Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹58.8 L+₹2.9 L (5.25%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹54.3 L
EMD Value
₹50,000
Closing Date
20 Jun 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/o the Executive Engineer PWD Roads Division Kottayam
One year Running Contract for various PWD Roads under Road Section Karukachaal in Kottayam district 8 road stretches for a length of 43.645 km
2022_PWD_494945_1
PWD/RB/TR/8223/2022_5_1_1/RC 1/2
Open Tender
Civil Works - Roads
Item Rate
365 days
karukachal
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
19 Aug 2022
14 Jun 2022
22 Jun 2022
14 Jun 2022
20 Jun 2022
15 Jun 2022
Amount
Appendix A - Reactive maintenance
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD67423/2022-2023:Mix seal surfacing:-Providing laying and rolling close -graded premix surfacing material of 20mm thickness composed of 11.2mm to 0.90mm(Type -A) or 13.2mm to 0.90mm (Type-B) aggregate using penetration grade bitumen to required line,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant,laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per technical specification Clause 509 of MORTH
Appendix B - Premonsoon works
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
OD67419/2022-2023:Engaging man mazdoor for clearing drain, culvert and other miscellaneous items
OD67420/2022-2023:Engaging wood cutter for cutting branches of trees and removing debris from premises
OD67421/2022-2023:Engaging hydraulic excavator for removing deposited materials during monsoon season in road way and other emergent nature works for restore traffic
OD67422/2022-2023:Engaging Tipper 5.5 cum capacity from conveying the silt removed
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
Appendix C - Proactive maintenance
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD67424/2022-2023:Mix seal surfacing:-Providing laying and rolling close -graded premix surfacing material of 20mm thickness composed of 11.2mm to 0.90mm(Type -A) or 13.2mm to 0.90mm (Type-B) aggregate using penetration grade bitumen to required line,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant,laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per technical specification Clause 509 of MORTH
OD67425/2022-2023:Filling up potholes with bituminous ready mix compound (25kg bag) and compacting by ramming to get a compact surface including of cost of material,laying charges, transportation to site etc. complete rate is arrived for a bag of 25kg Assuming a average of 30 bags of 25 kg ready mix compound will be laid in potholes in a day
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
OD67426/2022-2023:Conducting and reporting routine inspections for the entire length of project Road at a frequency of 7 days through out the agreement period of the running contract as directed by the departmental officer at site Additional RI may be required in response to reports or complaints from the police, other authorities and the public as a result of major incidents, typhoon or flooding damages etc. and are not measurable/ payable. A proportion of the RI should be carried out either during or immediately following a period of wet weather.
Appendix D - Emergency works
8.45:Provision of metal drum/empty bitumen drum delineator, 300 mm in diameter, 800 mm high, filled with earth for stability, painted in circumferential strips of alternate black and white 100 mm wide fitted with reflectors 3 Nos of 7.5 cm dia, all as per IRC:SP:55-2001
OD67418/2022-2023:Filling up potholes with bituminous ready mix compound (25kg bag) and compacting by ramming to get a compact surface including of cost of material,laying charges, transportation to site etc. complete rate is arrived for a bag of 25kg Assuming a average of 30 bags of 25 kg ready mix compound will be laid in potholes in a day
NIKHIL T REJI
Bidder Name
JINU MATHEW KURIAN
NIKHIL T REJI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .