| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹397.3 CrAccepted-AOC | L1 | Accepted-AOC Award of Work being L-1 bidder | |
| 2 | L2₹405.2 Cr+₹68.5 Cr (20.3%)Rejected-Finance 3RD FLOOR DONGFANG ELECTRIC BUILDING PREMISES 16 MAR 1111 ACTION AREA 1A NEWTOWN RAJARHAT NORTH 24 PARGANAS WEST BENGAL 700156 | 24 PARAGANAS NORTH | WEST BENGAL | 700156 | L2 | Rejected-Finance Rejected not being L1 Bidder. |
Tender Value
₹455.3 Cr
Closing Date
6 Sept 2021, 5:00 pmClosed
GM(CMC) SECL Bilaspur
Office of GM(CMC), SECL HQ SEEPAT ROAD, BILASPUR
Introduction of Highwall Miner with associated equipment for cutting, loading and transportation of coal and other services on hiring basis as detailed in e-Tender notice/NIT at Sharda OC Mine of Sohagpur Area of SECL .
2021_SECL_209449_1
SECL/BSP/CMC/e-Tender/458 Date 18.06.2021
Open Tender
Miscellaneous Services
Percentage
1095 days
Sharda OC Mine, Sohagpur Area, Dist- Shahdol MP
As per e-Tender Notice
9 documents required · 9 mandatory
Exempted
SECL HQ SEEPAT ROAD, BILASPUR
27 Oct 2021
23 Jun 2021
8 Sept 2021
23 Jun 2021
6 Sept 2021
1 Aug 2021
23 Jun 2021 - 23 Aug 2021
23 Jul 2021
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Work discription | |||||
| 1.01 | Introduction of Highwall Miner with associated equipment for cutting in Sharda OC Mine of Sohagpur Area of SECL on hiring basis inclusive of :
• Scientific Site Investigation study, design and planning of Highwall mining by a reputed organization/Institute. Submit report including the method of Highwall mining to obtain approval from Directorate General of Mines Safety (DGMS).
• Supply of Highwall Equipment, spares, consumables etc.
• Deploy and operate compatible HEMM/ Equipment for preparation of bench/trench to position the High Wall machine, including OB extraction, loading & dumping at given sites.
• Operation and Maintenance of all the equipment supplied and to produce coal @ 8.5 lakh tonne per annum (including change over period)
• Minimum Guaranteed Production per Annum: 1st to 3rd Production Year – @ 0.85 MT Total Quantity – 2.55 MT For a period of three production year | 25,50,000 | Te | 1,456.81 | ₹3,71,48,65,500 |
| 1.02 | Hiring of pay loader for mechanical transfer of 2.55 MTe. of coal into tippers for a period of for period of 03 (three ) Production Year | 25,50,000 | Te | 10.51 | ₹2,68,00,500 |
| 1.03 | Hiring of tippers for transportation of 1.55 MT coal to the stockyard within the mine premises after weighment of coal at SECL’s weighbridge in Sharda OC Mine. Lead slab :3-4 KM,for period of 03 (three ) Production Year | 15,50,000 | Te | 41.35 | ₹6,40,92,500 |
| 1.04 | Hiring of tippers for transportation of 1.00 MT coal to the stockyard within the mine premises after weighment of coal at SECL’s weighbridge in Sharda OC Mine. Lead slab : 4-5 KM,for period of 03 (three ) Production Year | 10,00,000 | Te | 52.91 | ₹5,29,10,000 |
| 2 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
tech_bid_open
tech_eval
fin_bid_open
boq_comp_chart
xlsx
fin_eval
aoc
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_215751.xls
BOQ Document • 0.25 MB
79139174.pdf
Tender Document • 0.28 MB
79139178.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .