Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.1 LAccepted-Finance ANGONA P O KRISHNAGAR DIST NADIA 741101 | KRISHNAGAR | NADIA | WEST BENGAL | 741101 | L1 | Accepted-Finance Lowest Bidder | |
| 2 | L2₹27.1 L+₹813.04 (0.03%)Rejected-Finance PIRTALA BISWAS LANE KRISHNAGAR NADIA 741101 | NADIA | WEST BENGAL | 741101 | L2 | Rejected-Finance 2nd Lowest Bidder | |
| 3 | L3₹27.4 L+₹33,334.65 (1.23%)Rejected-Finance CHANDANPUR DAKSHINPARA NADIA WEST BENGAL 741151 | NADIA | NADIA | WEST BENGAL | 741151 | L3 | Rejected-Finance 3rd Lowest Bidder |
Tender Value
₹27.1 L
EMD Value
₹54,200
Closing Date
25 Nov 2025, 9:30 amClosed
BDO HANSKHALI
HANSKHALI
Construction of Bituminous anc Plastic composite Pavement fror Rupdaha Deep TubeWell t Biswanathpu under Ramnagar BarachupriaIl GP within HanskhaL Development B1ock
2025_ZPHD_938640_1
93/RURAL ROAD/I
Open Tender
CIVIL WORKS
Percentage
45 days
HANSKHALI
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹54,200
Yes
17 Mar 2026
4 Nov 2025
27 Nov 2025
4 Nov 2025
25 Nov 2025
4 Nov 2025
Loosening, Leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Clause 305.3.4 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
Construction of Sub - Base using Local Materials spreading in uniform layers with motor grader on prepered surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete .(I) For Construction of Sub - Base by compacting 1-st Class Brick aggregates (40 mm down ) and Sand ( In Proportation 60:40)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(i) For Construction of Sub - Base by consolidating Jhama Metal ( 63 mm to 45 mm ) with Sand screening:-
Providing , Laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8 -10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregates watering including lighting , guarding, barricading and macking necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling , including cost of all materials and hire and labour charges of all men and machinary and compacting to the required density, as per Clause - 4 of Specification for Road & Bridge Works of MoRT&H( 5- th Revision ) Grade - II aggregates, (53 mm-22.4 mm), Using Stone Screening Type B (11.2 mm)
Providing and applying bituminous primer coat with Catonic Bitumen Emulsion of approved grade conferming to IS :8887-1978 and requisite quantity an prepard surface of ganular base including cleaning of road sureface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specification for Road & Bridge works of MoRT&H (5-th Revision),(i) For WBM Surface : (with primer @ 0.7-1.0 kg /M2 )
Providing and applying tack coat with Catonic Bitumen Emulsion of approved grade conforming to IS: 8887 - 1978 on the prepard surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion , hire charges of machinery and labour, cost of fuel and lubricants all complete .
Proving, Laying and rolling of open -graded premix surfacing of 20 mm thickness composed of 13.2 mm (( @ 0.018 m3 per m2) and 11.2 mm ( @ 0.009 m3 per m2 ) size stone aggregats, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and including the hire charges of Mobile Hot Mix Plant ( Light Duty ) and other machinery, pay of operators, cost of fuel and lubricants etc. complete to be followed by seal coat of either Type - A or Type - B as per Tecnical Specification Clause 508 for Rural Roads of MORD
Providing and laying Premixed Seal Coat ( Type - B ) with approved quality sand / grit @ 0.60 m3 / 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand / grit ( 100 % passing through 2.36 mm sieve and retained on 180 micron sieve ) uniformly with bitumen binder, laying and spreading the mix at an uniform rate including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H ( 5-th Revesion )I ) By Mechanical Meansii) With Hot Bitumen Binder ( @ 6.80 kg / 10 Sq.m.)
Earth work in excavation from borrow pits ( Land owned / aggarged by the Department ) and depositing in layers of 250 mm. ------------ upto 1.5 m making bundh at top as directed dressing complete. ( Borrowpit measurment ) Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m
Add GST 18 %
Add LWC 1%
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.45 MB
Tendernotice_2.pdf
PDF • 11.77 MB
BOQ_2215851.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .