Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Finance | -0.24% | ₹10.6 L | L1 | Admitted-Finance |
| 2 | L2₹10.8 LAdmitted-Finance | +2.00% | ₹10.8 L | L2 | Admitted-Finance |
| 3 | L2₹10.8 LAdmitted-Finance | +2.00% | ₹10.8 L | L2 | Admitted-Finance |
Tender Value
₹10.6 L
EMD Value
₹21,186
Closing Date
3 Feb 2026, 6:00 pmClosed
A.M.A.
ZILA PANCHAYAT BALLIA
Drain work from Bartar to Yadu Rai Garhi in Gram Sabha Pariva
2026_UPPRD_1108449_144
673/ZPBALLIA/25-26/DT-09.01.26
Open Tender
Civil Works
90 days
BALLIA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,250
A.M.A.
₹21,186
Yes
25 Feb 2026
24 Jan 2026
4 Feb 2026
24 Jan 2026
3 Feb 2026
24 Jan 2026
Excavation for roadway in soil using manual means for carrying cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Techical Specifcation Clause 302.3 as per Analysis
Providing concrete for plain/reinforced concrete1:3:6 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
M-150 brick work in 1:4 cement & C sand in foundation and plinth including supply of all materials, labour and T&P etc. as per Analysis
Filling in foundation trenches as per drawing & technical specification clause 305.3.9
12mm thick plaster on plain surface of wall with cement mortar consising of I part cement and 4 part of approved coarse sand . As per Analysis
R.C.C work with cement approved coarse sand and 2 cm. Gauge approved dalla grit proportion of 1:2:4 in Cover as per analysis
Mild steel or iron inplan work as in reinforced concrete or reinforce brick work wrought to required shape as necessary cutting ,bending for proper completion of the work and including supply of all steel its wastage bend hooks and authourise overlaping shall be measured required to proper completion of the work as per analysis
(WBM.GRADE 3) providing and laying and spreading and complteing stone aggregates of specific size to water bound mecadam speci. Inc. spreading in uniform thickness hand packing, rolling with there wheel 8-10 ton static roller in stages 2 proper grade and camber, applying and brooming stone screening/ binding materils to fill up the interstices of coarse aggregates watering and compacting to the required density grading 3 as per technical spec. clause 405.3 compacted thickness 75 mm.
Providing and Laying of cement concrete pavement thickness and expansion, construction joint as per design over a prepared sub base ,with 125 micron polythin film 20 mm stone grit and coarse sand , and proper curing 14 days for proper completion of the work as per as per Analysis
S/F of signboard with photography
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.08 MB
BOQ_2047145.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid