Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹9.3 Cr
EMD Value
₹9.3 L
Closing Date
17 Nov 2026, 3:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Karnataka Power Transmission Corporation Limited
Muniraju.P
Tender for the work of laying of 66kV, 630sqmm UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
KPTCL/2026-27/UC/WORK_INDENT4258
KPTCL/2026-27/UC/WORK_INDENT4258
Open
UG Cable
Two Tender Document System(Two Cover)
KPTCL CEE Corporate Office Tendering and Procurement Bengaluru
6 documents required · 6 mandatory
Documentary proof for Clause No. 3.2(b)(ii) of ITT (UG Cable Transmission lines) such as P.O, LOI/LOA, DWA, Work done Certificates, Performance Certificates issued by the end users not below the rank of Executive/Divisional Engineer.
Clause no: 3.2(d) (A) (2) (a): The Cable Manufacturer shall be an ISO-9001/9002 certified manufacturer & should have minimum experience of not less than Five(5) years as on the date of bid submission in the design, manufacture, testing, supply of EHV cable of 66kV or higher voltage class as tendered, copper conductor, XLPE insulated, segmental compact type Milliken, lead/ corrugated aluminium sheath. Bidder shall upload documentary evidence such as i) P.O. copy (ii) Order completion certificate (iii) Test certificates in support of the same
Clause No. 3.2(d)-B-2-(a) of ITT: Documentary proof for minimum five years experience and two years successful opertaions of UG Cable accessories (i.e. Joints & terminations) - such as P.O, LOI/LOA, DWA, Performance Certificates issued by the end users (Utilities) not below the rank of Executive/Divisional Engineer.
Clause No. 3.2(d)-A-2-(b) of ITT: Documentary proof for minimum two years successful opertaions of UG Cable supplied in India- such as P.O, LOI/LOA, DWA, Performance Certificates issued by the end users (Indian Government power Utilities) not below the rank of Executive/Divisional Engineer.
Audited financial statements including Balance sheets, Profit and Loss statements, Turnover Certificate in the prescribed format (Annexure-XX), Auditors Reports of the last five years preceding the date of bid submission of the Bidder
Clause No: 3.6 of ITT: Assessed available tender capacity such as, i)existing commitments and ongoing works statement & countersigned by Employer in charge, not below EE or equivalent OR certified by CA/Cost Auditor & PO/Work Award copies ii) Self declaration iii) Certificate from CA for split details of Ex-works values and GST of Contract values of the works in the prescribed format as at Clause No. 1.5 of Section-3: Qualification Information by the Bidder
clause no.3.3 (b) of ITT (Liquid Assets and /or availability of credit facilities) :Bidder shall upload Bankers Certificate of Bidder duly signed by authorized person in the prescribed format as at Annexure XVIII of Section-4.
self-declaration as sought in Clause No. 3.6 Note (ii) of ITT by the Bidderstating that the information with regard to assessed available tender capacity (Works on Hand) furnished are correct.
Self-declarations of Bidder in respect of Litigation, disqualification due to nonperformance, Technical Snag for & EHV UG Cable, Risk & cost clause and Restriction on border sharing as specified in Annexure XVI& AnnexureXVII as per Clause No.2.4of ITT. Declarations for Technical Snag by EHV UG Cable manufacturers
Power of Attorney in favour of all the persons signing the documents, and copy of Resolution passed by BoD/ all the Partners of the Firm
Certificate of Incorporation of the bidder or any relevant document in respect of Partnership/Proprietorship firms as per the tender document
The bidder should have valid GST registration with GSTIN number PAN Card and ISO Certificates
No Deviation Certificate
Letter of Undertaking as in Annexure V
Qualification and experience of key Personnel proposed for carrying out the Work
Description of the Tools & Plant available with them for execution of the Work
Undertaking to source the supply of equipment/material from KPTCL approved Vendors only
Undertaking to source the equipment/ material for the work from the Vendors who meet the eligibility clauses regarding restrictions on procurement from a country which shares a land border with India as per Annexure -XVII.
Copies of original documents defining the Constitution or Legal Status, place of Registration and Principal place of Business of the Bidder
Declarations for Deviations, if any as per Schedule-5 and Schedule-6 of the Techno Commercial sheets
Information on litigations in which the Tenderer is involved as per prescribed format as at 1.12 of Qualification Information
Upload all relevant documents as per NIT, tender documents and technical specifications
Techno Commercial sheets duly filled
ISO-9001/9002 certificate of EHV UG Cable manufacturer
Clause No. 3.2(d)-A-2-(c)-Note(ii) of ITT: Undertaking jointly with Cable Manufacturers and Undertaking jointly with Cable accessories Manufacturers.
Clause No. 3.2(d)-A-2-(c): Cable manufacturer-type test reports and cable joint & terminations manufacturer-type test reports
Documentary proof of cl. no. 3.2-d-A-Note-4 (if applicable)
All other documents sought in the Detailed NIT
All other documents sought in tender document
All Type test reports sought in the tender
Declaration for not been been Blacklisted/disqualified for non-performance in any of the Government utilities in the past five years as on date of Bid opening
Undertaking-2B
Undertaking-3
Undertaking-4
All other terms and conditions as per Tender documents
Bidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka
Letter of Undertaking as in Annexure
The Tenderer shall upload declarations for Deviations, if any as per Schedule-5 and Schedule-6 of the Techno Commercial sheets
List of existing commitments and ongoing works
Declaration regarding Risk & Cost clause as stipulated in tender documents
All Annextures as stipulated in tender documents
Any other relavant Documents
Undertaking-5
Undertaking-2
The Bidder shall upload Valid Super Grade Electrical Contractor License by GoK OR Form J-1 Verification Letter by CEI, GoK to Other State License Holder
Declaration for not having any litigation or arbitration arising out of contracts completed or under execution by it over the last five years with KPTCL
Undertaking-2A
Undertaking-4
No Deviation Certificate
₹5,000
₹9.3 L
4 Nov 2026
4 Nov 2026
18 Nov 2026
4 Nov 2026
30 Oct 2026
Karnataka Power Transmission Corporation Limited
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
TECHNO - COMMERCIAL SHEETS
NOTE* For detailed scope of the work please refer Bid Documents.
BIDDERS TO READ CAREFULLY
THE FOLLOWING DOCUMENTS [DULY SIGNED BY AUTHORISED PERSON, WHEREVER NECESSARY] ARE TO BE UPLOADED AND BANK GUARANTEE/INSURANCE SURETY BOND TOWARDS EMD OVER AND ABOVE RS.1.00LAKH AS PER ANNEXURE-II OF THE BID DOCUMENT SHALL BE SENT IN ORIGINAL TO CHIEF ENGINEER ELECTY., (T&P), KPTCL, BENGALURU SO AS TO REACH THIS OFFICE AFTER THE LAST DATE OF SUBMISSION OF BID AND ON OR BEFORE THE DATE & TIME NOTIFIED FOR OPENING OF TECHNO COMMERCIAL BIDS, FAILING WHICH THE BID WILL NOT BE OPENED. 1) NO DEVIATION CERTIFICATE (SCHEDULE-16). 2) EMD/BID SECURITY AS DETAILED IN CLAUSE NO. 13 of ITT. 3) BANK GUARANTEE issued either by a Nationalized/Scheduled Bank OR INSURANCE SURETY BOND issued by Insurance Company authorized by Insurance Regulatory and Development Authority of India (IRDA) TOWARDS BALANCE EMD/BID SECURITY. (For the balance EMD above Rs. 1.00Lakhs) (SCHEDULE-17) - as detailed in Clause No. 13 of ITT-The Bidder shall scan the Bank Guarantee/INSURANCE SURETY BOND towards EMD and upload the same in the prescribed format in the slot specified for “EMD and Tender Fee Payments” in the e-procurement portal to enable the owner for verification of EMD BG/ISB at the time of opening of Techno Commercial Bid, failing which the offer will be rejected. 4) LETTER OF UNDERTAKING (SCHEDULE-18). 5) CONSORTIUM AGREEMENT (IF APPLICABLE-SCHEDULE-19) 6) POWER OF ATTORNEY (SCHEDULE- 20). 7) ANY OTHER AGREEMENTS /UNDERTAKINGS/SELF DECLARATIONS SPECIFIED IN THE TENDER.
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
BID PROPOSAL SHEET
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bidder's Name & Address alongwith GSTIN no. :
Bid Proposal Reference :
Person to be contacted :
E-Mail Address:
The Chief Engineer, Electricity,
Tendering & Procurement, KPTCL,
9th Floor, Indhana Bhavana, Bangalore - 560 009.
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
a) * We have submitted bid as individual Bidder. (Indicate Name of the Individual Bidder)
b) * We have submitted bid in Consortium with the following Bidders. (Key in Consortium)
Name of the Consortium Partner Scope / Participation of each Consortium Partner
(* Fill-up whichever is applicable)
1 We, the undersigned Bidder, having read and examined in detail the specifications and all the Bidding documents of the said work and hereby propose to design, manufacture/fabricate, shop test, supply on FOR site basis, and carry out the erection, testing and commissioning including civil, structural and architectural works for
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
2 PRICES AND VALIDITY :
2.1 We declare that the Prices stated in our Proposal are in accordance with subject Bid Documents (including Clause No.40 of "Conditions of Contract (CC)" & Clause No.12 of Instruction to Tenderers (ITT) of Bid Documents. We further declare that all Ex-works price/CIF components of Spares, Maintenance and Testing Equipments and other charges viz., Freight and Insurance, Type Test charges and other charges stated in our proposal shall be as per the Tender conditions. All the Price and other terms and conditions of this Proposal are valid during the Performance of the Contract.
2.2 All Duties, such as Custom Duties on imports, Levies, Surcharge/Cess etc., if any applicable on the transaction excluding GST are included in the Bid Price and shall be to Our account and the Owner is not having any liability whatsoever on this account, whatever may be the contrary elsewhere in the Bid documents. However the component of Duties included in the Bid Price are separately indicated in Schedule - 2 for TDS purpose. We further confirm that our Bid Prices as quoted in Schedule-I, include all import Duties and levies including Licence fees lawfully payable by us on imported items and all other Duties and Levies applicable on Bought-out Components, Materials, Equipment and other items and confirm that any such Duties and Levies additionally payable shall be to our account. We further confirm that, no Sales Tax in any form shall be payable by Owner either for Bought-out items which are despatched by our Sub-Suppliers directly to the Project Site or for items Supplied directly by us. We confirm that, the Prices quoted by us are excluding GST.
2.3 We declare that we have noted and considered Clause No.39 of Conditions of Contract (CC ), Clause No. 11.11 of Instruction to Tenderers(ITT) of Bid Documents regarding Taxes and Duties and quoted our Prices accordingly. We further agree for TDS as per Statutory stipulations.
2.4 The Bid Prices, the Price components of the various items in our Scope of Supply, Erection including Testing & Commisisoning, Civil and Mandatory spares is quoted in Item-Wise Financial Bid (on Percentage rate basis) in KPP Portal for this proposal..
3 CONSTRUCTION OF THE CONTRACT : We, declare that we are making the Offer on the basis of Single Contract for the entire Scope of the Package in accordance with Clause No.26.2 of Instruction to Tenderers (ITT) of Bid Document.
4 We having studied Clause No.39 of Conditions of Contract (CC ), Clause No. 11.11 of Instruction to Tenderers(ITT) of Bid Documents , relating to Tax and we hereby, declare that if any income-tax, surcharge on income tax or any other corporate tax is attracted under the law, we agree to pay the same.
5 Bid Security/ EMD : We have enclosed a Bid Security through e-Payment mode for a sum of Rs.1.00Lakhs and remaining amount of Rs..........Lakhs ( above Rs.1.00 Lakhs) in the form of Insurance Surety Bond (ISB) issued by Insurance Company authorized by Insurance Regulatory and Development Authority of India (IRDAI) OR in the form of Bank Guarantee in original valid for a period of 225 days from last date of bid submission and liable to be forfeited in accordance with Bid Documents. (Mode of Payment towards EMD is as detailed in CLAUSE NO. 13 of ITT & Clause No. 5 of NIT)
We have also ensured that the above Bid Guarantee furnished by us is in line with the Bid Documents and complete in respect of following :
1. Value of Non judicial Stamp Paper purchased in the name of executing Bank is as per Stamp Act.
2. Power of Attorney Number and Date as well as Signature and Full Name and Designation of Executant along with Bank's Stamp are there.
3. Signature, Full Name, Designation and address of Witness are there.
4. Completed Mailing address of the Head Office of the Bank is indicated.
6.1 We declare that the Works shall be performed strictly in accordance with the Specifications and Documents except for the variations and Deviations, all of which have been detailed out exhaustively in the following Schedules, irrespective of whatever has been stated to the contrary anywhere else in our Proposal.
a Commercial Deviations Schedule Schedule - 5
b Technical Deviations Schedule Schedule - 6
6.2 We further confirm that Specified Stipulation of following Clauses are acceptable to us and No Deviation / Exceptions are taken on any account whatsoever in the following Clauses.
a. Terms of payment Clause No. 37 of Section-5,Conditions of Contract (CC) and Clause No.8 of Special Conditions of Contrac (SCC)
b. EMD/Bid Security Clause No. 6, Section :1, Invitation for Tenders (IFT) and Clause No. 13, Section :2, Instruction to Tenderer (ITT)
c. Contract Performance Guarantee Clause No. 29 of Section:2, Instruction to Tenderers (ITT).
d. Penalty for delay Clause No. 41 of Section-5 : Conditions of Contract (CC).
e. Price Basis/ Price adjustment Clause No. 40 of Section-5 :Conditions of Contract (CC).
f. Defects Liability Period/Guarantee Clause No. 10 of Section-5 Special Conditions of Contract (SCC)
g. Work Schedule Clause No.17 of Section:5 Conditions of Contract (CC)
h. Taxes and Duties Clause No. 11.11 of Section-2: Instruction to Tenderers (ITT).
Further, we agree that additional conditions, if any, found in the Proposal Documents other than those stated in Deviation Schedules, save that pertaining to any rebates offered, shall not be given effect to.
7 PERFORMANCE GUARANTEE ; We declare that the ratings and performance figures of the equipment to be supplied and erected by us are guaranteed. The Guaranteed particulas of different equiment in our Scope are enclosed in Data Requirement Sheets.
8 BID PRICING : We further, declare that the Prices stated in our Proposal are in accordance with your ITT & SCC & all other relevant clauses of Bid Documents.
9 PRICE ADJUSTMENT : We declare that the Prices quoted by us are in accordance Clause No. 40 of Section-5 :Conditions of Contract (CC)
10 SPECIAL TOOLS AND TACKLES : We have given a list of Special Tools and Tackles in Schedule - 7 and Prices thereof are included in our lumpsum Bid Price. We further agree that any items of Special Tools and Tackles, though not included in the aforesaid list, but required for effective Erection, Testing, Commissioning & Operation of the Equipments of Substations & Transmission lines shall also be furnished by us, at no extra cost to you.
11 ADDITIONAL INFORMATION : In addition to the information called for in these Proposal Sheets, we have included with this Proposal, additional information as listed in Schedule - 8. We further confirm that such additional information does not imply any additional deviation beyond those covered in Schedule - 5 & 6 and in case of any contraction between these additional information and other provisions of Bid, the later will prevail.
12 QUALIFICATION DATA : We confirm having submitted the Qualification Data, as required by you in your Bid Documents in e-Procurement Portal along with this Proposal. Further we have filled in the information for Qualification Requirements in Schedule 9. In case you require any further information in this regard, We agree to furnish the same in time.
13 WORK SCHEDULE : If this Proposal is accepted by you, we agree to submit Engineering Data, Provide Services and complete the entire Work from time to time, in accordance with Schedules indicated in the Proposal. We fully understand that the Time Schedule stipulated in this Proposal is the essence of the Contract, if awarded. The completion schedule of the various Major Key Phases of the Work is indicated in Schedule - 11.
14 CONTRACT PERFORMANCE GUARANTEE ; We further agree that if our Proposal is accepted, we shall provide an irrecoverable Contract Performance Guarantee, of value equivalent to Five percent (5%) of the Amount Put to Tender (Excluding GST) plus additional security for unbalanced tenders in accordance with Clause 29 of Instructions To Tenderers (ITT) of the tender valid up to the end of ninety (90) days after the end of the Contract Guarantee Period mandatorily in the form of Insurance Surety Bonds (ISBs) issued by Insurance Company authorized by Insurance Regulatory and Development Authority of India (IRDAI) (OR) in the form of electronic Bank Guarantee (e-BG) from the Banks which are integrated with NeSL in the form attached as Annexure-III (Section 4: Formats of Annexures) in your favour in accordance with Clause 25.5 of ITT and Clause 43 of the CC (Conditions of Contract), as per the format given in Section 4 and enter into a formal agreement with you within Twenty (20) days from the date of issue of Letter of Intent to Award the Contract.
15 We, the partners of the Consortium whose Signatures are appended below, shall be liable jointly and severally for the execution of the Contract(s), in the event of Award, in accordance with the terms of Contract(s). The Lead Partner for this Bid - M/s .................................................................................... on behalf of the Consortium, is submitting the Bid. The Power of Attorney in favour of M/s .......................................................................................is enclosed.
16 BID PRICE : We declare that our lumpsum Price for the entire scope of work specified in the specifications and documents, shall be as indicated in Schedule - 1.
17 CHECK LIST : We have included a Checklist duly filled in Schedule 22
18 We, hereby, declare that only the Persons or Firms interested in this Proposal are named herein as Principals and that no other Persons are interested in the Proposal or in the Contract to be entered into, if we are awarded the Contract, and that this proposal is made without any connection with any other Person, Firm or Party likewise submitting a Proposal and that this Proposal is in all respect for and in good faith, without collusion or fraud.
19 We declare, in case our bid is accepted, that until a formal Contract is prepared & executed, this bid together with your written letter of acceptance thereof and your notification of award /Letter of Intent to Award the Contract shall constitute a binding contract between us. We further understand that you are not bound to accept the lowest or any bid you may receive.
Thanking you, we remain,
Yours faithfully,
Place Printed Name
Business Address Country of Incorporation (State or Province to be indicated)
Name and Address Principal Officer
Karnataka Power Transmission Corporation Limited
SHEET FOR TECHNO COMMERCIAL OPENING (Unpriced)
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
FILL ONLY IN LIGHT BLUE COLOURED CELLS.
Bidder's Name & Address alongwith GSTIN no. : To,
The Chief Engineer, Electy., Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana, BANGALORE - 560009
We declare that in terms of Clause No. 11 of ITT, Bid documents, the following are our lumpsum price in Rupees for the entire scope of work as specified in the Specifications and Documents.( Inclusive of all Taxes (Excluding GST) & Duties).
Total Lumpsum Price : ( In Figures)
Total Lumpsum Price : ( In Words)
Place Designation
Name of the Company
Karnataka Power Transmission Corporation Limited
SCHEDULE - 2 (1 of 2)-SUMMARY OF PRICE COMPONENTS
SHEET FOR TECHNO COMMERCIAL OPENING (Unpriced)
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
FILL ONLY IN LIGHT BLUE COLOURED CELLS.
Summary of Price Components
Bidder's Name & Address alongwith GSTIN no. : To,
The Chief Engineer, Electy., Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana, BANGALORE - 560009.
Summary price components for identified in accompanying specifications
( Name of the Work) as per the scope identified in accompanying specifications.
Sl no Description Amount in Rs. (Fill as "YES" against the above Price columns in case Prices are indicated in the Price templates)
Establishing Sub station Construction of Transmission Lines
A Material / Equipment Price (including Packing & Forwarding charges) in the Scope of the Contractor
Ex-works including all taxes & duties [As per schedules - 3A(i) for Station & 3B(i) for Line]
ii) Freight and Insurance Charges (Not Applicable) [As per schedules - 3A(i) for Station & 3B(i) for Line]
iii) Total FOR site price (i+ii)
B Mandatory spares price (including packing & forwarding charges)
Ex-works including all taxes & duties(As per schedule - 4)
ii) Freight and Insurance Charges(Not Applicable) (As per schedule -4)
iii)Total FOR site price (i + ii)
C Supply portion total FORD price [A+B]
D Erection portion:
i) Total charges for Erection, Testing & Commissioning of all Supply items [as per schedules-3A(ii) for Station, 3B(ii) for Line]
ii) Total charges for entire civil works [ as per Schedules-3C(i) for Station and 3C(ii) for Line]
iii) Total civil works, erection, Testing and commisioning charges (i)+(ii)
E Total Bid Price = C+D(iii) In figures : Rs.
Total Bid Price in Figures : Rs.
Total Bid Price in words : Rupees
Note: The erection charges shall include the charges for taking delivery at Owner's store, unloading, handling, storage, erection, testing and commissioning of all equipments and applicable GST.
Place Designation
Name of the Company
Karnataka Power Transmission Corporation Limited
SCHEDULE - 2 ( 2 of 2 ) - TAXES (Excluding GST), DUTIES & OTHER LEVIES
SHEET FOR TECHNO COMMERCIAL OPENING (Unpriced)
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Fill IN LIGHT BLUE COLOURED CELLS.
Bidder's Name & Address alongwith GSTIN no. : To,
The Chief Engineer, Electy., Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana, BANGALORE - 560009.
Estimates of Indian Taxes (Excluding GST), Duties and Levies included in the Total Bid Price are as follows:
SL. No. Description of Applicable Tax (Excluding GST) / Duty / Levy Establishing Sub station Construction of Transmission Lines
Rate of Tax (Excluding GST)/ Duty / Levy Amount of Taxes (Excluding GST) / Duties in Rupees Rate of Tax (Excluding GST) / Duty / Levy Amount of Taxes (Excluding GST)/ Duties in Rupees
1 Applicable taxes (Excluding GST), duties & levies prevailing as on the last date of bid submission shall be quoted
i. Supply Portion
ii. Erection Portion
iii. Civil Portion
i. Supply Portion
ii. Erection Portion
iii. Civil Portion
i. Supply Portion
ii. Erection Portion
iii. Civil Portion
6 Building and other construction workers welfare Cess for Supply, Erection and Civil Portion works
8 a. Applicable Customs Duty (*) (Bidders shall also clearly indicate the breakup of Customs duty such as BCD, Cess,etc.,)
b. If there is any existing Treaty between India and the country from where the goods required for this project are proposed to be imported, then copy of the treaty shall be uploaded.
9 Other Taxes & duties if any (Specify) **
10 Other Taxes & duties if any (Specify) **
11 Total (Sum of 1 to 10)
(*) In case of CIF portion of Supply.
** Please Specify the nature of the other Taxes (Excluding GST) along with the details in the "Rate" Column.
Place Designation
Name of the Company
Karnataka Power Transmission Corporation Limited
SCHEDULE - 2A : SCHEDULE OF DISCOUNT
SHEET FOR TECHNOCOMMERCIAL OPENING (UN - PRICED)
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
FILL ONLY IN LIGHT BLUE COLOURED CELLS.
Bidder's Name & Address alongwith GSTIN no. : To,
The Chief Engineer, Electricity, Tendering & procurement, KPTCL, 9th Floor, Indhana Bhavana, Bangalore - 560009.
We hereby offer an unconditional discount on our quoted price in Schedule 2 (1 of2) as under. Any discounts offered anywere else in Bid shall not be considered.
Sl.No Nature of Discount Establishing Sub station along with construction of associated Transmission Lines
Percentage of discount Amount (in Rs.) Remarks
I Supply Schedules
b) Freight & Insurance (Not Applicable)
II Erection Schedules
III Civil Works Schedules
Place Designation
Name of the Company
Karnataka Power Transmission Corporation Limited
SCHEDULE- 2 B - STATEMENT OF COMMERCIAL TERMS AND CONDITIONS
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Details of payments made in the form of Credit card/Debit card/NEFT/RTGS/OTC (over the counter) as per the tender conditions should be keyed in against column no.3 (a) . BG Amount, BG No. and date, Name and address of the bank issuing the BG, validity of the BG should be keyed in against column no. 3 (b) .
FILL ONLY IN LIGHT BLUE COLOURED CELLS.
Bidder's Name & Address alongwith GSTIN no. : To,
The Chief Engineer, Electy., Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana, BANGALORE - 560009
STATEMENT OF COMMERCIAL TERMS AND CONDITIONS
Sl. No. Particulars Details
1 Bid proposal form Uploaded.
2 No deviation certificate Uploaded.
3. a). EMD / Bid Security Bids shall be accompanied by bid security (EMD); 1) Up to Rs.1.00Lakh The following modes of payment will be provided as a part of e-Payment services. • Credit Card/Debit Card • Net Banking • NEFT/RTGS • Over-the-Counter (OTC) • IMPS For further detail regarding mode of e-payment of EMD in e-procurement platform, contact e-procurement cell, Government of Karnataka.
b). EMD amount above Rs.1.00Lakh by Bank Guarantee/Insurance Surety Bond (ISB)
4 Validity of the Bid.
5 Qualifying Requirements.
6 Financial capability
8 Taxes & Duties.
9 Completion Schedule
10 Defects Liability Period/Guarantee
11 Payment Terms
Place Designation
Name of the Company
Karnataka Power Transmission Corporation Limited
SCHEDULE - 3A(i) - Price Breakup for - Terminal Bay Supply portion
SHEET FOR TECHNO COMMERCIAL OPENING (Unpriced)
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bidder's Name & Address alongwith GSTIN no. :
The Chief Engineer, Electricity, Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana, Bangalore - 560009.
BIDDERS SHALL FILL ONLY IN THE LIGHT BLUE COLOURED CELLS.
Station Supply portion :
Sl No. Name of the Equipment/Materials Unit Tota Quantity Indicate "Own manufactured Item" or "Bought Out Item" Country Of Origin
UGCS1 66kV, 630sqmm XLPE UG Cable: 38/66 kV (Earthed), 1C X 630 Sq mm stranded,annealed, copper conductor, circular, conductor screen, cross linked polyethylene (XLPE) insulation,core screen, semi-conducting water swellable layer,lead alloy 'E' sheathed, semi-conducting bedding tapes, helically applied plain round copper wire screen, plain copper tape in open helix, water swellable tape with overall extruded high density polyethylene sheath coated with graphite/extruded semi conducting layer and anti-termite treated as per technical specification. (Total Length ((1.265*3*1.1)Kms = 4.175Kms)) Kms 4.17
UGCS2 Normal Straight through Joints suitable for 66kV(E) Single Core 630 sqmm, segmental compact type miliken copper conductor, XLPE, Lead sheathed cable complete with all accessories as per technical specification. Total 6+2(Mandatory Spares)=8Nos Note:Mandatory Spares to be handed over to KPTCL Stores Nos 8.00
UGCS3 Termination:Outdoor type cable end termination suitable for 66 kV, 1C X 630/240 Sq mm, copper conductor,XLPE insulated, lead sheathed cable as per technical specification. Total 6+3 No-Mandatory Spare=9 Nos. Note:Mandatory Spares to be handed over to KPTCL Stores Nos 9.00
UGCS4 66kV Link boxe: Three phase cross bonding Link box with SVL including 240 Sq mm sheath bonding cable and 240/240 Sq mm co-axial cable as per technical specification suitable for 110 kV & 66 kV,1000/ 630/400/240 Sq mm UG Cable to connect cable end termination to the Coyote/Drake ACSR conductor. The Link box shall be burried type, water proof (capable of immerssion in water), weather proof, rust & dust proof (IP: 68) Total 2+1(Mandatory Spare)=3Nos Note:Mandatory Spares to be handed over to KPTCL Stores. Nos 3.00
UGCS5 Terminal connectors to connect cable end termination to the Coyote / Drake ACSR conductor/Aluminum Rigid pipe (63mm nominal diameter X 73.03mm) heavy type with bolts & nuts and washers, complete. Nos 6.00
UGCS6 Fabrication and Supply of Galvanised66 kV D- Normal tower (CTT) with stub Excluding Bolts & Nuts-Leela Venture type Tower design- 2 Nos.(10.95 MT) t 10.95
UGCS7 Supply of Galvanised Bolts, Nuts & Washers etc., required for 66 kV D- Normal tower (CTT) with stub-Leela Venture type Tower design- 2 Nos.(10.95*5%=0.55MT) t 0.55
UGCS8 SURGE ARRESTOR : (Procelain housing) metal oxide, Gapless type as per Technical Specification. 03 Nos for CTT Nos. 6.00
UGCS9 Fibre Optic Approach cable 48 Fibre (DWSM) including Installation Hardware set for 48 Approach Cable Kms 1.27
UGCS10 UNDERGROUND FIBRE OPTIC UNARMOURED CABLE (UG - OFC) & ACCESSORIES: 48 Fibre Dual Window Mono Mode (DWMM) Optical Fibre Cable as per technical specification Kms 1.27
UGCS11 Polyvinyl Lubricated Bond (PLB/HDPE) pipe OD 40 mm Kms 1.27
UGCS12 UG-OFC to OPGW joint box Nos 2.00
UGCS13 Line Interface Unit for Optical Fibre Cable : 48F Nos 2.00
UGCS14 Tower Accessories: Number Plates No 2.00
UGCS15 Danger Boards No 2.00
UGCS16 Circuit plate No 2.00
UGCS17 Phase plate (Set of 6 per tower) Set 2.00
UGCS18 Grounding of tower with GI Pipe including the cost of GI pipe Set 2.00
NOTE 1. Any clarifications / hard copy of drawings can be obtained from the office of the Chief Engineer Electricity, Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana Bangalore.
2. Spacers shall be provided wherever necessary and no extra charges is payable on account of the same.
3. Supply of equipment/materials and the Erection charges shall include loading and unloading.
4. Copper Flat and GI Flat required for Power Transformers (if supply is in Bidder's scope) shall be supplied alongwith the Transformers and no extra cost is payable on this account.
5. The Bidder shall take necessary action to ensure that all the materials supplied shall be properly housed to ensure satisfactory commissioning.
6. The prices for all the materials shall be quoted in Itemwise Finanacial bid (on Percentage Rate Basis).
7. Released materials shall be transported to the nearest Major Works Store of KPTCL without any additional cost as per the directions of the Engineer in charge of the work.
8. The Bidder shall clearly indicate whether the materials/equipments are “Own manufactured” or “Bought out item”.
Name of the Company
Karnataka Power Transmission Corporation Limited
SCHEDULE - 3A(ii) - Price Breakup for - UG Cable Erection portion including Testing and Commissioning.
SHEET FOR TECHNO COMMERCIAL OPENING (Unpriced)
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bidder's Name & Address alongwith GSTIN no. :
BIDDERS SHALL FILL ONLY IN THE LIGHT BLUE COLOURED CELLS.
Station Erection portion including Testing and Commissioning:
Sl No. Name of the Equipment/Materials Unit Total Quantity
UGCE1 UG Cable Surveying: Detailed survey along the route alignemnet by using Modern Survey equipment like DGPS/Total Stations/Digital theodolites/ GPS including profiling by using computer aided techniques as detailed in the scope of work, includes the following: • Drawing the route profile including features like Roads, Railway lines, drains, park, gardens, P&T Lines, Railways crossing etc., • Preparation of cable route profile and final cable route alignment, marking lines and grades. • Leveling of the profile with reference to Survey of India bench marks (MSL). • Line Schedule along the Right of Way. • Soil resistivity along the selected route with measurement at a distance not exceeding 2 km. • Route marking along the route with GPS Co-ordinates at every 50 m duly marking road/power line/telecommunication/railway line crossings. • Making 150 mm dia bore holes for a depth not less than 3 m or refusal strata at every 50 m for soil classification along with GPS Co-ordinates for each bore holes and back filling of bore holes on completion of work. • Burgie details and providing GPS, Co-ordinates at every 50 m, turning points including permanent marks, like poles, telephones lines, buildings etc., • Submission of detailed consolidated final report for surveying work done appending all the reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos/videos taken at site and submitting soft copies of all documents and hard copy of reports in 6 sets. • The detailed report shall contain detailed Survey Report/Soil Resistivity Report/Line Schedule/Land schedule/Geo referenced and superimposed on the line corridor. Kms 1.265
UGCE2 Laying including Testing & commissioning of 1x630 sqmm 66kV, UG cable XLPE Copper cable in trefoil, tapping, fixing pipes for drain and gate crossing as per drawings & specifications in trench pipes, ducts by pulling, drawing etc., including transport, handling of cable drums, paving out cables using standard cable installation equipments as per directions of the engineer incharge. Note: One circuit consist of 3 Nos of single core cable and the quoted rate per Ckt Km shall include laying one circuit per Km each circuit consisting of 3nos. single core cable including transportaion of cable drums, materials, equipment to site etc., Ckt Km 1.39
UGCE3 Handling & making normal straight through joints for 66kV power cables with all consumables at site complete. Note: The scope also includes jointing opf OFC cable including accessories. Sets 6.00
UGCE4 Handling and making of cables end termination for 66kV single core 630sqmm XLPE copper cable. i) Outdoor type Note: The scope also includes termination of Optical Fiber cable including accessories upto the differential relay in the C&R Panel. Nos 6
UGCE5 Erection of Three Phase link boxes, on to the cable end termination structure by connecting earth leads with all lugs, fixtures, clamps, bolts, and nuts completely Nos 2
UGCE6 Supply and erection of earthing materials including cost of CI Pipe of 100mm ID 13mm thickness, 2.75mmtr long with 2 part clamp out of GI Flat 50x6mm continously welded alround the pipe using cast iron welding electrodes as per drawing including cost of excavation(All materials to be suppplied by contractor) (Grounding of equipments (LA's) ) Set 8
UGCE7 Erection of 66 kV D- Normal tower (CTT) with stub including Bolts & Nuts- Leela Venture type Tower design- 2 Nos. t 11.498
UGCE8 Erection of SURGE ARRESTOR : (Procelain housing) metal oxide, Gapless type as per Technical Specification. 03 Nos for CTT Nos. 6
UGCE9 Stub setting templates Setting of stub templates and aligning dismantling and transportation of templates from one location to another location for 66 kV Loc 2
UGCE10 Laying 48 fibre Single Mode, Unarmoured Under Ground optical fibre cable as per drawings & specifications in the cable trench parallel to 66kV cables inside PLB pipe by pulling, drawing etc, including transport, handling of cable drums, paving out cables using standard cable installation and as per directions of the Engineer incharge including fixing of joints to PLB pipe. Kms 1.273
UGCE11 Erection of Joint Box (48 Fiber) including Coiling bracket as per requirement for looping/coiling of 30 meters of cable as per technical requirement. No. 2
UGCE12 Erection of OFC end terminal (LIU suitable for 12F/24F/48F) No. 2
UGCE13 Tower Accessories: Supplying and fixing GI angle 450 x 450 mm 1Mtr length with cleats, bolts nuts as per specification and fixing above 0.5 mts length each at inner and outer surface of tower to facilitate running of barbed wire AC device Set 2
UGCE14 Supplying and fixing Barbed wire Rmtr 80
UGCE15 Number Plates No 2
UGCE16 Danger Boards No 2
UGCE17 Circuit plate No 2
UGCE18 Phase plate (Set of 6 per tower) Set 2.00
UGCE19 Grounding of tower with GI Pipe including the cost of GI pipe Set 2.00
1. Any clarifications / hard copy of drawings can be obtained from the office of the Chief Engineer Electricity, Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana Bangalore.
2. Released materials shall be transported to the nearest Major Works Store of KPTCL without any additional cost as per the directions of the Engineer in charge of the work.
3. The Erection charges shall include transportaion to site, loading and unloading.
Date Designation
Place Name of the Company
Karnataka Power Transmission Corporation Limited
SCHEDULE - 3B(i) - Price Breakup for - Cable Civil Portion SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB SCHEDULE - 3C(ii) - Price Breakup for -Line Civil Portion WorkB
SHEET FOR TECHNO COMMERCIAL OPENING (Unpriced)
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
BIDDERS SHALL NOTE: FILL ONLY IN LIGHT BLUE COLOURED CELLS
Bidders Name and Address along with GSTIN No.: To
The Chief Engineer, Electy., Tendering & Procurement, 9th Floor, Indhana Bhavana, KPTCL, A R Circle, BANGALORE - 560009.
Sl. No. Specifications Unit Quantity
D1 Earth work excavation for laying of UG cable in open ground and beneath the road surface in different strata of soil by mechanical means including deposition of earth on back with all leads and lifts including Shoring, Strutting, providing Caution Boards, Danger lighting , Bracing, Sheeting, Bailing out of water, Barricades and other works not specifically mentioned herein but required for the completion of work as per site condition in all respects and as per approved drawing. In all kind of soil for required depth. Cum 1103.67
D2 Earth work excavation for laying of UG cable in open ground and beneath the road surface in different strata of soil by mechanical means including deposition of earth on back with all leads and lifts including Shoring, Strutting, providing Caution Boards, Danger lighting , Bracing, Sheeting, Bailing out of water, Barricades and other works not specifically mentioned herein but required for the completion of work as per site condition in all respects and as per approved drawing. Ordinary/soft rock (without requiring blasting) for required depth. Cum 315.34
D3 Earth work excavation for laying of UG cable in open ground and beneath the road surface in different strata of soil by mechanical means including deposition of earth on back with all leads and lifts including Shoring, Strutting, providing Caution Boards, Danger lighting , Bracing, Sheeting, Bailing out of water, Barricades and other works not specifically mentioned herein but required for the completion of work as per site condition in all respects and as per approved drawing. Hard rock (blasting prohibited) for required depth. Cum 157.67
D4 Providing M-Sand : Supplying and filling in plinth, foundations / UG cable work with approved M-sand including watering, ramming, consolidating and dressing. The rate includes the cost of material, labour charges, required tools and plants etc., complete. Work shall be carried out as per the instructions of Engineer- in-charge of works as per the standard procedure. Cum 1079.94
D5 Supplying and Providing pre cast RCC Protection Covers using M20 grade Concrete, steel of approved size/shape (as per the approved drawings) to be laid in UG cable works. The rate includes the cost of material, labour charges, loading, unloading, handling, transportation charges, required tools and plants etc., complete. Work shall be carried out as per the instructions of Engineer-in-charge of works as per the standard procedure. Sqm 400.75
D6 Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications Cum 514.74
D7 Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work Cum 1061.94
D8 Supplying and Providing Pre cast Cable Route/ Joint marker using M15 grade Concrete, MS rods of approved size/shape (as per the approved drawings) to be laid in UG cable works. The rate includes the cost of material, labour charges, loading, unloading, handling, transportation charges, required tools and plants etc., complete. Work shall be carried out as per the instructions of Engineer-in-charge of works as per the standard procedure. No 13.00
D9 HDD method for laying of 110 kV and 66 kV UG Cables: Installation of 3 rows of HDPE pipes PE 80 PN6 of 160 mm dia using Horizontal directional drilling technique (HDD method) including preparing and setting up the plant and equipment, preparing and installation of new pipe work materials and commissioning system or making the system ready for commissioning by HDD operation including all excavation, shoring/strutting etc., drilling, stringing, ramming and pulling back the new work on the design bore path alignment, proper disposal of drilling fluid and restoration of site after completion etc., for HDD technique suiting Indian conditions in all types of soil. m 120.00
D10 Providing and laying of warning tape / Caution tape / detector tape for HDPE pipes of 200 mm wide, 300 micron thick, blue in colour confoming to relevant ISS with latest amendments with appurtenances., complete m 1265.00
D11 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m For JB Cum 62.44
D12 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. For JB Cum 60.00
D13 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates For JB Cum 4.92
D14 Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, form work, centering & scaffolding and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates - (3% cosidered for Form work) For JB Cum 18.48
D15 Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structures For JB kg 2539.04
D16 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m For CTT Cum 108.35
D17 Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite /trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates For CTT Cum 2.70
D18 Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, form work, centering & scaffolding and all the other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates for foundations For CTT Cum 47.94
D19 Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structures For CTT Kg 1520.20
Place Designation
Name of the company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SCHEDULE-5 COMMERCIAL DEVIATION
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Please fill Only in the Light Blue Couloured Cell.
Please key in the SlNo.,Section , Clause , Description as given in bid sheets and finally your Statement of Deviation/Variations.
This Sheet would be opened at the Techno-Commercial Opening. Please refer Vendor Manual attached for further details.
For any further assistance for submitting your bids please call up KPTCL Office.
We agree to provide all original Documents in support of the information provided for verification upon request. (Key in as YES in the space provided)
We understand that the electonic bid submitted by us is a valid offer in accordance with IT Act. (Key in as YES in the space provided)
We are fully aware of the electronic bid formalities and abide by the same. (Key in as YES in the space provided)
If you are not deviating from any of the clauses mentioned please key in as 'NO DEVIATION' in the space provided.
Bidder's Name & Address alongwith GSTIN no. :
TO, THE CHIEF ENGINEER (ELECTRICTICTY), TENDERING AND PROCUREMENT, KPTCL,9th Floor, Indhana Bhavana, BANGALORE-560009
I/we have read each of the Clauses mentioned in INVITATION FOR TENDERS , INSTRUCTION TO TENDERERS , CONDITIONS OF CONTRACT, SPECIAL CONDITIONS OF CONTRACT and COMMERCIAL TERMS AND CONDITIONS and all the sections of Bid documents.
The following are the commercial Deviations and Variations from and exceptions to the Specifications and documents for
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
These deviations and variations are exhaustive. Except these deviations, the entire work shall be performed as per your specifications and documents.
Sl. NO. SECTION CLAUSE NO. DESC. AS PER SPECIFICATION STATEMENT OF DEVIATIONS/VARIATIONS
Note : Deviations specified elsewhere in the specification will not be considered.
Place Designation
Name of the company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SCHEDULE-6 : TECHNICAL DEVIATION
SHEET FOR TECHNO-COMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Please key in the SlNo., Section , Clause , Description as given in Bid sheets and finally your Statement of Deviation/Variations.
This Sheet would be opened at the Techno-Commercial Opening.
For any further assistance for submitting your bids please call up KPTCL office. Please fill only in the blue coloured cells.
We agree to provide all original Documents in support of the information provided for verification upon request. (Key in as YES in the space provided)
We understand that the electonic bid submitted by us is a valid offer in accordance with IT Act. (Key in as YES in the space provided)
We are fully aware of the electronic bid formalities and abide by the same. (Key in as YES in the space provided)
If you are not deviating from any of the clauses mentioned please key in as 'NO DEVIATION' in the space provided.
Bidder's Name & Address alongwith GSTIN no. : TO,
THE CHIEF ENGINEER (ELECTRICTICTY), TENDERING AND PROCUREMENT, KPTCL,9th Floor, Indhana Bhavana, BANGALORE-560009
The following are the Technical Deviations and Variations from and exceptions to the Specifications and documents for
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
These deviations and variations are exhaustive.Except these deiviations and variations, the entire work shall be performed as per your specification and documents.
Sl. NO. SECTION CLAUSE NO. DESC. AS PER SPECIFICATION STATEMENT OF DEVIATIONS/VARIATIONS
Note : Deviations specified elsewhere in the specification will not be considered.
Place Designation
Name of the company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SCHEDULE 7(List of special tools and tackles )
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bidder's Name & Address alongwith GSTIN no. : TO,
THE CHIEF ENGINEER (ELECTRICTICTY), TENDERING AND PROCUREMENT, KPTCL,9th Floor, Indhana Bhavana, BANGALORE-560009
List of special tools and tackles the price of which is included in bid price.
Sl. No. For equipment Description of item Unit Quantity
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
NOTE: 1 ) SHALL BE UPLOADED WITHOUT PRICES
Bidder's Name & Address alongwith GSTIN no. : To,
The Chief Engineer, Electy., Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana, BANGALORE - 560009
We have uploaded with our proposal the following additional information.
Sl. No. Brief Description of information Ref. and Page No.
Place Designation
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SCHEDULE - 9 (1 of 5) : QUALIFYING REQUIREMENTS
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
BIDDER'S NAME AND ADDRESS: TO,
THE CHIEF ENGINEER (ELECTRICTICTY), TENDERING AND PROCUREMENT, KPTCL, 9th Floor, Indhana Bhavana, Bangalore - 560 009
a) * We have submitted bid as individual Bidder. (Key in Individual Bidder )
b) * We have submitted bid in Consortium with the following Bidders. (Key in Consortium )
Name of Consortium Partner Scope / Participation of each Consortium Partner
(* Fill-up whichever is applicable)
1.0 GENERAL INFORMATION
The Bidder, bidding for this package are requested to complete the information in the following form.
Sl. No. Particulars Bidder Details
1 Name of the Firm
2 Address of Head Office / Registered Office GST no.
5 Name of Contact person with Designation
6 Place of Incorporation/Registration
7 Year of Incorporation/Registration
8 Constitution or legal status of Tenderer [Upload copy]
9 Place of Registration [Upload copy]
10 Principal place of business
2.0 We are furnishing the following details/documents in support of Qualifying requirement for above mentioned project
Sl.No. Particulars For individual Bidder In case of Consortium :
Lead Bidder Consortium partner
(a) Written power of attorney of the signatory on the bid to commit the bidder.
1 Uploaded / Not
(b) Certificate of Registration of the Company. Please mention the date of incorporation of the company
1 Uploaded / Not
(c ) valid Super Grade Electrical Contractor's License issued by Govt. of Karnataka OR valid Form J-1 Verification Letter issued by Chief Electrical Inspectorate, Govt. of Karnataka to Other State Electrical Contractor License Holder for the highest system voltage specified in the tendered work OR valid Class-A/Class-1 Electrical Contractors License issued by any State/Central Government in India
1 Uploaded / Not
(d) Self declaration regarding Litigation w.r.t KPTCL contracts over the last five years (refer IFT)
1 Uploaded / Not
(e) Self declaration for ‘not being disqualified regarding non-performance in any of the Government utilities in the past five years’. (refer IFT)
1 Uploaded / Not
(f) An undertaking to source the supply of equipment/ material from KPTCL approved vendors only as per QR for Vendor registration, available in the KPTCL website ie., kptcl.karnataka.gov.in, Link Tendering & Procurement-Application for Vendor.
1 Uploaded / Not
(g) Self declaration regarding no action against the bidder have been taken by KPTCL in respect of Risk & Cost clause
1 Uploaded / Not
(h) Self declaration regarding 'Eligibility clauses in respect of restrictions on procurement from a bidder of a country which shares a land border with India as per Annexure-XVI
1 Uploaded / Not
(i) Self declaration regarding RESTRICTIONS ON SOURCING OF EQUIPMENTS/MATERIALS BY THE BIDDER FROM A VENDOR OF A COUNTRY WHICH SHARES A LAND BORDER WITH INDIA as per Annexure -XVII
1 Uploaded / Not
Section 3 : 1.3 Work performed of similar nature in the last Ten years of both Lead Bidder & Consortium partner (in case of Consortium) as per Clause No: 3.2 (b) (i) & (ii) of ITT
Project Name Name & Address of the Employer Description of Work Voltage class Number of Sub-Stations/TBs/Length of the Line Contract Number Value of contract Rs. Lakh Date of issue of work order Specified period of completion Actual date of commissioning Remarks explaining reasons for delay in commisioning of work
Name of Consortium Partner
Note : 1 . The documentary proof of fulfilling the qualifying requirements shall be uploaded along with the bid. (i) The bidder shall upload the P.O,LOI/LOA, DWA, Work done, Performance Certificates issued by the end users not below the rank of Executive/ Divisional Engineer along with the bid. (ii) The work experience of Bidders who have executed DCW works/ Self execution works under the supervision of KPTCL officers and the works executed for BMRCL/ KIADB/ BDA/KBJNL/IPP works/other Government or Public sector organizations will also be considered subject to fulfilling the stipulated qualifying requirements and uploading necessary documentary evidence
2. The qualifying experience of the Bidder and Consortium Partner(in case of Consortium) who is having qualifying experience shall be furnished in the above performa and Documentary Proof in support of above shall be uploaded in the form of certificates issued by authorized officers of concerned organisations.
3. IF this sheet is insufficient for furnishing the qualifying experience of the Bidder then similar sheets shall be seperately uploaded.
4. In case of work executed under a contract that had been awarded on a joint venture, the experience of individual joint venture partner shall be considered limited to the scope of that partner under the said contract. The copy of the agreement executed with awarding agency shall be uploaded as proof of the same
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SCHEDULE - 9 (2 of 5) : QUALIFYING REQUIREMENTS
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
BIDDER'S NAME AND ADDRESS: TO,
THE CHIEF ENGINEER (ELECTRICTICTY), TENDERING AND PROCUREMENT, KPTCL, 9th Floor, Indhana Bhavana, Bangalore - 560 009
Section 3 : 1.5 Information on works for which Tenders have been submitted and works which are yet to be completed as on the date of this Tender of a Bidder
(A) Existing commitments and on-going works:
Description of work Place & State Contract No & Date Name and Address of Employer Value of contract (Rs. Lakh) Stipulated period of cof Completion Value of works remaining to be completed ( Rs.Lakhs) (Attach Certificates from Engineers –in- Charge) Anticipated date of commissioning
Ex-Works GST Total (Ex-works + GST)
Name of the Lead Bidder
Name of the Consortium Partner
Note:Attach Certificates from Engineers –in- Charge
B)Works for which Tenders already submitted
Description of work Place & State Name and Address of Employer Estimated value of works (Rs. Lakh) Stipulated period of Completion Date when decision is expected Remarks if any
Ex-Works GST Total (Ex-works + GST)
Name of the Lead Bidder
Name of the Consortium Partner
i) The statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalent. OR The statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the works listed should be verified and certified by Chartered Accountant/ Cost Auditor. However, the Bidder has to upload the PO/Work Award copies for existing commitments and on-going works
ii) A self-declaration is to be uploaded by the Lead Bidder & Consortium partner (in case of Consortium) stating that "the information with regard to assessed available tender capacity (Works on Hand) furnished are correct
iii. Bidders shall furnish Certificate from Chartered Accountants for split details of Ex-works values and GST of Contract values of the works in the prescribed format as at Clause No. 1.5 of Section-3: Qualification Information by the Lead Bidder & Consortium partner (in case of Consortium)
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SCHEDULE - 9 (3 of 5) : QUALIFYING REQUIREMENTS
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
BIDDER'S NAME AND ADDRESS: TO,
THE CHIEF ENGINEER (ELECTRICTICTY), TENDERING AND PROCUREMENT, KPTCL, 9th Floor, Indhana Bhavana, Bangalore - 560 009
Following is the list of major supplied Substation equipments/accessories which are type tested and designed, manufactured by us in accordance with internationally recognised standards.
Sl. No. Item rating, type and Designation Qty Customer Date of Order Date of Supply Date of Commissioning Ref. of Cusomer's certificate of successful operation enclosed Ref. of layout & Customer's certificae for successful commission
Note: Documentary Proof in support of above shall be uploaded in the form of certificates issued by authorized officers of concerned organisations.
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SCHEDULE - 9 (4 of 5) : QUALIFYING REQUIREMENTS
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bidder's Name & Address alongwith GSTIN no. : To
The Chief Engineer, Electricity, Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana, Bangalore - 560 009
Section 3 : 1.7 Reports on the financial standing of the tenderer(Lead bidder & Consortium partner (in case of Consortium)) ,such as Profit and Loss Statements and Auditor’s reports in the preceeding last five years, Audited Financial statements i.e Balance sheets, P&L statements, Turnover certificates duly certified by chartered Accountant as documentary evidence shall be uploaded.
SLNo. Particulars Year Lead Bidder Consortium Member
Mention Year Turnover excluding GST (in Rs.) GST Amount (in Rs.) Mention Year Turnover excluding GST (in Rs.) GST Amount (in Rs.)
Names of the constituent Firm
1 Annual turn over for the last Five years Year(1) 2020-21 2020-21
2 Liquid Assets / Credit availability or access to evidence of assets
3 Whether Audited Balance sheets and Profit & Loss statement are enclosed for the last Five Years ? (yes/No)
4 Whether Bankers certificate enclosed for credit facilities? (Yes/No)
Note: Bidders shall furnish Certificate from Chartered Accountants for split details of financial Turnover and GST in the prescribed format (Annexure-XX) of tender document.
Place Designation
Name of the Company
Karnataka Power Transmission Corporation Limited
SCHEDULE - 9 (5 of 5) : QUALIFYING REQUIREMENTS
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
BIDDER'S NAME AND ADDRESS: TO,
THE CHIEF ENGINEER (ELECTRICTICTY), TENDERING AND PROCUREMENT, KPTCL, 9th Floor, Indhana Bhavana, Bangalore - 560 009
The information to be filled in by the Tenderer hereunder will be used for purposes of computing Tender capacity as provided for in Clause 3 of the Instructions to Tenderers. This information will not be incorporated in the Contract.
Lead Bidder Consortium partner Attach Copy
1.1 Constitution or legal status of Tenderer [Upload copy]
Place of Registration [Upload copy]
Principal place of business
Section - 3: 1.2 Total value of works executed (KPTCL & Non KPTCL works) and payments received in the last five years (in Rs. Lakhs) of both Lead Bidder & Consortium partner (in case of Consortium).
1.2 Total value of works executed (KPTCL & NON KPTCL works) and payments received in the last five years (in Rs. Lakhs) of both Lead Bidder & Consortium partner (in case of Consortium). Financial Year KPTCL works Non KPTCL works
Individual Bidder In case of Consortium Individual Bidder In case of Consortium
Total value of works in Rs. Lakh Lead Bidder Consortium Partner Total value of works in Rs. Lakh Lead Bidder Consortium Partner
Total value of works in Rs. Lakh Total value of works in Rs. Lakh Total value of works in Rs. Lakh Total value of works in Rs. Lakh
Note: Attach relevant Certificate/s from Chartered Accountant.
Section 3: 1.9 Name, address, telephone number & e-mail id of the Tenderers' bankers who may provide references if contacted by the Employer:
1.9 Sl.No Name, address, telephone number & e-mail id of the Tenderers' bankers
Section 3: 1.12 Information on litigations in which the Tenderer is involved:
Other Party(ies) Employer Details of Dispute Amount involved Remarks showing Present Status
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SCHEDULE-10 (1 of 3) Details of Tools and Plants available
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
BIDDER'S NAME AND ADDRESS: To
The Chief Engineer, Electricity, Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana, Bangalore - 560 009
Following are the details of the Tools and Plants available with us.
Sl. No. Description Quantity Make Present Location / Project Remarks (if any)
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SCHEDULE 10 (2 of 3) Details of Technical staff employed
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
BIDDER'S NAME AND ADDRESS: To
The Chief Engineer, Electricity, Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana, Bangalore - 560 009
Section 3: 1.8 Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
Sl. No. Name of the employee Designation Branch (Degree/Diploma) Year of Passing Since when employed in erection division Past Experience
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SCHEDULE 10 (3 of 3 )
SHEET FOR TECHNOCOMMERCIAL OPENING
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
BIDDER'S NAME AND ADDRESS: To
The Chief Engineer, Electricity, Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana, Bangalore - 560 009
We propose the following deployment of manpower for the substation and Line package.
Sl. No. Category MONTHS AFTER PLACEMENT OF AWARD LETTER
1 Project manager
2 Sr. Project Manager
5 Skilled labour
6 No skilled labour
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SCHEDULE-11 (A) : COMPLETION SCHEDULE FOR STATION/TERMINAL BAYS
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bidders Name and Address: To,
The Chief Engineer, Electricity, Tendering & procurement, KPTCL, 9th Floor, Indhana Bhavana, Bangalore - 560009
We hereby declare that following schedules shall be followed by us for the above work. The period of various activities from the date of placement of award letter shall be as follows
SL.NO Activity Period in Months for the work of Substations
Commencement Completion
1 Detailed engineering
2 Procurement of bought out items / raw materials
3 Manufacturing & Testing
5 Setting up of site office, Sheds & stores etc.
7 Concreting for
a)Structure Foundations
b)Equipment and mounting structure foundadions
c)Cable trenches
2. Installation
8 Receipt(at site) of
a)Main equipment / spares
c)Insulators & Hardwares
d)Clamps & Connectors
e)Marshalling kiosks
f)Cables & Cabling Materials
a)Main structures
b)Equipment support structures
10 Equipment Erection
12 Bus bar erection
15 Completion of testing and ready for commissioning
16 Commissioning
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SCHEDULE-11B : COMPLETION SCHEDULE FOR TRANSMISSION LINES
SHEET FOR TECHNOCOMMERCIAL OPENING
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Bidders Name and Address: To,
The Chief Engineer, Electricity, Tendering & procurement, KPTCL, 9th Floor, Indhana Bhavana, Bangalore - 560009
We hereby declare that following shedules shall be followed by us for the above work. The period of various activities from the date of placement of award letter shall be as follows.
SL.NO Activity Period in months for work of Construction of Transmission Lines
Commencement Completion
1 Submission of Drawings
2 Completion of detailed engineering
3 Commencement of Manufacturing
4 Completion of Manufacturing
5 Readiness for testing
6 Readiness for Shipment
7 Receipt at Site
8 Completion of Shipment
1 Detailed Survey
2 Setting up of site office, sheds and stores etc.
3 Exacavation for foundations.
4 Foundations and other Civil Works
5 Erection of Tower alongwith accessories
6 Stringing of conductor/ groundwire alongwith accessories
7 Testing , Commissioning and Handing over.
Place Designation
Name of the Company
Karnataka Power Transmission Corporation Limited
SCHEDULE - 12 TYPE TESTS & TEST CHARGES OF EQUIPMENT/MATERIALS
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
BIDDERS SHALL INDICATE VARIOUS TYPE TESTS IN LIGHT BLUE COLOURED CELLS
ALL THE TYPE TESTS APPLICABLE FOR EACH OF THE EQUIPMENTS SHALL BE INCLUDED.
Bidders Name and Address To,
The Chief Engineer, Electricity, Tendering & procurement, KPTCL, 9th Floor, Indhana Bhavana, Bangalore - 560009
SL.No Details of Equipments Type Test Test Charges ( in Rs )
1 66kV GIS Equipments (40KA rating):
a) 66kV line (UG Cable) Module
b) Bus Maintenance earth switch 3 Phase, Single pole
c) 66kV SF6 duct
d) 66kV SF6/Air Bushing
2 Relay & Protection Panels
3 1.1KV Copper control cables/LT Power Cable
4 PLCC equipment
5 Conductors & Earth Wire a) Drake ACSR
6 Station / Mounting Structures/Lightning Mask
7 66kV UG Cable
8 66kV UG Cable & accessories
NOTE: The Type Test / Special Tests, if repeated at the insistance of owner, the applicable testing charges shall be paid by the successful Bidder upfront to the laboratory and the same shall be reimbursable by KPTCL as per actuals on submission of Bills along with proof of payment and on successful completion of all the Type Tests, specified and on approval of the same by the owner. In case equipment/material fails in the type tests during testing then the testing charges paid by the Bidder to the laboratory will not be reimbursed by KPTCL. The above Clause is applicable for all the equipments/materials, in case, the Type Test / Special Tests, are repeated at the insistance of owner(KPTCL).
Place Printed Name
Karnataka Power Transmission Corporation Limited
Schedule -13-List of Optional Spares
SHEET FOR TECHNOCOMMERCIAL OPENING
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
BIDDERS SHALL NOTE THAT QUANTITIES INDICATED IN THE on Item-Wise Financial Bid (on Percentage rate basis) OFFER SHALL BE INDICATED HERE ALSO.
Bidders Name and Address
To, The Chief Engineer, Electricity, Tendering & Procurement, KPTCL, Bangalore - 09.
List of optional spares required to meet the specified performance for a period of three years
Sl. No. For Equipments Details of item Unit Quantity
Place Designation
Name of the Company
Karnataka Power Transmission Corporation Limited
SCHEDULE - 14-Guaranteed Losses :
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bidders Name and Address along with GSTIN No.: To,
The Chief Engineer, Electy., Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana, BANGALORE - 560009
Dear Sir, i) We Declare that the ratings and performance figures of the transformer furnished by us under the Turnkey Package are Guaranteed. We further declare that in the event of any deficiencies in meeting the guarantees in repect of the characteristics mentioned below as established after conducting the factory test, you may at your discretion,reject or accept the equipment after assessing the liquidated damages as specified in relevant clause of Bid Document.
For 66kV 1000Sqmm UG Cable
Sl.No. PARTICULARS Guaranteed Values Remarks
1 Size of the Cable 66kV, 630 Sq. mm
2 Losses per Km [Refer clause No. 21.4 (Guaranteed Loss) of SCC, Volume I]
a) a) Total 3 Phase Dielectric Loss at rated voltage and rated current
i. One Circuit alive KW/KM
ii. Both Circuits alive KW/KM .
b) b) Total 3 Phase Copper Loss at rated voltage and rated current(650A). Note: The AC resistance of conductor (Rac), at the said rated continuous current(800A) in ground shall be considered for calculation of copper losses. The corresponding temperature at rated continuous current(800A) in ground shall also be indicated.
i. One Circuit alive KW/KM
ii.Both Circuits alive KW/KM
c) c) Total 3 Phase sheath / screen loss at rated voltage & rated current
i. One Circuit alive KW/KM
ii.Both Circuits alive KW/KM
d) d) Other losses due to reinforcement
i. One Circuit alive KW/KM
ii.Both Circuits alive KW/KM
e) e) Total Losses at rated voltage & rated current
i. One Circuit alive KW/KM
ii.Both Circuits alive KW/KM
3 Guaranteed Weights
a) Nominal (guaranteed) Weight of copper in MT/Km
b) Nominal (guaranteed) Weight of Lead in MT/Km
Note: The Guaranteed Values indicated in this Sheet, shall be same as that of Guaranteed Technical Particulars uploaded as in DRS
Place Designation
Name of the Company
Karnataka Power Transmission Corporation Limited
LIST OF VENDORS
SHEET FOR TECHNOCOMMERCIAL OPENING
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
BIDDERS NAME AND ADDRESS To, The Chief Engineer, Electricity, Tendering & Procurement, KPTCL, Bangalore - 09.
Sl. No. EQUIPMENT/ MATERIAL NAME OF THE VENDOR
VENDOR 1 VENDOR 2 VENDOR 3 VENDOR 4
2 UG cable accessories
5 Hardware Materials
6 Aluminium pipe and Clamps
Name of the Company
SCHEDULE-16 : NO DEVIATION CERTIFICATE (ANNEXURE-I)
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
NOTE: SCHEDULE DULY SIGNED BY THE AUTHORIZED PERSON SHALL BE UPLOADED
With reference to our Bid Proposal No dated
We hereby confirm that we have read the provisions of the contract, the stipulation of these clause are acceptable to us,
and we have not taken any deviation whatsoever to these clauses:
a) Terms of payment Clause No. 37 of Section-5,Conditions of Contract (CC) and Clause No.8 of Special Conditions of Contrac (SCC)
b) EMD/Bid Security Clause No. 6, Section :1, Invitation for Tenders (IFT) and Clause No. 13, Section :2, Instruction to Tenderer (ITT)
c) Contract Performance Guarantee Clause No. 29 of Section:2, Instruction to Tenderers (ITT).
d) Penalty for delay Clause No. 41 of Section-5 : Conditions of Contract (CC).
e) Price Basis/ Price adjustment Clause No. 40 of Section-5 :Conditions of Contract (CC).
f) Defects Liability Period/Guarantee Clause No. 10 of Section-5 Special Conditions of Contract (SCC)
g) Work Schedule Clause No.17 of Section:5 Conditions of Contract (CC)
h) Taxes and Duties Clause No. 11.11 of Section-2: Instruction to Tenderers (ITT).
We further confirm that any deviation to the above clauses at SI.No. (a) to (h) found anywhere in our bid proposal, implicit or explicit, shall stand unconditionally withdrawn, without any cost, implication whatsoever to KPTCL.
Place Designation
Name of the Company
Karnataka Power Transmission Corporation Limited
SCHEDULE-17a FORM FOR BID SECURITY/EMD (ANNEXURE-IIA) (To be stamped on Rs.300/- Non-Judicial stamp paper in accordance with KPTCL Circular No. KPTCL/GMT/CIVIL (B7)/35/2024-MANAGER ESTATE (E-106992) dated 02.03.2024)
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
NOTE: SCHEDULE DULY SIGNED BY THE AUTHORIZED PERSON SHALL BE UPLOADED AND SENT ALONG WITH ORIGINAL BANK GUARANTEE AND ORIGINAL DD (TOWARDS BID GUARANTEE ) TO CHIEF ENGINEER ELECTRICIYT (T&P),KPTCL BANGALORE SO AS TO REACH AFTER THE LAST SUBMISSION DATE & ON OR BEFORE THE DATE & TIME OF OPENING TECHNO COMMERCIAL BIDS.
Ref No. Bank Guarantee No.
In accordance with Invitation to Bid under your specification
No. M/s having its Registered /
Head Office at (hereinafter called the 'Bidder') wish
to participate in the said Bid or and you, as a special favour have agreed
to accept an irrevocable and unconditional bank guarantee for an amount of
valid up to on behalf of Bidder in lieu of the Bid deposit required to be made
by the Bidder as a condition predecent for participation in the said Bid,in addition to the Demand draft No.
we the Bank at having our Head office at
(local address) guarantee and undertake to pay immediately on demand by Karnataka Power Transmission Corporation
the amount of (in figures and words)
without any reservation, protest, demur and recourse. Any such demand made by said `Owner' shall be conclusive and binding on us irrespective of any dispute or difference raised by the Bidder.
This Guarantee shall be irrevocable and shall remain valid up to and including
If any further extension of this guarantee is required, the same shall be extended to such required period (not exceeding one year) on receiving instructions
from M/s on whose behalf this guarantee is issued.
This Guarantee has been issued using SFMS Platform and the requisite communication in this regard has been forwarded to the Beneficiary Bank.
In witness whereof the Bank, through its authorised officer, has set its hand and stamp on this
Signature Signature
Official Addressess Designation with Bank Stamp.
Attorney as per Power of Attorney No.
Note : 1) Both the Bank Guarantee and Demand Draft shall be scanned and uploaded along with Electronic sheets. 2) This date shall be Forty Five (45) days after the last date for which the bid is valid.
Karnataka Power Transmission Corporation Limited
SCHEDULE-17b Form of Insurance Surety Bond towards EMD (ANNEXURE-IIB) (To be stamped on Rs.300/- Non-Judicial stamp paper in accordance with KPTCL Circular No. KPTCL/GMT/CIVIL (B7)/35/2024-MANAGER ESTATE (E-106992) dated 02.03.2024)
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Insurance Surety Bond No.
In accordance with Invitation for Bids under your Bid Document No
M/s having its Registered /
Head Office at (hereinafter called the 'Contractor') wish
to participate in the said Bid for
As an irrevocable Insurance Surety Bond against Bid Security for an amount of * valid for days from **
required to be submitted by the Contractor as a condition precedent for participation in the said bid which amount is liable to be forfeited on the happening of any contingencies as mentioned under the Bidding Documents.
we, the having our Head office at
guarantee and undertake to pay immediately on demand by Karnataka Power Transmission Corporation Limited, (hereinafter called the 'Owner') the amount of
without any reservation, protest, demand and recourse. Any such demand made by the 'Owner' shall be conclusive and binding on us irrespective
of any dispute or difference raised by the Contractor and/or any right/remedy available to the Contractor in terms thereof.
This Insurance Surety Bond shall be unconditional as well as irrevocable and shall remain valid upto
If any further extension of this Insurance Surety Bond is required, the same shall be extended to such required period (not exceeding one year) on receiving instructions from
M/s on whose behalf this Insurance Surety Bond is issued.
In witness where of the Insurer, through its authorised officer, has set its hand and stamp on this
Signature Signature
Official Addressess Designation with Insurer Stamp
Attorney as per Power of Attorney No.
NOTE: 1. (*) The amount shall be as specified in the SPC. (**) This shall be the last date of bid submission deadline. (@) This date shall be Forty Five (45) days after the last date for which the bid is valid 2. The Insurance Surety Bond shall be from an Insurer as per guidelines issued by Insurance Regulatory and Development Authority of India (IRDAI) as amended from time to time. 3. The Owner shall be the Creditor, the Contractor shall be the Principal debtor and the Insurance company/Insurer shall be the Surety in respect of the Insurance Surety Bond to be issued by the Insurer. 4. The Insurance Surety Bond should be on Non-Judicial stamp paper/e-stamp paper of appropriate value as per Stamp Act prevailing in the state(s) where the Insurance Surety Bond is submitted or is to be acted upon or the rate prevailing in State where the Insurance Surety Bond is executed, whichever is higher. The Stamp Paper/e- stamp paper shall be purchased in the name of Contractor /Insurer issuing the Insurance Surety Bond. 5. While getting the Insurance Surety Bond issued, Contractors are required to ensure compliance to the points mentioned in Form of Bank Guarantee/Insurance Surety Bond Verification Check List enclosed in this Section of Bidding Documents. Further, Contractors are required to fill up this Form and enclose the same with the Insurance Surety Bond.
Karnataka Power Transmission Corporation Limited
SCHEDULE-18 PROFORMA OF LETTER OF UNDERTAKINGS (ANNEXURE-V)
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
NOTE: SCHEDULE DULY SIGNED BY THE AUTHORIZED PERSON SHALL BE UPLOADED
(To be executed on Non-Judicial paper of RequisiteValue)
1. I*/We* have read and examined the following bid documents relating to the
(full Scope of Work)
a) Notice Inviitng Tender
b) Conditions of Contract containing section 'Invitation for Tenders’, 'Instructions to Tenderers’, ‘Conditions of Contract’ and Contract Data.
c) Special Conditions of Contract along with Annexure to
d) Drawings No.
e) Technical Specifications
2 . I / We hereby submit our Bid and undertake to keep our Bid Valid for a period of One Hundred and Eighty days (180 days) from the Last date of bid submission as notified (either original or extended). I*/We* hereby further undertake that during said period I/We shall not vary/alter or revoke my/our Bid.
This undertaking is in consideration of KPTCL agreeing to open my/ our Bid and consider and evaluate the same for the purpose of award of Work in terms of provisions of clause entitled "Award of Construct" 'cl.no. 26 of Section ITT and cl.no. 18 of SCC of the Bid Documents.
Should this bid be accepted, I*/We* also agree to abide by and fulfil all the terms, conditions of provision of the above mentioned bid.
Signature along with Seal of Co.
(Duly Authorised to sign the Tender on Behalf of the Contractor.)
NAME OF THE COMPANY (in Block Letters)
SIGNATURE Date and Postal Address
DATE Telegraphic Address
NAME AND ADDRESS Telephone No.
Karnataka Power Transmission Corporation Limited
SCHEDULE-19 CONSORTIUM AGREEMENT (To be stamped on Rs.500/- Non Judicial stamp paper in accordance with KPTCL Circular No. KPTCL/GMT/CIVIL(B7)/35/2024-MANAGER ESTATE (E-106992) dated 02.03.2024) (ANNEXURE -XIII)
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
NOTE: SCHEDULE DULY SIGNED BY THE AUTHORIZED PERSON SHALL BE UPLOADED.
CONSORTIUM AGREEMENT AMONGST M/s M/s
For Bid Specification No. OF KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
This consortium agreement executed on this day Month of Two thousand Twenty Three
amongst M/s a company incorporated under the laws of (Country) and having its registered office at
(hereinafter called the "Lead Company" which expression shall include its successors ,executors and permitted assigns),
M/s a company incorporated under the laws of (Country) and having its registered office at
(hereinafter called the "Constituent Company" which expressions shall include its successors,executors and permitted assigns)
for the purpose of making a bid and entering into a contract (In case of award) against the specification no.
For NAME OF THE WORK
for Karnataka Power Transmission Corporation Ltd. having its registered office at 9th Floor, Indhana Bhavana , Bangalore 560 009 , Karnataka (hereinafter called the "Owner"). The leader of the consortium shall abide by the general terms and conditions specified by the Purchaser. WHEREAS the Owner invited bids as per the above mentioned specifications for the design, manufacture, supply and erection, testing and commissioning of Equipments/Materials stipulated in the bidding documents under subject package
NAME OF THE WORK
AND WHEREAS Section-I ( Volume-1: Clause No. 11:- Qualifying Requirement), forming part of the bidding documents, stipulates that a consortium meeting the requirements of Section-I, ( Invitation of Bid) applicable may bid, provided the Consortium fulfills all other requirements of specification and in such a case, the Bid shall be signed by the members so as to legally bind the members and who will be jointly and severally liable to perform the Contract and all obligations hereunder.
The above clause further states that the consortium agreement shall be attached to the bid and the contract performance guarantee will be as per the format enclosed with the bidding document without any restriction or liability for either party.
AND WHEREAS the bid has been submitted to the Owner vide proposal No dated
by Lead Company based on the Constituent agreement between all the consortium under these presents and the bid in accordance with the requirements of Specifications (Qualification Requirements).
NOW THEREFORE THIS UNDERTAKING WITNESSETH AS UNDER:
In consideration of the above premises and agreements all the partners to this consortium members do hereby now agree as follows:
1 In Consideration of the award of the Contract by the Owner to the Consortium members, we , the members to the consortium agreement do hereby agree that M/s
shall act as Lead Company and further declare and confirm that we shall jointly and severally be bound up to the Owner for the successful performance of the contract and shall be fully responsible for the design, manufacture, supply and successful performance of the equipments in accordance with the Contract.
2 In case of any breach of the said contract by the Lead company or other constituent of the Consortium agreement, the Lead company do hereby agree to be fully responsible for the successful performance of the contract and to carryout all the obligations and responsibilities under the contract in accordance with the requirements of the Contract
3 Further, if the Owner suffers any loss or damage on account of any breach in the contract or any shortfall in the performance of the equipment in meeting the performance guaranteed as per the specification in terms of the contract, the Lead company of these presents undertake to promptly make good such loss or damages caused to the Owner, on its demand without any demur. It shall not be necessary or obligatory for the Owner to proceed against Lead Partner to these presents before proceeding against or dealing with the other Partner (s).
4 The Financial liability of the members of the consortium agreement to the Owner, with respect to any of the claims arising out of performance or non-performance of the obligations set forth in the said agreement, read in conjunction with the relevant conditions of the contract shall, however not be limited in any way so as to restrict or limit the liabilities of any of the members of the agreement.
5 It is expressly understood and agreed between the members to this consortium agreement that the responsibilities and obligations of each of the partners shall be as delineated hereunder (To be incorporated suitably by the member to this agreement). However, each member of the consortium will be severally and jointly responsible for the faithful performance of the contract. It is further agreed by the member that the above sharing of responsibilities and obligations shall not in any way be a limitation of joint and several responsibilities of the members under this contract.
Sl.No. Name of the Lead Bidder/Consortium Partner. Scope of the work/Participation
We further declare ourselves bound to execute our scope of work/participation as stated above;
6 This Consortium agreement shall be constructed and interpreted in accordance with the laws of India and the courts of Bangalore shall have the exclusive jurisdiction in all matters arising there under.
7 In case of an award of a Contract, we the Consortium members do hereby agree that we shall be jointly & severally responsible for the works respectively executed and Lead company shall furnishing a contract performance security from a bank in favor of the PURCHASER in the forms acceptable to purchaser for value of Five percent (5%) of the Amount put to tender (Excluding GST) plus additional security for unbalanced tenders in accordance with Clause 25.5 & 29 of ITT and Clause 43 of the CC (Conditions of Contract).
8 It is further agreed that the Consortium agreement shall be irrevocable and shall form an integral part of the contract, and shall continue to be enforceable till the owner discharges the same. It shall be effective from the date first mentioned above for all purposes and intents.
IN WITNESS WHEREOF the partners to the Consortium have through their authorized representatives executed these presents and affixed Common seals of their companies, on the day, month and year first mentioned above.
WITNESS for Lead Company
(Signature) (Signature of the authorized representative)
(Name in Block Letters) (Name)
Designation (Designation)
Common Seal of the Company
2 ( For Constituent 1)
(Signature of the authorized representative)
(Name in Block Letters) (Name)
Designation Common Seal of the Company
Karnataka Power Transmission Corporation Limited
SCHEDULE-20(a) POWER OF ATTORNEY (ANNEXURE-XI)
(For Individual Bidder / Lead Partner of Consortium)
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
NOTE: SCHEDULE DULY SIGNED BY THE AUTHORIZED PERSON SHALL BE UPLOADED.
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS that we
a Company incorporated
under the laws of
and having its Registered Office / Head Office at
"Manufacturer / Bidder" which expression shall unless repugnant to the
Context or meanig thereof, include its successors, administrators and assigns)
acting through Mr its constitute, nominate and appoint
M/s a Company incorporated under the laws of
and having its Registered / Head Office at
as its duly constituted lawful Attorney (hereinafter called "Attorney"
or "Authorized Representative") to exercise all or any of the powers for and on
behalf of the "Manufacturer / Bidder" in regard to Specification No.
the bids for which have been invited by
(Address "Owner") to undertake the following acts:
i. To submit proposal and participate in the aforesaid Bid Specification of the Owner on behalf of the "Manufacturer / Bidder".
ii. To negotiate with the "Owner" the terms and conditions including price for award of the contract pursuant to the aforesaid Bid and to sign the contract with the "Owner" for and on behalf of the Manufacturer / Bidder.
iii. To receive accept and execute the contract for and on behalf of the "Manufacturer / Bidder".
iv. To do any other act or submit any document related to the above.
It is expressly understood that the Power of Attorney shall remain valid, binding and irrecoverable till submission of the Contract performance guarantee in terms of the Contract. The "Manufacturer / Bidder" hereby agrees and undertakes to ratify and confirm all the whatsoever the said "Attorney" / "Authorised Representative" quotes in the Bid, negotiates and signs the contract with the "Owner" and / or purports to act on behalf of the "Manufacturer / Bidder" by virtue of this Power of Attorney and the same shall bind the "Manufacturer / Bidder" as if done by itself.
IN WITNESS WHEREOF THE "Manufacturer / Bidder" has executed these presents at
on this day of under
the Common Seal of the Manufacturer company / Bidder.
Specimen Signature of Attorney Holder
(Name & Designation)
For and on behalf of
Common Seal of the above Manufacturer/Bidder
Has been affixed thereto in the presence of :
Karnataka Power Transmission Corporation Limited
SHEET FOR TECHNOCOMMERCIAL OPENING (UN - PRICED)
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
Bidders Name and Address
To, The Chief Engineer, Electricity, Tendering & Procurement, KPTCL, Bangalore - 09.
We Declare that the ratings and performance figures of the equipment furnished by us under the Turnkey Package are Guaranteed. We further declare that in the event of any deficiencies in meeting the guarantees in repect of the characteristics as established after conducting the performance test, you may at your discretion, reject the equipment, in which case we shall replace the same with equipment as per specification and meeting the guarantee, free of charge and within a resonable time, to be mutually agreed.
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
SCHEDULE -22 - Check List
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
BIDDERS NAME AND ADDRESS To,
The Chief Engineer, Electy., Tendering & Procurement, KPTCL, 9th Floor, Indhana Bhavana, BANGALORE - 560009
CHECK LIST FOR SUBMISSION OF SCHEDULES
REFERENCE OF FORM & SCHEDULE DETAILS OF FORM & SCHEDULE WHETHER INCLUDED IN TECHNO-COMMERCIAL SHEETS (ELECTRONIC) YES/NO WHETHER INCLUDED IN Item-Wise Financial Bid (on Percentage rate basis) (ELECTRONIC) YES/NO WHETHER INCLUDED IN COMMERCIAL
PROPOSAL BID PROPOSAL
Schedule - 1 PRICE COMPONENTS
Schedule 2 (1 of 2 & 2 of 2) Summary of Price Components
Schedule 2A Schedule of Discounts
Schedule 2B Statement of Commercial Terms & Conditions
Schedule 3A & 3B Price break up for supply & erection
Schedule 3C Price break up for civil works
Schedule 4 Price break up for mandatory spares and maintenance & Testing Equipments.
Schedule 5 Commercial deviations
Schedule 6 Technical deviations
Schedule 7 List of special Tools & Tackles
Schedule 8 Additional information.
Schedule 9 Qualification Information [Technical & Financial]
Schedule 10 Details of Tools and plants and man power deployment
Schedule 11 A & 11B Schedule for activities & Commissioning.
Schedule 12 Type Test Charges
Schedule 13 List of optional spares and cost.
Schedule 14 Guaranteed loss of transformer.
Schedule 15 List of vendors.
Schedule 16 Annexure 'A' No deviation certificate
Schedule 17a & 17b Proforma for Bid guarantee
Schedule 18 Proforma for letter of undertaking
Schedule 19 Consortium Agreement Void
Schedule 20a Power of attorney for Bidder
Schedule 21 Guaranteed Declaration
Schedule 22 Check list
DRS 1-45 Relevant Technical details for Materials / Equipments
To be Uploaded Contract Quality Assurance Programme
To be Uploaded Type Test Certificates
To be Uploaded & furnished Bid Security/EMD
To be Uploaded Written Power of Attorney
To be Uploaded Letter of Undertaking
To be Uploaded No Deviation Certificate
To be Uploaded Any Other (Please Specify)
To be Uploaded Any Other (Please Specify)
To be Uploaded Any Other (Please Specify)
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
GUARANTEED TECHNICAL PARTICULARS FOR 66 KV 630sqmm UG Cable
Sl.No. PARTICULARS
1 Name of the Manufacturer
2 Country of Manufacture
3 Type of cable / cable code
4 Applicable standard
a. Rated Nominal voltage
b) Rated Maximum voltage
6 Continuous Current carrying capacity in Amps (Calculation to be shown seperately)
7 Permissible voltage & frequency variation for satisfactory operation
8 Type of process of manufacturing of cable
a) Triple extrusion (Yes/No)
b) Whether VCV method/CCV method/Any other method
9 Suitability for :
a. Earthed system
b. Unearthed system
a) Nominal cross section (sq.mm)
d) Diameter of conductor (mm)
e) Number of wires per conductor (Nos.)
f) Nominal diameter of wire in conductor (mm)
11 Conductor screen
a) Material and type
b) Thickness (mm)
c) Maximum volume resistivity at 90 ± 2°C before and after ageing (ohm-cm)
12 Maximum value of Electric stress at
a) Conductor screen kV/mm
b) At the insulation kV/mm (Calculation to be shown separately)
13 Insulation XLPE
a) Curing process (furnish details separately)
b) Material/Composition
c) Dia over insulation
d) Radial thickness
i. Nominal (mm)
ii. Average (mm)
iii. Minimum (mm)
iv) t max-t min ≤ 0.15 t max
e) Specified insulation resistance at 90°C
f) Insulation resistance at 20°C
14 Insulation screen (Non metallic)
b) Nominal thickness (mm)
c) Maximum volume resistivity at 90 ± 2°C . (ohm-cm)
d) Maximum dielectric stress (Calculation to be provided)
15 Tape swellable (Longitudinal water / Moisture / Protection)
b) Thickness (mm)
16 Radial Water Barrier (Lead Sheath)
a) Type / composition
c) Nominal thickness
d) Tolerance on thickness
e) Diameter of cable over metallic sheath (mm)
17 Bedding Tape over Inner sheath
ii) Dimension (Wxt) (mm) x (mm)
18 Concentric screen / Plain Copper Wires
b) Dia of copper wire
19 Binder open Helix, contact copper Tape over screen / Armour wires
b) Dimension (Wxt)
20 Non-woven water swellable Tape over Binder Tape
21 Overall sheath
i) Material & Type
22 Conductive coating on outer sheath
23 Anti-termite treatment to outer sheath
24 External overall dia of cable
25 Weight of Cable /M (Kgs)
26 Short circuit rating of conductor 90°C operating temperature for 1 Sec.
27 a) Minimum cable bending radius (in terms of cable diameter)
b) Recommended minimum installation radius
28 Permissible maximum tension
29 Continuous current rating under specified installation conditions at conductor temperature of 65°C and 90°C
Ground Temperature 30°C
Thermal resistivity of soil 150°C CM/W
Depth of laying 1500 mm
Ambient Air temperature 50°C
No. of circuits 1 OR 2
Spacing between two circuits (600 mm)
Formation Trefoil Touching
Single Point / cross Bonded Both End Bonded
65 deg. C Amps 90 deg. C Amps 65 deg. C Amps 90 deg. C Amps
Current Rating conductor size 630 Sq. mm
a) In Ground /Trench
i. of each circuits (when both the circuits alive)
ii. of one circuits (when other Circuit is isolated)
i. of each circuits (when both the circuits alive)
ii. of one circuits (when other Circuit is isolated)
c) In HDPE ( 160mm dia) pipe, one cable per pipe.
i. of each circuits (when both the circuits alive)
ii. of one circuits (when other Circuit is isolated)
i. of each circuits (when both the circuits alive)
ii. of one circuits (when other Circuit is isolated)
30 Maximum permissible conductror temperature for continuous operation under specified installation conditions (deg. C)
31 Conductor temperature at rated current (deg. C)
32 Temperature rise for 20% over current
33 Emergency overload rating
34 Basic impulse level at conductor temperature of 90 deg. C (KV)
35 Impulse wave shape
36 Power frequency with stand voltage (KV)
37 Tan Delta at 50 Hz (at Uo kV and 90 (-5/+10) deg. C
38 Sheath voltage at max. load single : Point bonded, trefoil touching ( both circuits alive) V/KM
39 Withstand voltage of sheath on spark test
40 Permissible short circuit current ratings of conductor
iii) 0.5 Sec KA
41 Conductor resistance DC & AC
a) at 20 deg. C (d.c)/A.C. ohm/KM
b) at 90 deg. C (d.c)/A.C. ohm/KM
c) at 105 deg. C (d.c)/A.C. ohm/KM (over load temp) a.c. (ohm)
42 Equivalent star resistance at 50 Hz of 3 phase current
a) at 20 deg. C ohm/KM
b) at 90 deg. C ohm/KM
c) at 10% continuous overload temperature (ohm/KM)
43 Star reactance at 50 hz (ohm/KM)
44 Approximate impedance at 50 hz per KM
a) at 20 deg. C ohm/KM
b) at 90 deg. C ohm/KM
c) at 10% continuous overload temperature (ohm/KM)
45 Self electrostatic capacitance per phase (Micro farad/KM)
46 Maximum power factor at charging KVA of cables when laid direct in ground at normal voltage & frequency
a) at ambient Temperature
b) at Maximum conductor Temperature
47 a) Positive and negative sequence impedance (ohm/KM)
b) Zero sequence impedance (ohm/KM)
48 Zero sequence data
a) Series resistance (ohm/KM)
b) Series reactance (ohm/KM)
c) Shunt capacitive reactance (ohm/KM)
49 Sheath voltage under maximum operating conditions asseming all circuits comected KV/KM
50 a) Sheath resistance at 20 deg. C ohm/KM
b) Screen resistance at 20 deg. C ohm/KM
c) Combined resistance at 20 deg. C ohm/KM
51 Surge impedance of cable (ohm/KM)
52 IR value at ambient temperature per KM
53 Maximum magnitude of partial discharge at 1.5 Uo.
At Ambient Temperature (Pc)
At High Temperature (Pc)
54 Dielectric dissipation factor at rated voltage
55 Guaranteed Losses per Km (Calculation sheet to be furnished) corresponding to rated current (Sl. No. 6) & rated voltage ( sl. No. 5) [Refer clause No. 21.4 (Guaranteed Loss) of SCC, Volume I]
56 Note: (i) For 630sq.mm Cable
a) Total 3 Phase Dielectric Loss at rated voltage and rated current
i. One Circuit alive KW/KM
ii. Both Circuits alive KW/KM .
b) Total 3 Phase Copper Loss at rated voltage and rated current
i. One Circuit alive KW/KM
ii.Both Circuits alive KW/KM
c) Total 3 Phase sheath / screen loss at rated voltage & rated current
i. One Circuit alive KW/KM
ii.Both Circuits alive KW/KM
d) Other losses due to reinforcement
i. One Circuit alive KW/KM
ii.Both Circuits alive KW/KM
e) Total Losses at rated voltage & rated current
i. One Circuit alive KW/KM
ii.Both Circuits alive KW/KM
57 Charging Current at rated Voltage per Km (Amps)
58 Short circuit Capacity of Conductor for one second at 90 deg. C prior to short circuit and 250 deg. C during short circuit (KA)
59 Circulating current under the BEB condition in
i. Lead sheath Amps
ii. Copper wire screen Amps
iii. In both Amps
when current in conductor is 500A
60 Circulating current in lead sheath armouring /Cu screen (when the conductor is carrying 31.5 KA S.C. current. KA
61 Combined short circuit capacity of Metallic sheath and screen for 1 Sec. at metallic sheath/screen temperature of 75 deg. C (conductor temperature 90 deg. C before S.C and 250 deg. C during S.C K.A:
62 Screening factor of cable for calculating interferance on control and communication cables :
63 Approximate value of attenuation of carrier current signals operating over a frequency range
i. 50 KC/s - dB/KM
ii. 100 KC/s - dB/KM
iii. 150 KC/s - dB/KM
iv. 200 KC/s - dB/KM
64 Shipping weight and size of cable drum
a) Size of Drum
i. Dia of Drum (M)
ii. Width of Drum (M)
iii. Gross Weight (Kgs)
iv. Legth of cable per Drum (M)
v. Weight of Cable (Kg/M)
vi. Weight of Copper (Main conductor excluding copper wire screen) (Kg/M)
vii. Weight of Lead (Kg/M)
viii. Weight of Copper (Copper wire screen excluding main conductor) (Kg/M)
65 Guaranteed Maximum life in years
DERATING FACTORS
1 VARIATION IN GROUND TEMPERATURE :
Ground Temperature (deg. C) : 15 20 25 30 35 40 45
2 VARIATION IN DEPTH OF LAYING :
Depth of Laying (Meters): 0.7 0.9 1.0 1.2 1.3 1.35 1.5 1.8
3 VARIATION IN THERMAL RESISTIVITY OF SOIL
Thermal Resistivity of Soil : (deg. C cm/watt) 100 120 150 200 250
4 VARIATION IN AIR TEMPERATURE :
Air Temperature (deg. C) : 25 30 35 40 45 50 55
5 VARIATION DISTANCE (MM) :
Axial Distance (mm) Between circuits 100 200 300 400 600 800
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
GUARANTEED TECHNICAL PARTICULARS FOR 66 KV UG CABLES ACCESSORIES
66kV, 630Sq. mm NORMAL STRAIGHT JOINT (EARTHING TYPE) AND (STRAIGHT JOINT INSULATED)
Sl.No. PARTICULARS
1 Name of the manufacturer
2 Country of Manufacture
3 Type (Design) of joint
4 No. of years the design is in commercial use
5 Rated voltage KV
6 Rated Current Amps
7 Suitable for cable conductor Sq.mm
8 Connector, type, material
9 Partial discharge test 123 KV PC
10 A.C. withstand voltage KV
11 Impulse withstand voltage +ve and -ve 10 times kV KV
12 Load cycling 90° C +5° C (No. of cycles)
13 Load cycling as above under 1 M water at 160 KV (No. of cycles)
14 D.C. withstand 92 KV Hrs.
15 D.C. withstand voltage 15 Min.
16 Conductor thermal short circuit 250° C, 1 sec.
17 Shield thermal short cuircuit 250° C 1 Sec
18 Type tested to standard (s)
19 Maximum Conductor temperature in joint at rated current
20 Additional Information
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Establishing 2x20MVA, 66/11kV substation at Hunasekatte village and construction of 66kV 630Sqmm UG cable LILO line from existing 66kV Santhekadur-Bhadra line to the proposed Hunasekatte Substation for a distance of 0.597Km and construction of 66kV line on 110kV DC towers on existing 66kV Santhekadur-Bhadra line for a distance of 0.811km Bhadravathi Taluk, Shivamogga District on Partial Turnkey basis including supply of all matching materials/equipments (Excluding supply of 11kV Switchgear) and erection (including civil works) of all materials/equipments, testing and commissioning.
66kV, 630Sq. mm Cable end Termination (Sealing End)
Sl.No. PARTICULARS Out door type In door type
1 Manufacturer's Name
2 Country of Manufacture
3 Class and Type
4 No. of years the design is in commercial use
5 Rated Voltage kV
6 Rated continuous current Amps.
7 Total Creepage distance (mm)
8 Maximum conductor size, Cu/Al, (sq.mm)
9 Details of terminal connector
10 Power frequency voltage 1 min. dry withstand test (kV rms)
11 Power frequency voltage wet with stand voltage KV Time : Sec. KV
12 Power frequency voltage 6 H Dry withstand voltage kV. Rms.
13 Flash over voltage Dry kV rms
14 Radio interference voltage (R.I.V) Test (Micro Volts)
15 Pratial discharge (corona) extinction test :
a) Extinction voltage kV rms
b) Minimum detector sensitivity PC
16 Impulse voltage Lightning voltage Dry with stand kV (Crest)
17 Direct voltage 15 Min. Dry with stand KV
18 Description of materials used in the terminations with electrical & mechanical particulars
19 Mounting Structure Details for termination
20 Electrical & Mechanical Particulars of
a) Heat Shrinkable Tubing
b) Heat Shrinkable Moulded parts
c) Heat Shrinkable adhesives / sealents
21 Type tested to (standard(s))
22 Other details
Please enclose complete Technical literature
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
GUARANTEED TECHNICAL PARTICULARS FOR 66 KV,630 Sq.mm UG CABLES AND CABLE ACCESSORIES
Sl. No. Description Manufacturer-1 Manufacturer-2
1 Cross section and dimensional drawing of the cable with weight
2 Detailed drawing of the straight through joint
3 Detailed drawing of the direct earthing link boxes
a) Weather proof type
b) Structure mounted type
4 Detailed drawing of the cable earthing arrangement
5 Detailed drawing of the cable protection unit (S.V.L.)
6 Outline dimensional and assembly drawings of cable sealing end.
7 Outline dimensional and assembly drawings of
a) Normal straight joint
8 Detailed drawing of cable termination supporting structure and foundation.
9 Schematic drawing of cables installation.
a) Cable screen earthed at both ends.
b) Installaiton of cables in trench (direct buried)
c) Installation of cables in pipe / ducts
d) Installation of cable in RCC through / over open drains
e) Plain and cross sectional drawing of cable jointing bay in detail.
10 Detailed drawing of RCC cable protection powers
11 Detailed drawing of cable reel/drum
12 Characteristics of cable temperature Vs current.
13 Characteristics of cable and sealing end power factor Vs temperature
14 Characteristics of cable and sealing end power factor Vs voltage.
15 Characteristics of cable and sealing end partial discharge magnitude Vs voltage.
16 Characteristics of cable covering protection unit (S.V.L)
17 Foundation drawings of
a) Cable end terminaiton structure.
b) Sph, link box mounting structure.
18 Arrangement of joint chamber with dimensions
19 Arrangement of terminal structure for outdoor sealing end with civil designs with earthing arrangement cable
20 Cross section of sheath bonding cable
21 Drawing of straight rollers and angle rollers
22 Trefoil clamp
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
SCHEDULE OF Tests for UG Cable and Cable Accessories
Sl.No. Details Required STANDARD AS PER WHICH TESTED DATA/TEST RESULTS TO BE FURNISHED
D Special Tests(Specified)
E Other tests at works/site recommended by the tenderer
II Total cost towards inspection and tests(special routine and acceptence tests)included in the price bid(if changeable to owner)(Break-up details to be furnished separately)
Note:Details have to be furnished for tests on cables as well as accessories,each separately.
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
TECHNICAL DATA SHEET
BIDDERS NAME AND ADDRESS
Test Data on the 66kV XLPE cable and accessories
Sl.No. DETAILS REQUIRED STANDARDS AS PER WHICH TESTED DATA/TEST RESULTS TO BE FURNISHED
1 FOR IMPULSE TEST (HOT CONDITIONS):i. Number of samples tested.
ii. Cable cross section and insulation wall thickness
iii. Type of terminations
iv. Type of joints
v. Basic impulse level (wave form and peak voltage)
vi. Breakdown level
2 FOR POWER FREQUENCY TEST (COLD/HOT CONDITIONS):i. Number of samples tested
ii. Cable cross section and insulation wall thickness
iii. Type of terminations
iv. Type of joints
v. Voltage applied and duration
vi. Breakdown level
3 FOR LONG TERM TESTS:i. Length of the cable loop
ii. Cable cross section and insulation wall thickness
iii. Number and type of terminations & joints
iv. Installation conditions (air, buried)
v. Voltage applied and duration
vi. Conductor temperature at the end of heating cycle
vii. Breakdown conditions (if any)
NOTE: Details should be furnished for each and every sample for item (1) and (2) and for each and every long term test for item (3).
Place Designation
Name of the Company
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
SCHEDULE OF GUARANTEED TECHNICAL PARTICULARS FOR UNARMOURED U.G FIBRE OPTIC CABLE
Sl.No. Description
1 Manufacturer’s Name
2 Country of Manufacture
3 Class and Type
4 No. of years the design is in commercial use
5 Type of Material
6 Dimensions / Weight mm/Kg
7 Fibre Description:
8 Mode Field Diameter:
9 Cladding Diameter:
10 Mode Field concentricity error:
11 Cladding non-circularity
12 Cable cut off wavelength
13 1550 loss performance
14 Proof Test Level
15 Attenuation coefficient
19 Giga Bit Ethernet Distance
20 10 Giga Bit Ethernet Distance
21 Connector loss
23 Outer jacket
25 Chromatic Dispersion: Maximum:
27 Zero dispersion wavelength:
29 Zero Dispersion Slope
30 Polarization mode dispersion coefficient
31 Blend performance
32 List of consumables to be supplied by the vendor
33 Type Tested to Standard (S)
34 Colour Coding & Fibre Identification:
35 Strength Members
36 Filling Compound:
37 The Sheath /Inner Jacket
38 The Outer Jacket /Termite Protection
40 Mechanical parameters & Tests
Tensile strength
Crush test (Compressive Strength):
Cable Bending test (Repeated bending
41 Other complete Technical Details
42 Additional Information
Place Designation
Name of the Company
Karnataka Power Transmission Corporation Limited
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
TECHNICAL DATA SHEET
GUARANTEED TECHNICAL PARTICULARS OF OPGW CABLE.
SLNO PARAMETER UNIT PARTICULARS
1 Fibre Manufacturer Dual Window Single-Mode:
2 No. of Fibres Dual Window Single-Mode: each
4 Buffer Tube Diameter: mm
5 Buffer Tube material
6 No. of Buffer Tubes: each
7 No. of Fibers per Tube: each
8 Identification/numbering of individual tubes:
9 No. of empty tubes (If any): each
10 Filling material:
11 Filling material compliant with technical specifications? Yes/No
12 Strength member(s):
13 Binding yarn/ tape:
14 Describe Central Core Design:
15 Aluminum Clad steel wire
Diameter: mm each
16 Aluminum alloy wires
Diameter: mm each
17 Aluminum tube inner diameter: mm
18 Aluminum tube outside diameter: mm
19 Cable Diameter:(nominal ± deviation) mm
20 Cable cross-section area (Nominal): mm2
21 Cable cross-section area (Effective): mm2
22 Fully Compliant with IEEE 1138: Yes/No
23 Max. breaking load/ Ultimate Tensile Strength (UTS): kN
24 Fibre strain margin: %
25 Zero fibre strain up to load kN
26 Weight: kg/km
27 Crush strength: kg/mm
28 Equivalent Modulus of elasticity: KN/mm2
29 Minimum Bending Radius without microbending: mm
30 Maximum Bending Radius: Short Term: Long Term (Continuous): mm
31 Tensile proof test (Screening) level: KN/mm2
32 Maximum permissible tensile stress: KN/mm2
33 Permissible CTS. tensile stress: KN/mm2
34 Maximum sag at maximum temperature and design span with no wind: mm
35 Everyday tension at 32ºC, no wind: % of UTS
36 Maximum tension at Every day condition with full wind pressure Kg
Thermal Properties of Cable:
38 Coefficient of linear expansion: per °C
39 Coefficient of expansion
Cladding: per °C
40 Nominal operating temperature range: °C
41 SC current transient peak temperature: °C
42 Maximum allowable temperature for lightning strike: °C
CABLE SPOOL and DRUM:
43 Available length per spool
46 Size of drum: m
47 Weight of empty drum: kg
48 Weight of drum with cable: spooled kg
49 Will drum length scheduling be practiced to match transmission line span lengths? Yes/No
50 Describe Drum materials:
51 Describe cable end capping and protection against abrasion etc.:
52 Splice Loss: dB
Maximum: Average: dB
53 Operating Temperature Range: °C
54 Rated Isoceraunic No.
55 Expected Cable Life: Years
56 Installation rate per team: km/day
57 No. of persons per team: no.
58 Max. possible span for specified operating conditions: M
59 Midspan sag at 0°C with no wind loading: Mm
60 Midspan sag at max temp. with no wind loading: Mm
61 Midspan sag at max temp. and wind loading Mm
62 Cable swing angles:
63 Describe Installation method(s):
OPTICAL PARAMETERS:
64 Fiber manufacturer(s)/Type:
65 Fiber production method:
66 Attenuation Coefficient
@ 1310 nm: dB/km
@ 1550 nm: dB/km
67 Attenuation Variation with
68 Wavelength (±25 nm): dB/km
69 Attenuation at water peak: dB/km
70 Point discontinuity
71 Temperature dependence (induced attenuation): dB
72 Nominal Mode Field Diameter
73 Mode Field Diameter Deviation
74 Mode field non-circularity: %
75 Chromatic Dispersion Coefficient
@ 1550 nm: Ps/nm.km
76 Zero dispersion wavelength: nm
77 Zero dispersion Slope: ps/nm2.km
78 Cutoff wavelength: nm
79 Refractive Index:
80 Refractive Index profile:
81 Cladding Design:
82 Numerical aperture:
PHYSICAL and MECHANICAL PROPERTIES:
83 Bend Performance:
(37.5 mm radius, 100 turns) @1310 nm dB
(30 mm radius, 100 turn) @1550 nm (16mm radius, 1 turn) @ 1550nm dB
84 Core Diameter (nominal± deviation): μm
85 Core non-circularity: %
86 Cladding Diameter μm
(nominal ± deviation):
87 Core- Clad concentricity Error: μm
88 Cladding noncircularity: %
89 Fibre cut-off wavelength μm
90 Protective Coating type & material
Primary: Secondary:
91 Protective Coating Diameter μm
(nominal ± deviation):
92 Protective Coating removal method:
93 Coating Concentricity μm
94 Polarisation mode dispersion coefficient ps/km^1/ 2
95 Proof test level kpsi
96 Colour coding scheme compliant with EIA/TIA 598 or IEC 60304 or Bellore GR-20. Yes/No
97 Colouring material compliant with technical specs? Yes/No
NOTE : Other Techincal paramters should be as per technical specifications
Place Designation
Name of the Company
Karnataka Power Transmission Corporation Limited
Bid Enquiry No: KPTCL/2026-27/UC/WORK_INDENT4258
Tender for the work of laying of 66kV UG Cable from location No. 43 to 54 in Cheelandavadi village state forest Cauvery wildlife protected area for a distance of 1.265 kms for the work of Construction of proposed 66kV SC Line on DC towers from existing 66/11 kV Doddalahalli S/s to proposed 66/11kV Hegganur Substation in Kanakapura Taluk, Ramanagara District on Total TurnKey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
TECHNICAL DATA SHEET
GUARANTEED TECHNICAL PARTICULARS OF OPGW HARDWARE
SLNO PARAMETER UNIT PARTICULARS
I. Suspension Clamp Assembly:
Name of Manufacturer:
Address of the Manufacturer #:
1 Minimum vertical Strength kN
2 Maximum Slip Strength kN
3 Minimum Slip Strength kN
4 Length (nominal) mm
5 Weight (nominal) kg
6 Total Drop (maximum) including shackles mm
7 Tightening torque (nominal) Nm
8 Details of Armour Rod Set
a) No. of rods per clamp
b) Direction of Lay
c) Overall length mm
d) Diameter of each Rod mm
(i) Diameter of each rod ±%
(ii) Length of each rod ±%
f) Material of manufacture
g) UTS of each Rod kN
9 Details of Protection Splice Set (Reinforcing Rods)
i) No. of rods per clamp
j) Direction of Lay
k) Overall length mm
l) Diameter of each Rod mm
(i) Diameter of each rod ±%
(ii) Length of each ±%
n) Material of manufacture
o) UTS of each Rod kN
II. Dead End Clamp Assembly:
Name of Manufacturer:
Address of the Manufacturer #:
1 Minimum Slip Load kN
2 Length (nominal)
a) Reinforcing Rods mm
3 Weight (nominal)
a) Reinforcing Rods kg
4 Breaking strength (minimum) kN
a) Reinforcing Rods mm
III. Vibration Damper
Name of Manufacturer:
Address of the Manufacturer #:
1 Total Weight Kg
2 Weight of each Damper Kg
3 Material of Damper Weight
4 Clamp Material
5 Clamp bolt tightening torque Nm
6 Clamp bolt material
7 Messenger Cable Material
8 No. of Strands in Messenger Cable
9 Breaking Strength of Messenger Cable kN
10 Resonance Frequencies
a) First Frequency Hz
b) Second Frequency Hz
c) Third Frequency Hz
d) Forth Frequency Hz
11 Minimum Slip Strength of Damper Clamp
a) Before Fatigue Test kN
b) After fatigue Test kN
IV. Down Lead Clamp /Fastening Clamp
Name of Manufacturer:
Address of the Manufacturer #:
2 Suitable for OPGW (range): mm
3 Tightening torques Nm
4 Vertical load kN
5 Filler details:
(b) diameter: mm
6 Tower attachment arrangement
V. Splice Enclosures(Joint Box) for Overhead FO cable
Name of Manufacturer:
Address of the Manufacturer #:
1 Dimensions H * W * D: cm
3 Colour and Finish:
4 Cable Glanding & Fixing:
5 Construction materials & Gauge:
6 Locking arrangements:
7 Installation Clearances: Front Access:
Rear Access: Top * Bottom * Sides: cm
8 IP Protection Class
9 Total number of optical couplings: ea
10 Provision of pass through splicing: Yes/No
11 Whether filled with suitable encapsulant Yes/No
Optical Fibre Cable Accommodations
13 Cable Glanding:
14 Maximum number of cables that can be accommodated:
15 Diameter(s) of cables that can be accommodated:
16 Describe Cable entries
Cable Termination Splice Accomodations:
17 Details of Splice Trays:
Colour & Finish:
Method of mounting:
18 Maximum number of splice trays: ea
19 Number of splices per tray: ea
20 Provision of Splice organisors:
21 Do splice trays require a separate enclosure? If so: Yes/No
Dimensions H * W * D: cm
Colour and Finish:
Method(s) of Mounting:
Construction materials & Gauge:
Locking arrangements:
22 Installation Clearances
Top * Bottom * Sides:
Excess length of fibre service loops m
V1. JOINT BOX for Approach cable
Name of Manufacturer:
Address of the Manufacturer #:
1 Dimensions cm
3 Colour and Finish:
4 Cable Glanding:
5 Construction materials & Gauge:
7 Total number of optical splicing: ea
8 Suitable for use in Manholes and direct buried: Y/N
9 Degree of Protection IP
10 Describe sealing method
Optical Fibre Cable Accommodations
11 Cable Glanding:
12 Maximum number of cables that can be accommodated: each
13 Describe Cable entries:
Cable Termination Splice Accommodations:
14 Maximum number of splice trays: each
15 Number of splices per tray: each
VII. Fibre Optic Distribution Panels (FODPs)
Name of Manufacturer:
Address of the Manufacturer #:
1 Dimensions H * W * D: cm
3 Colour and Finish:
4 Cable Glanding & Fixing:
5 Construction materials & Gauge:
6 Locking arrangements:
7 Installation Clearances: Front Access:
Rear Access: Top * Bottom * Sides: cm
8 IP Protection Class
9 Total number of optical couplings: ea
10 Provision of pass through splicing: Yes/No
11 Whether filled with suitable encapsulant Yes/No
12 Method(s) for mounting
Optical Fibre Cable Accommodations
13 Cable Glanding:
14 Maximum number of cables that can be accommodated: each
15 Diameter(s) of cables that can be accommodated:
16 Describe Cable entries:
Cable Termination Splice Accomodations:
17 Details of Splice Trays:
Colour & Finish:
Method of mounting:
18 Maximum number of splice trays: ea
19 Number of splices per tray: ea
20 Provision of Splice organisors:
21 Do splice trays require a separate enclosure? If so: Yes/No
Dimensions H * W * D: cm
Colour and Finish:
Method(s) of Mounting:
Construction materials & Gauge:
Locking arrangements: m
22 Installation Clearances Front Access:
Rear Access: Top * Bottom * Sides:
Excess length of fibre service loops
VIII. APPROACH CABLE
Name of Manufacturer:
Address of the Manufacturer #:
1 Fibre Manufacturer
Dual Window Single-Mode:
2 No. of Fibres
Dual Window Single-Mode: each
4 Buffer Tube Diameter: mm
5 Buffer Tube material
6 No. of Buffer Tubes: each
7 No. of Fibers per Tube: each
8 Identification/numbering of individual tubes:
9 No. of empty tubes (If any): each
10 Filling material:
11 Filling material compliant with technical specifications? Yes/No
12 Strength member(s):
13 Binding yarn/ tape:
14 Describe Central Core Design:
15 Outside Jacket coating (if any)
16 Jacket thickness mm
17 Jacket non-circularity %
18 Cable Diameter: (nominal deviation) mm
19 Cable cross-section area: mm2
20 Rip-cord provided? Yes/No
21 Fully Compliant with IEC 60974-3: Yes/No
Mechanical Properties of Cable
22 Max. breaking load/ Ultimate Tensile Strength (UTS): kN
23 Fibre strain margin: %
24 Zero fibre strain up to load kN
25 Weight: kg/km
26 Crush strength: kg/mm
27 Equivalent Modulus of elasticity: KN/mm2
28 Minimum Bending Radius without microbending: mm
29 Maximum Bending Radius: mm
Short Term: Long Term (Continuous):
30 Tensile proof test (Screening) level: KN/mm2
31 Maximum permissible tensile stress: KN/mm2
32 Permissible CTS. tensile stress: KN/mm2
33 Every day tensile stress N
34 Torsion twist/m
Thermal Properties of Cable
35 Coefficient of linear expansion: per °C
36 Coefficient of expansion
Cladding: per °C
37 Nominal operating temperature range: °C
CABLE SPOOL and DRUM
38 Available length per spool m
Maximum: Nominal:
39 Size of drum: m
40 Weight of empty drum: kg
41 Weight of drum with cable: spooled kg
42 Will drum length scheduling be practiced to match transmission line span lengths? Yes/No
43 Describe Drum materials:
44 Describe cable end capping and protection against abrasion etc.:
45 Splice Loss:
Maximum: Average: dB
46 Operating Temperature Range: °C
47 Expected Cable Life: Years
48 Describe Installation method(s) and the cable duct parameters for installation of approach cable:
IX. PLB HDPE PIPE
2 Pipe diameter(outside) mm
nominal tolerance
3 Wall thickness mm
nominal tolerance
4 Standard Length mm
nominal tolerance
6 Two concentric layers type/ Homogeneous type Construction
7 Thickness of permanent lubricant mm
8 Construction material of outer layer
9 Construction material of inner layer
11 Inner layer colour
12 Base HDPE Resin: (a)Density at 270 C Kg/m3
(b)Melt flow rate at 1900 C & 5 kg load g/10 minutes
13 Service life span year
14 Maximum outside diameter of FO cable that can be installed by blowing technique mm
15 Suitable for underground cable installation by- Y/N
16 Suitable for laying in trenches by- Y/N
(a)Directly burying (b)Through G.I./RCC hume pipe
17 Suitable for laying through trenchless horizontal direction drilling Y/N
18 Tensile strength N/mm2
19 Elongation at break %
20 Internal coefficient of friction
21 Bend radius Mm
22 Draw rope details:
(a) Construction
(b) Diameter mm
(d) Breaking Load Strength kg
23 Describe anti rodent measures of PLB HDPE pipes
Pipe accessories
24 Coupler type
25 Coupler material
26 Coupler strength
27 End cap material
NOTE : Other Techincal paramters should be as per technical specifications
Place Designation
Name of the Company
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tender Document WI-4258.docx
Tender Document • 0.53 MB
Sec 11a Techno com sheet WI-4258.xlsx
Techno-Commercial Worksheet • 1.00 MB
Hegganur sketch.pdf
Tender Document • 0.87 MB
Circulars and Guidelines_Circulars and Guidelines_CEA Guidelines.pdf
Tender Document • 1.73 MB
Circulars and Guidelines_Circulars and Guidelines_Circular for sand.pdf
Tender Document • 0.06 MB
Circulars and Guidelines_Circulars and Guidelines_Drone circular dt 26.06.25.pdf
Tender Document • 0.20 MB
Circulars and Guidelines_Circulars and Guidelines_GIS based asset mapping.pdf
Tender Document • 0.69 MB
Circulars and Guidelines_Circulars and Guidelines_Inclusive of Incentive clause.pdf
Tender Document • 0.15 MB
Circulars and Guidelines_Circulars and Guidelines_KPTCL e BG circular.pdf
Tender Document • 0.23 MB
Circulars and Guidelines_Circulars and Guidelines_KPTCL Revised stamp duty circular.pdf
Tender Document • 0.82 MB
Circulars and Guidelines_Circulars and Guidelines_Vendor appr guid_Cir TypeTest.pdf
Tender Document • 0.07 MB
Circulars and Guidelines_Circulars and Guidelines_Vendor appr guid_Circular appr draw.pdf
Tender Document • 0.35 MB
Circulars and Guidelines_Circulars and Guidelines_Vendor appr guid_vendorapproval.pdf
Tender Document • 0.95 MB
Circulars and Guidelines_Circulars and Guidelines_Vendor approval_Circular for Vendor Approval labaratories for Drawing GTP etc.pdf
Tender Document • 0.35 MB
Circulars and Guidelines_Circulars and Guidelines_Vendor approval_Cirular for acceptance of TypeTest of ERDA.pdf
Tender Document • 0.07 MB
Circulars and Guidelines_Circulars and Guidelines_Vendor approval_OM for validity of type test report dtd 16-02-26.pdf
Tender Document • 0.09 MB
Circulars and Guidelines_Circulars and Guidelines_Vendor approval_vendor approval Guidelines.pdf
Tender Document • 0.95 MB
Circulars and Guidelines_Circulars and Guidelines_OM for Type Test validity.pdf
Tender Document • 0.09 MB
NIT-WI-4258.pdf
Tender Document • 16.82 MB
Survey report.pdf
Tender Document • 1.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .