Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
| 4 | Accepted-Technical C 504 ATS BOUQUET TOWER C 5TH FLOOR SECTOR 132 NOIDA 201305 | NOIDA | GAUTAM BUDDH NAGAR | UTTAR PRADESH | 201305 | Accepted-Technical Accepted |
| 5 | Accepted-Technical | Accepted-Technical Accepted |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
15 Sept 2025, 12:00 pmClosed
Chief Engineer Transmission Central Zone
Pareshan Bhawan SLDC Campus Near Mantri Awas Vibhuti khand II Gomtinagar Lucknow
Supply Including Design and Engineering, Installation, Testing and Final Commissioning of 145 KV XLPE Copper and Aluminium Power Cables alongwith Accessories and Termination kits and Associated Works at 220 KV Substation Sarojininagar Lucknow
2025_UPTCL_1060663_1
E Tender No. 11-CE(TC)/2025-26
Open Tender
Electrical Works
Piece-work
120 days
Transmission Central Zone Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
Dy General Manager Accounts TC
₹2.0 L
12 Feb 2026
28 Jul 2025
16 Sept 2025
28 Jul 2025
15 Sept 2025
28 Jul 2025
28 Jul 2025 - 20 Aug 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.30 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
TD.pdf
Tender Documents • 2.38 MB
BOQ_1932127.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .