| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.5 LAccepted-AOC | L1 | Accepted-AOC Agreement executed | |
| 2 | L2₹36.6 L+₹1.1 L (3.19%)Rejected-AOC MADAPALLIKUNNEL H POONJAR | L2 | Rejected-AOC Rejected. highest bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical HIghest bidder |
| Sl No | Description | Qty | Unit | AJIMON K R L1 | SAJI M M L2 | BIBIN BABY L3 |
|---|---|---|---|---|---|---|
| 1.00MCF Construction | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 20 | cum | 215.89 ₹4,317.8 | 150 ₹3,000 Lowest | 250 ₹5,000 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 11.83 | cum | 301.45 ₹3,567.36 | 200 ₹2,366.8 Lowest | 300 ₹3,550.2 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 14.4 | cum | 6,647.76 ₹95,701.15 Lowest | 7,000 ₹1,00,772 | 7,500 ₹1,07,970 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 39.9 | sqm | 639.29 ₹25,507.67 | 162 ₹6,463.8 Lowest | 750 ₹29,925 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 140.31 | kilogram | 94.22 ₹13,219.54 Lowest | 110 ₹15,433.55 | 110 ₹15,433.55 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.53 | cum | 7,739.74 ₹50,509.54 | 7,350 ₹47,966.1 Lowest | 9,200 ₹60,039.2 |
| 1.01 | OD284710/2025-2026:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 18.56 | cum | 6,499.75 ₹1,20,622.36 | 6,350 ₹1,17,843.3 Lowest | 7,600 ₹1,41,040.8 |
| 1.01 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 4,419.68 | kg | 193.52 ₹8,55,295.51 Lowest | 230 ₹10,16,525.25 | 230 ₹10,16,525.25 |
| 1.01 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 1,934.09 | kg | 156.75 ₹3,03,168.29 Lowest | 185 ₹3,57,806.28 | 180 ₹3,48,135.84 |
Tender Value
₹42.4 L
EMD Value
₹50,000
Closing Date
3 Mar 2026, 11:00 amClosed
Assistant engineer
LIDEW Section office, Karoor Grama Panchayat
Pro No 113/25-2 Construction of MCF Second Reach in ward No 14-
2026_LSGD_839198_3
TEN05/AE/LIDEW/KRGP/ 2025-2026
Open Tender
Civil Works - Buildings
Percentage
VALAVOOR, Karoor Grama Panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
1 Jun 2026
23 Feb 2026
4 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1MCF Construction | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.006 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.007 | OD284710/2025-2026:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | - | - |
| 1.008 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | - | kg | - | - |
| 1.009 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 0.2 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1413906.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.91 MB
Tendernotice_2.pdf
PDF • 0.18 MB
Tendernotice_3.pdf
PDF • 0.25 MB
Tendernotice_4.pdf
PDF • 0.36 MB
Tendernotice_5.pdf
PDF • 0.04 MB
Tendernotice_6.pdf
PDF • 1.06 MB
BOQ_1413906.xls
BOQ • 0.35 MB
PRE113.pdf
Tender Documents • 0.67 MB
SBD1131.pdf
Tender Documents • 1.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .