Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.4 LAccepted-AOC | ₹8.4 L | 1 | Accepted-AOC L1 Bidder |
| 2 | 2₹8.6 L+₹13,691.02 (1.63%)Rejected-AOC | ₹8.6 L+₹13,691.02 (1.63%) | 2 | Rejected-AOC L2 Bidder |
| Sl No | Description | Qty | Unit | MOHAMMED MUSTHAFA V L1 | MANAF V L2 |
|---|---|---|---|---|---|
| 1.00Painting of 8 Nos. regulator gates | |||||
| 1.00 | OD7695/2026-2027:Removing debris and cleaning the shutter grooves and seal tracks and roller tracks. | 8 | set | 2,501.18 ₹20,009.44 Lowest | 2,501.18 ₹20,009.44 Lowest |
| 1.00 | OD7692/2026-2027:Providing with Temporary Platform (Suspended type) of size 6m X 2.5m, with scaffolding pipe suspension from overhead structure, for the repair works/painting of shutters, hoisting bridges, etc. including the cost of bracing, fittings, handling charges, assembling, dismantling and all safety arrangements complete. | 12 | set | 1,836.97 ₹22,043.64 Lowest | 1,836.97 ₹22,043.64 Lowest |
| 1.00 | OD7691/2026-2027:Overcoat painting the regulator gates and embedded parts with two coats of epoxy coal tar black paint conforming to IS: 14948 with a minimum film thicknessof 150+/- 5 microns, after cleaning the surface using high pressure water jet including cost of materials, labour charges, cost of testing all painting materials, incidental charges, hire of T&P etc. complete as per the direction of Departmental officers at site Rate analysis for 10m2 | 1,268.83 | sqm | 277.21 ₹3,51,732.09 Lowest | 288 ₹3,65,422.75 |
| 1.00 | 85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | 317.29 | sqm | 494.79 ₹1,56,989.45 Lowest | 494.79 ₹1,56,989.45 Lowest |
| 1.00 | OD7693/2026-2027:Applying grease on the wheel assembly including materials, labour, conveyance etc, complete as per the directions of departmental officers at site. | 8 | set | 5,461.75 ₹43,694 Lowest | 5,461.75 ₹43,694 Lowest |
| 1.01 | OD7694/2026-2027:Alignment checking and correcting of wire ropes and pulley assembly of vertical lift shutters including cost of all labour , incidental charges, tools and conveyance etc. complete | 8 | set | 5,068.4 ₹40,547.2 Lowest | 5,068.4 ₹40,547.2 Lowest |
| 2.00Replacement of 2 Nos. gear box with new and overhauling of the hoisting mechanism. | |||||
| 2.00 | OD13313/2026-2027:DISMANTLING the existing damaged REDUCTION GEAR BOX and STACKING at convenient place. | 2 | no | 4,727.59 ₹9,455.18 Lowest | 4,727.59 ₹9,455.18 Lowest |
| 2.00 | OD13322/2026-2027:Dismantling of the Hoisting unit frames and stacking at a distance of 100metre including hire of machinery, labour etc. complete as directed by the departmental officer at site. | 21.76 | kilogram | 4.45 ₹96.83 Lowest | 4.45 ₹96.83 Lowest |
Tender Value
₹8.4 L
EMD Value
₹21,057
Closing Date
10 Aug 2026, 5:00 pmClosed
Muhamed Haris.S
O/o Assistant Executive Engineer, Workshop Subdivision Malampuzha
GENERAL-Velliyamkallu RCB-Replacement of 2no damaged gear box and Painting of 8nos shutters-Replacement of 2no damaged gear box and Painting of 8nos shutters of Velliyamkallu RCB at Thrithala-General Mechanical Work
2026_Irrig_862264_1
IRR/MH/TR/3382/2026_16_1_1/1
Open Tender
Repair and Maintenance Works
Item Rate
180 days
Thrithala
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,860
Yes
₹21,057
Yes
2 Sept 2026
24 Jul 2026
14 Aug 2026
24 Jul 2026
10 Aug 2026
24 Jul 2026
24 Jul 2026 - 10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Painting of 8 Nos. regulator gates | |||||
| 1.001 | OD7695/2026-2027:Removing debris and cleaning the shutter grooves and seal tracks and roller tracks. | - | set | - | - |
| 1.002 | OD7692/2026-2027:Providing with Temporary Platform (Suspended type) of size 6m X 2.5m, with scaffolding pipe suspension from overhead structure, for the repair works/painting of shutters, hoisting bridges, etc. including the cost of bracing, fittings, handling charges, assembling, dismantling and all safety arrangements complete. | - | set | - | - |
| 1.003 | OD7691/2026-2027:Overcoat painting the regulator gates and embedded parts with two coats of epoxy coal tar black paint conforming to IS: 14948 with a minimum film thicknessof 150+/- 5 microns, after cleaning the surface using high pressure water jet including cost of materials, labour charges, cost of testing all painting materials, incidental charges, hire of T&P etc. complete as per the direction of Departmental officers at site Rate analysis for 10m2 | 0.6 | sqm | - | - |
| 1.004 | 85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | - | sqm | - | - |
| 1.005 | OD7693/2026-2027:Applying grease on the wheel assembly including materials, labour, conveyance etc, complete as per the directions of departmental officers at site. | - | set | - | - |
| 1.006 | OD7694/2026-2027:Alignment checking and correcting of wire ropes and pulley assembly of vertical lift shutters including cost of all labour , incidental charges, tools and conveyance etc. complete | - | set | - | - |
| 2Replacement of 2 Nos. gear box with new and overhauling of the hoisting mechanism. | |||||
| 2.001 | OD13313/2026-2027:DISMANTLING the existing damaged REDUCTION GEAR BOX and STACKING at convenient place. | - | no | - | - |
| 2.002 | OD13322/2026-2027:Dismantling of the Hoisting unit frames and stacking at a distance of 100metre including hire of machinery, labour etc. complete as directed by the departmental officer at site. | - | kilogram | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.64 MB
BOQ_1458340.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .