40 Kg. including Royalty, Trade Tax, Carriage from quarry to Stack yard
Supplying /Laying of stone grit 10-20mm under pitching work as a filter material.
E/W in coffer dam with new E.C. Bag filled with Earth putting in Nylon Crates size (1.0x1.0x1.0) in i/c all lead & lift with proper completion of work.
Centering and Shuttering for R.C.C. work including cost of all materia, labour and T&P required for proper completion of work.
Earth work in excavation of foundation for toe walls and sleepers of ghats including ramming, dressing all leads and lifts for disposal of excavated earth.
P/L C.C. 1:3:6 in foundation with cement, coarse sand and stone ballast (4.75 to 40 mm size) including cost of all material labour and T&P required for proper completion of work.
Brick Work in 1:6 Cement, course sand mortar in foundation including cost of all material labour & T&P. required for completion of work.
P/L C.C. 1:1.5:3 with grit 10-20 mm size coarse sand in construction of Funeral Shed column & steps including cost of all material, labour and T&P etc. required for proper compleiton of work.
P/L C.C. 1:2:4 with grit 10-20 mm size coarse sand in construction of Funeral Shed Slab,Beam & Bench including cost of all material, labour and T&P etc. required for proper compleiton of work.
S/L fine dressed stone patia in 1:3 cement and coarse sand mortar on Funeral Shed floor, steps and pillar etc. including cost of all material, labour and T&P required for completion of work.
S/F nominal steel in conc. slab for Funeral Shed including cost of all material Cutting, bending, binding and placing of reinforcement including cost of binding wire but excluding cost of steel.
Distempering with dry distemper of approved brand (two coats) over one priming coat of whiting on new surface after thoroughly brushinh the surface free from dropping and other foreign matter including preparing the surface even and sand papered smooth including cost of all materils, labour & T&P.
Centering/Shuttering work for C.C. and R.C.C. Work.including cost of all material, labour and T&P required for completion of work.
Local Sand filling upto plinth level in the Funreral shed compaction, with dressing and manual compaction completion of work. required for completion of work.
Earth work by power Tranport for a lead of upto 1 Km. including excavation loading, unloading & Royalty manual compaction and dressing including all lift rates shall be applicable for lead beyond 630m and upto 1Km.
Providing and laying of interlocking concrete block on pavement having thickness 80mm as per drawing including cost of all material, labour and T&P required for completion of work.
Brick edging on the side of interlocking road including cost of all material, labour and T&P required for completion of work.
M/s Tridev Construction Company
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .