Tender Value
₹75.9 L
EMD Value
₹75,899
Closing Date
30 Jun 2026, 6:00 pm3d left
Similar tender results from the same govt authority in the past 3 years.
Chief Engineer (Material) PGVCL Rajkot
Construction of Transformer Plinth with Overhead Gantry Crane, CC road, Paver block & Demolition of Old Quarters and Transformer Plinth at Una PH Campus under Amreli Circle.
312341
PGVCL/Civil/2026/14
Open
Civil Works - Others
Rajkot
19 documents required · 18 mandatory · 1 optional
₹5,900
Paschim Gujarat Vij Company Limited
₹75,899
8 Jun 2026
8 Jun 2026
8 Jun 2026
30 Jun 2026
8 Jun 2026
Name of Work:- Construction of Transformer Plinth with Overhead Gantry Crane, CC
road, Paver block & Demolition of Old Quarters and Transformer Plinth at Una PH
Campus under Amreli Circle.
PARTICULARS OF ITEM QTY RATE PER AMOUNT
Excavation for foundation up to 1.5 M. depth. Incl. sorting
out and stacking of useful materials and disposing of the
excavated stuff up to 50 meter. Lead in-
1 (A) -Loose soil 101.00 121.72 Cmt
2 (B) -Dense or Hard Soil 52.00 155.60 Cmt
3 (C) -Hard murrum 70.00 266.26 Cmt
4 Excavation for foundation for depth from 1.5 Mt to 3 Mt.
depth including sorting out and stacking of useful materials
and disposing of the excavated stuff upto 50Mt. Lead in- (D) -
Hard murrum 33.00 284.37 Cmt
5 Filling available excavated earth (excluding rock) trenches,
plinth side of foundation etc. in layer not exceeding in 20 cm.
in depth consolidating each deposited layer by ramming &
watering. 368.00 135.56 Cmt
6 Filling in foundation and plinth with murrum or selected soil
brought from out side with any lead in layers of 20 cm.
Thickness including watering, pnumatic ramming and
consolidating etc. comp 616.00 298.79 Cmt
7 Providing and laying cement concrete 1:3:6(1 CEMENT: 3-
Coarse sand: 6 - Hand broken stone aggregate 40MM
nominal Size) and curing complete excluding the cost of
formwork in.- Foundations and plinth. 165.00 3064.60 Cmt
8 Providing and laying cement concrete M-150 (1cement :
2coarse sand : 4 graded stone aggregate 20 mm. Nominal
size) and curing complete including cost of form work in
Grade Slab. 26.00 5080.00 Cmt
Providing and laying controlled cement concrete M 200 and
curing complete including the cost of form work and
excluding reinforcement for reinforced Concrete work in
9 (A) - In foundation footings, Base of Columns and mass
concrete 159.00 5170.00 Cmt
10 (B)- In Beam, Lintel, chhajahs, Shelvas etc. upto floor two
level.-GF+FF 27.00 6836.00 Cmt
11 (C)- In Columns, Pillars Posts and Struts up to floor two
level.-GF+FF 32.00 8766.00 Cmt
PARTICULARS OF ITEM QTY RATE PER AMOUNT
12 Constructing 12.5 cm thick Controlled cement concrete M-
200 Grade with Trimix Vacumm dewatering system with
power trowling sheet form work with M.S. channels, srinking
of fair hardness, Non oxidzing, Non metalic, heavy duty floor
hardner of FOSROC or equivalent at the rate of
Kg./Sq.M. with 10 mm x 10 mm size groove cutting in
concrete as constructution joint with necessary equipments,
labors as per design etc. Complete. 285.00 678.00 Smt.
13 Providing TMT Bars FE 500D reinforcement for R.C.C.
work including bending, binding and placing in position
complete up to floor two level 19805.0 76.52 Kg
14 Re-using available bella stone in White stone bela masonry
in cement mortar 1:6 (1cement : 6 course sand) including
cleaning the stone surface complete and packing the joints
etc. as directed by EIC. 77.0 4236.01 Cmt
15 White Stone Bela mesonry block in course in superstructure
with stone of approved quality in Cement Mortar 1:6 (1-
Cement : 6- course sand) including packing the joints etc.
complete. 5.00 6276.66 Cmt
16 20 mm. Thick sand faced cement plaster on walls up to height
10 meters above ground level consisting of 12 mm. Thick
backing coat of C.M. 1:3 (1 cement : 3 sand) and 8 mm.
Thick finishing coat of C.M.. 1:1 (1 cement : 1 sand) etc.
complete. 681.00 339.02 Smt.
17 Applying One coat of exterior primer of approved brand and
manufacture on new wall surface to give an even shade
including thoroughly brushing the surface free from mortar
dropping and other foreign matter and sand papered smooth. 681.00 28.00 Smt.
18 Finishing Wall with Weather Proof Exterior Emulsion Paint
on Wall Surface (Two Coats) to give an required shape even
shade after thoroguhly brushing the surface to remove all dirt,
and remains of loose powdered materials etc. complete 681.00 119.07 Smt.
19 Providing and fixing precast rubber dye inter locking
concrete block 60mm thick with grade of concrete M-200
pnumatic comressed by mechanically pressed and as per
approved design including 75mm sand layer for levelling and
filling the joint with sand in proper line and level etc comp as
per directed. 671.00 603.00 Smt.
20 Providing and fixing rolling shutters of approved make made
of 80 mm wide M.S. laths inter-locked together through their
entire length and jointed together at the ends by end locks
mounted on specially designed pipe shaft with bracket plates,
guide channels and arragements for inside and outside
locking with push-pull operation including the cost of hood
cover and spring etc. complete.(A) Shutters having width
PARTICULARS OF ITEM QTY RATE PER AMOUNT
21 Providing & Fixing Fencing using 30x30 MS Pipe 1.50m x
1.50m Covered with 8 Gauge Wire Square Jali as directed by
22 Fabrication using PGVCL material (angles, channel, girder)
including transportation of material from store, fixing of
bolts, welding and misc. work inclusive of all labour, one
coat of primer and two coat of oil paint etc. complete. All
miscelleneous items like bolt, nut, welding rod etc will be
Provide by contractor.. 13060.00 19.75 kg
23 Providing & Fixing J- Bolt of Size - 20mm Dia., 14 inch
Length in RCC Column with Proper Line and Level As
directed by EIC. 128.00 288.00 Nos
24 Fabricating & assembling, of Wire Rope Hoist, 3 Ton
Single Girder Gantry Crane with Twin Drive arrangement &
Electric Wire Rope Hoist as per IS: 3177 & IS:
Including Third (LD) drive electrical arrangement only
Harden gear with standard ratio, to full fill standard speed,
providing non-metallic cone to prevent rain water. Capacity
3 Ton, Span 15 mtrs. Height 6 mtrs, Class II & Medium
Hoisting Speed 3.5 mpm, C. T. Speed 12 - 15 mpm, L. T.
Speed 18 - 20 mpm No. of Falls - 2 falls, Wire Rope Dia Ø
12 mm, Control Voltage 110 V Supply Voltage 415 V, 3 Ph
AC supply, Operation Floor operated pendant push button
Station With brack system including all kind of materials &
labour, transport, coloring, etc completed. 1.00 172040.00 Job
25 Providing & fixing of 3 phase electrical motor 2hp, Station
make including all kind of materials & labour etc completed 2.00 11615.00 Nos
26 Preparation of Crain Cross travel rotating assembly including
En 19 shaft, En 8 Roller with groove, standard bearing, lock
pin gear box & all kind of materials & labour, transport,
coloring, etc completed. 4.00 12436.00 Set
27 Providing, fixing and fabrication of Base plate for supporting
girder column of Size: 700x 550mmx16mm Tk over RCC
foundation including 4 nos of 20mm dia hole, with all kind of
materials & labour, transport, coloring, etc completed as per
28 Providing, fixing and fabrication of TOP plate of Size: 500x
300mmx12mm Tk for supporting girder column over RCC
foundation including welding with coloum and all kind of
materials & labour, transport, coloring, etc completed as per
29 Providing, fixing and fabrication of straining welding of Size:
Square Bar 32 mm at 6 m height for guide support for
travelling of Bridge Beam, including of materials & labour,
transport, coloring, etc completed as per EIC 139.00 1134.00 Rmt
PARTICULARS OF ITEM QTY RATE PER AMOUNT
30 Providing & Laying of Wire rope for supporting of Electrical
cable, including Fixing with coloring, labour, transport etc
completed as per EIC 81.00 261.00 Rmt
31 Providing & Laying of Electrical cable, 4 core with non-
metallic clamp make standard 2.5mm Tk, including Fixing
with coloring, labour, transport etc completed as per EIC 130.00 145.00 Rmt
32 Providing, fixing and fabrication of ISMB 450 X 150 Station
at 6 Meter height for Main Bridge Beam including all kind of
material, labour, transport, coloring, etc completed. 12.00 10490.00 Rmt
33 Providing & fixing, Laying frame for rotating assembly of
ISMC 200 X 75 at 5 Meter height for End Truck to support
Bridge Beam & Rotating including all kind of material,
labour, transport, coloring, etc 12.00 3619.00 Rmt
34 Labor charges for Fabrication of Ms girders Colum (I Beam)
Welding with Ms angle, Top & Bottom plate & braising
including cutting bending as director by EIC, Including Oil
painting. All required main structural (Girders, Channels
Angle , Flar & Round Bars) material will be provide by
PGVCL other then mention. All mescaline's items like bolt,
nut, welding rod etc will be Provide by contractor. 32.00 2220.00 Nos
35 Labor charges for erection by Crain of Ms girders Colum
over RCC Foundation Column including Nut Bolting with
Base Plate rigidly with good engineering practice 32.00 3565.00 Nos
36 Labor charges for Fabrication of Ms Runway beam. Welding
with top plate of MS Girders (I Beam) in full length of yard
including cutting welding with Ms girders pole as director by
EIC, Including Oil painting. All required main structural
(Girders, Channels , Angle , Flat & Round Bars) material
will be provide by PGVCL. All mescaline's items like bolt,
nut, welding rod etc will be Provide by contractor. 139.00 172.00 Rmt
37 Labor charges for erection by Crain of RunWay Beam on Ms
girder Column including Nut Bolting/ Welding with top
Plate rigidly with good engineering practice All mescaline's
items like bolt, nut, welding rod etc will be Provide by
contractor. 139.00 197.00 Rmt
38 Labor charges for Fabrication of Ms Base for Bridge drive
motor (2HP) each side Welding with MS Girders (I Beam)
cutting welding with Ms girders pole as director by EIC,
Including Oil painting. All required main structural (Girders,
Channels , Angle , Flat & Round Bars) material will be
provide by PGVCL . All mescaline's items like bolt, nut,
welding rod etc will be Provide by contractor. 2.00 1597.00 Nos
PARTICULARS OF ITEM QTY RATE PER AMOUNT
39 Labor charges for Fabrication of Support structure for Bridge
to Fabrication in way to reduce Vibration of Bridge Beam.
MS Main bridge beam with cutting Welding as director by
EIC, Including Oil painting. All required main structural
(Girders, Channels , Angle , Flat & Round Bars) material
will be provide by PGVCL . All mescaline's items like bolt,
nut, welding rod etc will be Provide by contractor. 1.00 4598.00 Set
40 Removing and scraping of old deteriorated plaster of any
thickness fromm wall / R.C.C member including stacking of
serviceable material and disposal of unserviceable from site
of work with all lead and lift 544.00 19.69 Smt.
41 Demolition of Brick work and stone masonry including
stacking of serviceable materilas and disposal of
unserviceable materials with all lead and lift.(ii) In Cement
42 Demolition including stacking of serviceable materilas and
disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 70.00 1071.63 Cmt
43 Dismentaling of sheet roofing including ridges, Hips,
Valleys, Gutters etc. stacking of serviceable materials and
disposal of unserviceable materials with all lead and lift.(ii)
A.C. sheet roofing. 47.00 54.09 Smt.
44 Dismentling steel work including distempering and stacking
the materials with all lead and lift. 384.00 3.81 Kg
45 Dismentling doors, windows, ventilators etc. (wood or steel)
shutters including chowkhats architraves, holdfasts and other
attachment etc. complete and stacking them within all lead
and lift.(i) Not exceeding 3 Sq.M. in area.
Total Estimated Cost Civil Work in Rs …
46 Amount from Sale of IMLO by Dismentalling existing old
Quarters and Plinth and carrying away all material received
from dismentalling. Party has to lift all dismentall serviable
and un serviceable material from site and making site clear in
all respect. All lead and lift is in scope of party. Rates
includes all risk of accident. No any property/live stock
/human being of private as well as of PGVCL shoud be
damged during execution of work. All responsibility shoul be
of contractor. For sale of this old property material, party has
to mentioned rate which will be deducted from bill of party.
Rate quoted for whole tender will be effected to this item
also, in reverse trend. (Note: Imlo quantity is considered
according to itemwise measurement Dismantling Item
Quantity, after execution of work, the actual quantity will be
measured; the effect of the same will be given in this item
and final payment will be made as per actual quantity.) 1.00 265150.00 Job
PARTICULARS OF ITEM QTY RATE PER AMOUNT
TOTAL AMOUNT TO BE CREDITED TO PGVCL in Rs …
TOTAL AMOUNT TO BE CREDITED TO PGVCL in Rs …
Estimated cost of work for Civil Work
Bidder's Offer (B)
Bidder's Quoated Amt. (C ) i.e. [C= (A) +/- (A)*(B)]
GST @ [CGST @ __% + SGST @ __%] (D = C*__%)
Bidder's Total Quoated Amt. with GST (E) (E = C+D)
Rebate charges to be paid to PGVCL Sale of IMLO by Dismentalling Old Quarters
Bidder's Offer (G)
Bidder's Quoated Amt. [ H = (F) +/- (F)*(G)]
GST @ [CGST @ __% + SGST @ __%] (I) (I=H*__%)
Bidder's Quoated Amt. with GST (J) (J = H + I)
Bidder's Total Quoated Amt. with GST & TCS for Demolition work (L = J + K)
Bidder's Net Quoated Amt. (M) i.e. (M = E - L)
(Note : Prices will be evaluated i.e. L-1, on Bidder's Net Quoated Lowest Amt. i.e. on "M" Amt.).
Chief Engineer(Material)
PGVCL, Corporate Office
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document.pdf
Schedule B Una store work.pdf
Download all tender documents and submit your bid