Loading…
Loading…
Tender Value
₹18901.7 Cr
EMD Value
₹378.0 Cr
Closing Date
18 Jan 2027, 11:00 am
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
Yes
27/10/2026 11:00
Lowest to Highest
180 days
Expenditure
Capital (Works)
SHSR UNIT
Construction of Sarkhej-Dholera Semi High-Speed Double Railway Line, including Spur lines to Lothal NMHC and Dholera Airport Terminal; comprising civil works, which includes Formation & Viaduct, Bridges, Station buildings, & associated works; Track System (Ballasted & BLT), Overhead Traction System including Electrical General Services; Signalling & Telecommunication System, Operating Control Centre, integration of all systems Complete in all respect including Testing & Commissioning and all appurtenant works under jurisdiction of Western Railway
CPMSHSRADIWRSEJDSIREPC01
CPMSHSRADIWRSEJDSIREPC01
Open
Works - General
42 Months
Ahmedabad, Gujarat
₹0
₹378.0 Cr
18 Jan 2027
31 Jul 2026
4 Jan 2027
27 Oct 2026
25 items across 4 schedules · ₹55,82,00,47,384.24 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Corrosion Inhibiting admixture @ 2.5kg/cum | Kg | 3579059.00 | 180 | 64,42,30,620 |
| Schedule total | ₹64,42,30,620 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ERTelecom.pdf
ATTACHMENT
STFRSDated19.05.2026_1.pdf
ATTACHMENT
SandTtentativeMidsectionSIPofSEJ-Dholerasection.pdf
ATTACHMENT
SandTEMPLOYERREQUIREMENTSignaling.pdf
ATTACHMENT
SandTTentativestationSIPofSEJDholera.pdf
ATTACHMENT
TECHNICALSPECIFICATIONFORPASSENGER-ESCALATORS.pdf
ATTACHMENT
02Advancecorrectionslip20ACTMACS20.pdf
ATTACHMENT
03FirepreventionmeasuresanddetectionsystemsinElectricalPanelsandPanelrooms.pdf
ATTACHMENT
04LEDSpec.pdf
ATTACHMENT
SandTTelecomcircular.pdf
ATTACHMENT
SandTTelecomGuidelines.pdf
ATTACHMENT
05RDSOTechnicalspecificationforpassengerelevators.pdf
ATTACHMENT
06ScaleofElectricalfittings.pdf
ATTACHMENT
07FRSforOVERHEADTRACTIONSYSTEMFORSPEEDUPTO220KMPHwithcoveringletter050326.pdf
ATTACHMENT
Linkforaccessingthekmzfile.pdf
ATTACHMENT
LSECTIONKM00TOKM15.pdf
ATTACHMENT
LSECTIONKM15TOKM35.pdf
ATTACHMENT
LSECTIONSHEETKM35TOKM65.pdf
ATTACHMENT
LSECTIONSHEETKM65TOKM80.pdf
ATTACHMENT
LSECTIONSHEETKM80TOKM95.pdf
ATTACHMENT
LSECTIONSHEETKM95TOKM110.pdf
ATTACHMENT
L-SECTIONSHEETKM00TO15DHOLERAAIRPORTSPUR-PLAN.pdf
ATTACHMENT
L-SECTIONSHEETKM00TOKM10LOTHALSPUR-PLAN.pdf
ATTACHMENT
Type2G1Quarters_compressed1.pdf
ATTACHMENT
TYPEIIIQUARTER.pdf
ATTACHMENT
TYPE-IVQuarter.pdf
ATTACHMENT
SarkhejDholeraEPCAgreement.pdf
ATTACHMENT
F-RFP-Sarkhej-Dholera-31.07.26.pdf
ATTACHMENT
CorrigendumtotendernoticeandRFP.pdf
ATTACHMENT
GTReport_168BHsViaduct1_1.pdf
ATTACHMENT
GTReport_168BHsViaduct2_1.pdf
ATTACHMENT
GTReport_168BHsViaduct3_1.pdf
ATTACHMENT
GTReport_168BHsViaduct4_1.pdf
ATTACHMENT
GTReport_168BHsViaduct5_1.pdf
ATTACHMENT
GTReport_168BHsViaduct6_1.pdf
ATTACHMENT
GTReport_168BHsViaduct7_1.pdf
ATTACHMENT
05GTReportMJB_37BHs01_1.pdf
ATTACHMENT
05GTReportMJB_37BHs02_1.pdf
ATTACHMENT
GTReport_MNB_111BHs-01.pdf
ATTACHMENT
GTReport_MNB_111BHs-02_1.pdf
ATTACHMENT
GTReport_MNB_111BHs-03_1.pdf
ATTACHMENT
01GeotechnicalInvestigationReport_Sarkhej-Dholera_AirportSpurnLine_4BH.pdf
ATTACHMENT
02GeotechnicalInvestigationReport_Sarkhej-Dholera_AirportSpurnLine_19BH_compressed.pdf
ATTACHMENT
04GTReportRUB30BHs.pdf
ATTACHMENT
06GTReportStations28BHs01_1.pdf
ATTACHMENT
06GTReportStations28BHs02_1.pdf
ATTACHMENT
ESPofSEJandCONCEPTPLAN_1.pdf
ATTACHMENT
GADSSPDRG.pdf
ATTACHMENT
GAD-serviceroad_1.pdf
ATTACHMENT
StationBuildingDrawing_1.pdf
ATTACHMENT
01BRIDGEGADDT10-08-2026.pdf
ATTACHMENT
01INTERCHANGEGADs_10.08.2026_compressed.pdf
ATTACHMENT
2x25kvTSSSPSSPDRG_compressed-1-8_1.pdf
ATTACHMENT
2x25kvTSSSPSSPDRG_compressed-9-14_1.pdf
ATTACHMENT
SHSRtrackstandardsandspecificationsPart1.pdf
ATTACHMENT
SHSRtrackstandardsandspecificationsPart2.pdf
ATTACHMENT
31_07_2025_ProcedureofProofCheckingofDesignofBridges.pdf
ATTACHMENT
LatticeTower20MDrawings_2.pdf
ATTACHMENT
LatticeTower40MDrawings_1.pdf
ATTACHMENT
LocationBoxdrawing_1.pdf
ATTACHMENT
MonopoleTower20MDrawings_1.pdf
ATTACHMENT
MonopoleTower40MDrawing_1.pdf
ATTACHMENT
MonopoleTower40MDrawing_2.pdf
ATTACHMENT
KavachCabRoofTop_2.pdf
ATTACHMENT
AFDASSpecification_1.pdf
ATTACHMENT
CTC_1.pdf
ATTACHMENT
AcceptanceTestSchemeforStationaryKAVACH_1.pdf
ATTACHMENT
SIGTCASTAN_1.pdf
ATTACHMENT
KavachRFIDTagandFixingArrangementGuidelines.pdf
ATTACHMENT
KAVACHSMOCIMP_1.pdf
ATTACHMENT
OnboardKAVACH_1.pdf
ATTACHMENT
StationaryKAVACH_1.pdf
ATTACHMENT
LPOCIPDisplayRequirement_1.pdf
ATTACHMENT
KavachUHFRadioModemRequirements_1.pdf
ATTACHMENT
KAVACHNMS_1.pdf
ATTACHMENT
KAVACHMultipleAccessScheme_compressed1.pdf
ATTACHMENT
KAVACHRFIDTagTINLayoutguidelines_3.pdf
ATTACHMENT
Systemrequiremntspecification_compressed.pdf
ATTACHMENT
S-KAVACHInterface_compressed1.pdf
ATTACHMENT
KAVACHTOC_compressed1.pdf
ATTACHMENT
SpecificationofKAVACHRIU_compressed1.pdf
ATTACHMENT
1.1-TowerDrawing_compressed1.pdf
ATTACHMENT
1.2-TowerDrawing_1.pdf
ATTACHMENT
1.3-TowerDrawing_1.pdf
ATTACHMENT
1.4-TowerDrawing_1.pdf
ATTACHMENT
Extractedpagesfrom2.1.1-KavachSpecification_1.pdf
ATTACHMENT
Extractedpagesfrom2.1.2-KavachSpecification_1.pdf
ATTACHMENT
2.2-KavachSpecification_1.pdf
ATTACHMENT
2.3-KavachSpecification_1.pdf
ATTACHMENT
10.1FunctionalRequirementsSpecificationofKAVACH_1.pdf
ATTACHMENT
10.2FunctionalRequirementsSpecificationofKAVACH_1.pdf
ATTACHMENT
4x48policy.pdf
ATTACHMENT
2024_06_03InstructionforincorporatingtheJPOCircularetc_ProvisionsintheTenderDocumentforallworksrequiringdiggingworksclosetoRly1.pdf
ATTACHMENT
TowerDrawingLatticeEPA15_2.pdf
ATTACHMENT
KavachUHFRadioModemRequirements_1.pdf
CORRIGENDUM
CorrigendumtotendernoticeandRFP.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .