| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹4.2 L+₹873 (0.21%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SREEKUMAR L2 | SAJIMON P.S L1 |
|---|---|---|---|---|---|
| 1.00Indoor playground | |||||
| 1.00 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 6.75 | sqm | 579.74 ₹3,913.25 Lowest | 579.74 ₹3,913.25 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.32 | cum | 359.72 ₹115.11 | 359 ₹114.88 Lowest |
| 1.00 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 1.04 | cum | 9,760.82 ₹10,151.25 | 9,760 ₹10,150.4 Lowest |
| 1.00 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 746.96 | kg | 230.93 ₹1,72,495.01 | 230 ₹1,71,800.34 Lowest |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 188.6 | kg | 187.05 ₹35,278 | 187 ₹35,268.57 Lowest |
| 1.01 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 85.36 | sqm | 164.86 ₹14,071.63 | 164 ₹13,998.22 Lowest |
| 1.01 | OD343951/2025-2026:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch ofcorrugation as approved by Engineer-in-charge) 0.35 mm (+0.05%), total coatedthickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side. of the sheet and polyester top coat 15-18 microns.Sheet should have protective guard film of 25 microns minimum to avoid scratchesduring transportation and should be supplied in single length upto 12 metre or as desiredby Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws ofsize (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical orcurved surfaces, excluding the cost of purlins, rafters and trusses and including cutting tosize and shape wherever required. | 149.69 | sqm | 893.57 ₹1,33,758.49 | 893 ₹1,33,673.17 Lowest |
| 1.01 | OD343952/2025-2026:Providing and fixing precoated galvanised steel sheet roofing accessories 0.35 mm (+ 0.05%) total coated thickness, zinc coating 120 grams per sqm as per IS:mm(+0.05%) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws complete: | 33 | metre | 415.13 ₹13,699.29 | 415 ₹13,695 Lowest |
| 1.01 | 18.48:Providing and placing on terrace (at all floor levels) polyethylene water storage tank :ISI 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. | 1,750 | Litre | 12.15 ₹21,262.5 Lowest | 12.15 ₹21,262.5 Lowest |
Tender Value
Refer Docs
EMD Value
₹10,586
Closing Date
27 May 2026, 6:00 pmClosed
Assistant Engineer Thanneermukkam GP
LSGD Section Thannermukkam GP
Annual Plan Project_No 72_2026 THANNEERMUKKOM GP 2025_26 RENOVATION AND PAINTING OF MARUTHORVATTAM LPS
2026_LSGD_852050_1
1/AE/TKM/2026-2027
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thanneermukkam
Please refer Tender documents.
12 documents required · 12 mandatory
₹935
₹10,586
8 Jun 2026
20 May 2026
29 May 2026
20 May 2026
27 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Indoor playground | |||||
| 1.001 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | - | sqm | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.003 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 0.2 | kg | - | - |
| 1.005 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 0.8 | kg | - | - |
| 1.006 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | - | sqm | - | - |
| 1.007 | OD343951/2025-2026:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch ofcorrugation as approved by Engineer-in-charge) 0.35 mm (+0.05%), total coatedthickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side. of the sheet and polyester top coat 15-18 microns.Sheet should have protective guard film of 25 microns minimum to avoid scratchesduring transportation and should be supplied in single length upto 12 metre or as desiredby Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws ofsize (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical orcurved surfaces, excluding the cost of purlins, rafters and trusses and including cutting tosize and shape wherever required. | 1 | sqm | - | - |
| 1.008 | OD343952/2025-2026:Providing and fixing precoated galvanised steel sheet roofing accessories 0.35 mm (+ 0.05%) total coated thickness, zinc coating 120 grams per sqm as per IS:mm(+0.05%) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws complete: | - | metre | - | - |
| 1.009 | 18.48:Providing and placing on terrace (at all floor levels) polyethylene water storage tank :ISI 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. | - | Litre | - | - |
stage.html
html • 0.02 MB
finance_1439706.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_1439706.xls
BOQ • 0.31 MB
PRELIMINARY.pdf
Tender Documents • 0.23 MB
TENDERFORM.pdf
Tender Documents • 0.28 MB
SBD.pdf
Tender Documents • 1.83 MB
NIT.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .