Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.0 L+₹19,561.64 (4.06%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹4.8 L
EMD Value
₹12,068
Closing Date
16 Oct 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT ENGINEER
THONDERNAD GRAMA PANCHAYATH OFFICE, WAYANAD
TNDGP/2023 24/Prj.304/PUTHIYIDAM WELL/WARD 11/AMT 5.70L
2023_LSGD_610503_4
AETNDGP/LID EW/2023-24/Phase-1.2
Open Tender
Civil Works - Water Works
Item Rate
150 days
THONDERNAD GRAMA PANCHAYTH
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,065
Yes
₹12,068
Yes
7 Dec 2023
9 Oct 2023
18 Oct 2023
9 Oct 2023
16 Oct 2023
9 Oct 2023
Amount
WELL CONSTRUCTION
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
OD140114/2023-2024:Sinking well in all classes of soil except hard rock which requires blasting to line and levels and plumb by scooping out from inside and below the stiening complete . (Upto 3.50M dia). First depth up to 3.0 mtr. Depth of sinking is reckoned from bed level All kinds of soil
OD140115/2023-2024: Sinking well in all classes of soil except hard rock which requires blasting to line and levels and plumb by scooping out from inside and below the stiening complete . (Upto 3.50M dia). Second depth up to 1.50 mtr. Depth of sinking is reckoned from bed level All kinds of soil
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
OD140116/2023-2024:Providing and fixing name board(CFC Fund) of size 150x120 cm with frame 40x20x16 G square rod including letter,priming<br>with synthetic enamel
Baby E J
Bidder Name
Baby E J
Stephen.P.M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_912535.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .