Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93,081.50Accepted-Finance | L1 | Accepted-Finance Lowest Bidder | |
| 2 | L2₹1.6 L+₹65,544.10 (70.4%)Accepted-Finance VILL TAJPUR P O JAGANNATHPUR P S HARIHARPARA MSD | MURSHIDABAD | WEST BENGAL | L2 | Accepted-Finance Non L1 Bidder | |
| 3 | L3₹1.7 L+₹76,140.29 (81.8%)Accepted-Finance | L3 | Accepted-Finance Non L1 Bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected |
Tender Value
₹2.1 L
EMD Value
₹4,230
Closing Date
23 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer, DHHSD
Puratan Bazar, Dakshin Hazipur, Diamond harbour, Pin-743331
Emergent restoration work of Bus Buffer Zone at Tulsirchak under Diamond Harbour Highway Division in the District of South 24 Parganas for ensuing Gangasagar Mela 2027.
2026_WBPWD_5083505_2
WBPWRD/AE/DHHSD/eNIT-06/26-27
Open Tender
CIVIL WORKS
Percentage
Diamond Harbour
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,230
Yes
27 Nov 2026
5 Nov 2026
25 Nov 2026
5 Nov 2026
23 Nov 2026
5 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Pumping out water from ponds or tanks
(P-4,It-8,Bldg) | 360 | cum (%) | 2,115.46 | ₹7,61,565.6 |
| 2 | Surface Drains in Soil
Construction of unlined surface drainsof average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres) (Reference to MoRT&H's specification clause 309). Mechanical means | 30 | meter | 86.65 | ₹2,599.5 |
| 3 | Bamboo (in single line) driven about half-length into ground at very close spacing side by side, with stout stays at an interval of 90cm fixed with bamboo post of length 1.25m driven 1m below G.L., 3 nos. of half split bamboo runner of same dia fitted and fixed with nails etc. and lining exposed portion with sheets made from cut drums (empty bitumen drums) fitted and fixed with a lap width of 100 mm at each joint, complete as per direction including the cost of drum sheets and including the cost of nails, wires etc With bamboos of length above 2.50m and upto 3.00m | 15 | meter | 1,727 | ₹25,905 |
| 4 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305). ( Stack Measurement) | 7.2 | cum | 220.72 | ₹1,589.18 |
| 5 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all man and machineries and as per specification and direction of Engineer-in-charge but excluding the cost of metals / chelly.
For Construction of Sub Base by consolidating Jhama metal : (63 mm to 45 mm) @ 0.91 cum of jhama metal per 10 sqm for compacted thickness of 75 mm. | 15 | cum | 2,724.49 | ₹40,867.35 |
| 6 | Filling empty Cement bags with Silver sand, stitching the bag (cost of thread included) and carrying and placing them in position & all incidental charges complete. | 70 | Each | 37.54 | ₹2,627.8 |
| 7 | Supplying,spreading and compacting sand to required thickness,in layers not exceeding 150mm to proper gradient and camber,inundating each layer by waterand packing and ramming layer by layer to achieve desired compaction,including lighting,guarding and barricading and making adequaite earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. | 9 | cum | 1,288.75 | ₹11,598.75 |
| 8 | Supplying of Jhama Metal (kiln burnt) (63 mm to 45 mm) stacked at at the site. | 7.5 | cum | 2,393.49 | ₹17,951.18 |
| 9 | Hire charges of JCB including P.O.L. , wages of operational staff per day (Round the clock i.e. 24 hours ) | 3 | day | 11,053.89 | ₹33,161.67 |
| 10 | Supply of Mazdoor (unskilled labour) for emergent maintenance work.
Unskilled labour
a. Majdoor (Male/ Female) | 80 | Head | 376.41 | ₹30,112.8 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_5201327.xls
BOQ • 0.27 MB
2911.pdf
Tender Documents • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .