Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
125 live47 closing this weekmost from Karnataka Power Transmission Corporation Limited
125 results • Latest
Providing additional 1X10MVA 110/11kV Power Transformer at 110kV Benaktti Sub station in Yaragatti Tq., Belagavi Dist including supply of equipments / materials, erection, civil works, testing and commissioning on Partial Turn Key Basis.(Transformer and switchgear dept. supply).
Combined Package for,Work-A-Replacement of 1X10 MVA, 110/11 kV transformer by 1X20 MVA , 110/11 kV transformer at 110 kV Karaya Sub station in Belthangady Taluk , Dakshina Kannada District,Work-B- Replacement of 1X10 MVA, 110/11 kV transformer by 1X20 MVA , 110/11 kV transformer at 110 kV Konaje Sub station in Ullala Taluk , Dakshina Kannada District.Work C- Replacement of 2X10 MVA, 110/11 kV Power Transformers by 2X20 MVA 110/11 kV Power Transformer along with providing additional 11 kV Switchgear and replacement of indoor type old, retrofitted 11 kV switchgear by new 11 kV MCVCB outdoor Switchgear at 110 kV Halady Sub Station in Kundapura Taluk, Udupi Districton Partial Turnkey Basis, including Supply of all Materials/Equipments(Excluding supply of 11kV Switchgear) and Erection (including dismantling & Civil Works) of all Materials/Equipments, Testing and Commissioning
Combined Package for,Work-A- Providing additional 1X20 MVA , 110/33 kV Transformer and 33 kV bay at 110/33/11 kV Nittur Sub Station in Udupi Taluka & District,Work-B-Creation of 33 kV Reference by providing 2X20 MVA , 110/33 kV Power Transformer along with 33 kV Terminal Bays at 110 kV Karkala Sub Station in Karakala Taluk , Udupi District,Work-C Balance portion of works pertaining to work of construction of 1 No of 110 KV Terminal Bay for the 110 kV Karaya Line at the existing 110/33/11 KV Sub Station at Puttur in Puttur Taluk, Dakishna Kannada District on Total Turnkey Basis, including Supply of all Materials/Equipments and Erection (including dismantling & Civil Works) of all Materials/Equipments, Testing and Commissioning.
Combined Package for Work A Augmentation of existing 3x20MVA, 66/11kV Power Transformers by 3x31.5MVA, 66/11kV Power Transformers at 66/11kV Manyatha Tech Park Sub-station in Bengaluru North Taluk & Bengaluru Urban District. Work B Augmentation of existing 2x20MVA, 66/11kV Power Transformers by 2x31.5MVA, 66/11kV Power Transformers at 66/11kV Attur Yelahanka Sub station in Bengaluru North Taluk & Bengaluru Urban District on Total Turnkey Basis, including Supply of all Materials/Equipments and Erection (including Dismantling & Civil Works) of all Materials/Equipments, Testing and Commissioning.
Establishing 2x20MVA, 110/11kV Sub-station at Nandarga in Afzalpur Taluk, Kalaburagi District,2.Construction of 110kV LILO line from proposed 110kV Ghanagapura (Nimbarga)-Karajagi DC line to proposed 2x20MVA, 110/11kV Sub-station at Nandarga using Panther Conductor for a distance of 0.135km in Afzalpur Taluk, Kalaburagi District,3.Construction of Two Numbers of 110kV Terminal Bays at 220kV Ghanagapura (Nimbarga) Sub-station for termination of proposed 110kV DC line from 220kV Ghanagapura (Nimbarga) Sub-station to 110kV Karajagi Sub-station for a distance of 43.698km in Afzalpur Taluk, Kalaburagi District,4.Construction of 110kV DC line from 220kV Ghanagapura (Nimbarga) Sub-station to 110kV Karajagi Sub-station for a distance of 43.698km in Afzalpur Taluk, Kalaburagi District,5.Construction of Two Numbers of 110kV Terminal Bays at 110kV Karajagi Sub-station for termination of proposed 110kV DC line from 220kV Ghanagapura (Nimbarga) Sub-station to 110kV Karajagi Sub-station for a distance of 43.698km in Afzalpur Taluk, Kalaburagi District,6.De-commissioning of materials/ equipments for construction of 110kV DC line from 220kV Ghanagapura (Nimbarga) Sub-station to 110kV Karajagi Sub-station for a distance of 43.698km in Afzalpur Taluk, Kalaburagi District, on Partial Turnkey basis, including Supply of all matching Materials/Equipments (Excluding Supply of 11kV Switchgear), Erection (including Dismantling and Civil Works) of all Materials/Equipments, Testing and Commissioning.
Establishing 2x31.5MVA, 66/11kV substation at SSM Nagara(Doddabudihal village) and construction of 66kV radial line from existing 220/66kV SRS Davanagere to proposed 66/11kV SSM Nagar(Doddabudihal village) substation for a distance of 10.910km using 630Sqmm UG cable and construction of 1No. of TB at 220/66kV SRS Davanagere in Davanagere Taluk and District.
Combined Package for the following Work A Establishing 2x20MVA 66/11kV Substation at Narasimhagiri(Belligatta) with construction of 66kV LILO line by using Drake Conductor from existing 66kV Gudekote-CJ Halli line to the proposed 66/11kV Narasimhgiri(Belligatta) substation for a distance of 0.679km in Kudligi Taluk, Vijaynagar District. Work B Construction of 66kV LILO line to 66kV Venkatapura Substation from existing 66kV MSD(Munirabad-Sokke-Davanagere) line for a distance of 0.952Kms along with Construction of 2 No. of 66kV Terminal Bays at existing 66/11kV Venkatapura sub-station for construction of 66kV LILO line from existing MSD line in Hosapete Taluk, Vijayanagara District on Partial Turnkey basis including supply of all matching materials/equipments (Excluding supply of 11 kV Switchgear) and erection (including civil works) of all materials/equipments, testing and commissioning.
Construction of 110kV DC link line on DC towers with Panther conductor between 110kV Yadgir North-Honagera Sub Station for a distance of 5.515Km with terminal bays on either end and stringing of 110kV 2nd circuit between 220kV Ramasamudra-110kV Honagera Sub Station with Lynx conductor with terminal bays on either end in Yadgiri Taluk & District on Total Turnkey Basis including Supply of all matching Materials/Equipments and Erection (Including Dismantling and Civil Works) of all Materials/ Equipment, Testing and Commissioning
Providing additional 1x20MVA, 66/11 kV power transformer along with 11kV switchgears at existing 66/11 kV Magala sub-station in Huvinhadagali Taluk, Vijayanagara District Call-1
Establishing 2X20MVA 110/11kV substation at Arabhavi and construction of 110kV LILO line from existing 110kV Ghataprabha-Gokak SC line on DC Towers to the proposed 110/11kV Substation at Arabhavi for a distance of 0.5Kms using Lynx conductor in Mudalagi taluk, Belagavi district on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/ Equipment, Testing and Commissioning
Establishing 2x20MVA, 110/11 kV substation at Nittur and construction of 110kV LILO line using Lynx conductor from on going 110kV Tiluvalli-Hunsabhavi SC line to proposed 110/11kV Nittur substation for a distance of 5.013km in Hirekerur Taluk, Haveri District on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply of 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/ Equipment, Testing and Commissioning.
Conducting detailed survey for upgradation of 220kV Ambewadi Narendra 1 and 2 DC lines from AAAC Moose to AAAC Moose equivalent HPC conductor in Operation Division Sirsi
Establishing 2x20 MVA, 110/11kV sub-station at Rajeev Grama and Construction of 110kV DC Line from existing 110/33/11kV Shiggaon sub-station to proposed 110/11kV Rajeev Grama sub-station using Panther conductor for a distance of about 9.874kms near Konanakeri Village along with Construction of 110kV Terminal Bays at existing 110/33/11kV Shiggaon sub-station in Shiggaon Taluk & Haveri District on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply of 11kV Switchgear) and Erection (Including Civil Works) of all Materials/ Equipment, Testing and Commissioning.
Establishing 2x20MVA, 110/11kV Sub-station at Narona along with construction of 110kV LILO line using Lynx conductor from existing 110kV Aland-Kadaganchi line to proposed 110/11kV Narona Sub-station for a distance of 4.949km in Aland Taluk, Kalaburagi District on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/ Equipment, Testing and Commissioning.
Establishing 2X20 MVA, 66/11kV Sub-Station at Agarabannihatti village along with construction of 66kV LILO line for a distance of about 2.320 kms with High Performance Conductor (HPC) in Channagiri taluk, Davanagere district and Replacement of existing 66kV Benkikere- Devarahalli SC line having coyote conductor by HPC Conductor for distance of 15.680 kms from 220/66kV Benkikere sub station to 66/11kV Devarahalli substation in Channagiri taluk, Davanagere district
Upgradation of existing 2x5MVA, 33/11kV to 2x20MVA, 110/11kV sub-station at Mallapur village (Shirur) along with construction of 110kV LILO line for a distance of 2.290kms in Bagalkot Taluk and District.
Establishing 2x20MVA, 110/11kV Sub-Station at Kunibenchi village and construction of 110kV LILO line from Guledagudda-Ilkal line to proposed 110/11kV Sub-station at Kunibenchi for a distance of 3.083kms using Lynx conductor in Ilkal Taluk, Bagalkote District on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/ Equipment, Testing and Commissioning.
Upgradation of 2x5MVA, 33/11kV sub-station to 2x20 MVA, 110/11kV Sub-station at Bommanahalli and Construction of 110 kV DC line using Panther conductor from ongoing 110kV Akkialur (Balambeeda) Sub-station to the proposed 110kV Bommanahalli Sub-station for a distance of 16.626Kms and Construction of 2 Nos. of 110/11kV Terminal Bays at ongoing 110kV Akkialur (Balambeeda) Sub-station in Hanagal Taluk & Haveri District on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply of 11kV Switchgear) and Erection (Including Civil Works) of all Materials/ Equipment, Testing and Commissioning
Augmentation of 2x8MVA 66/11KV Power Transformers by 2x12.5MVA 66/11kV Power Transformers in 66/11kV Chidravalli Substation, KPTCL in T.Narasipura Taluk, Mysuru District on Partial Turn Key (PTK) basis-Reserved for Cat-I,-Call3
In order to minimise the reactive power.
Establishing 2X20MVA, 110/11kV Sub station at Tajapur H along with Construction of 110kV LILO line from existing 110kV Bableshwar Tikota SC line to the proposed 110kV/11kV sub station at Tajapur H or a distance of about 0.446km in Tikota Taluk, Vijayapura District on PTK including Supply of all Materials/Equipments (Excluding supply of 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/Equipments, Testing and Commissioning.
Tender for providing DD plus 0 Gadag-Bagalkot design intermediate tower to Increase the Vertical clearence of existing 230kV Yarandanahalli-Hosur S/C line between Tower No.34 & 35 near Manchnahalli village, Attibele, Bengaluru in the jurisdiction of TLM sub-division Somanahalli on percentage basis on total turnkey basis.
Replacement of existing 11KV Bank-2 PCVCB Switchgears (1 I/C, 8F, 1CB) by MEI make MCVCBs (1 I/C, 8F, 1CB, 1BC) at 66/11KV Sub-station Hullahalli, Nanjanagudu Taluk, Mysuru District on Partial Turnkey (PTK) basis.Others-Call3
Establishing 2x12.5 MVA, 66/11 kV Sub-station at Madalagere (Bandri Cross), Harapanahalli Taluk, Vijayanagara District and construction of 66 kV LILO line using Coyote Conductor from existing Ittagi-Harapanahalli SC line to proposed 66/11 kV Sub-station at Madalagere (Bandri Cross) for a distance of 9.315 kms in Harapanahalli Taluk, Vijayanagara District on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/ Equipment, Testing and Commissioning.
Supply of 11KV Class 242 kVar and 484kVar Capacitor Units with internal fuses, terminal connectors required to various substations coming under Transmission Operations Zone, KPTCL, Tumakuru
Tender for increasing the Vertical clearance by providing 1no of 66KV D/C NBT DD plus 3 KPTCL design type intermediate tower between tower no 7 & 8 of 66kV Subramanyapura - Remco D/C line-2 near Arehalli limits, Gas godown road, in TLM Sub-Division Somanahalli, Bangalore
Augmentation of 1x8MVA 66/11KV Power Transformer by 1x12.5MVA 66/11KV Power Transformer along with providing additional 1x12.5MVA 66/11KV Power Transformer at 66/11KV Gollanabeedu (Shindenahalli) Sub-Station in H.D.Kote Taluk, Mysuru District.-On Partial Turn Key basis-CALL2
Providing 15Nos of Commercial Hired Vehicles along with Drivers for officials of SLDC/SCADA/TBC/REMC/TCD(S), KPTCL, A.R.Circle, Bengaluru for a period of One year.
Augmentation of 1x8MVA 66/11KV Power Transformer by 1x12.5MVA 66/11KV Power Transformer along with providing additional 1x12.5MVA 66/11KV Power Transformer at 66/11KV Rathnapuri Sub-Station in Hunsur Taluk, Mysuru District.-On Partial Turn Key basis-CALL2-OTHERS
Tender for increasing the Vertical clearance by replacing the existing 2Nos S/C A type H-frame towers of 66kV Somanahalli-Subramanyapura S/C line-1 near Balaji Layout park, Raghuvanahalli and near Balmuri Ganesh Temple, Manjunath nagar limits by 66KV D/C NBT DD plus 3 KPTCL design towers in TLM Sub-Division Somanahalli, Bangalore on total turnkey & percentage basis.
Augmentation of 2 x 12.5 MVA, 66/11kV Power Transformer by 2 x 31.5 MVA, 66/11 kV Power Transformer at 66/11 KV Bannimantapa sub-station in Mysuru Taluk, Mysuru district.-call2-Reserved for SC
Establishing 2x20MVA, 66/11kV S/s at G.Kodihalli and Construction of 66kV LILO line from existing 66kV Moragere Tambrahalli SC line to proposed 66/11kV G.Kodihalli S/s for a distance of 2.91kms with Coyote Conductor in Hagari Bommanahalli Taluk, Vijayanagara District on PTK including Supply of all matching Materials/Equipments (Excluding Supply of 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/ Equipment, Testing and Commissioning
Providing additional 1x31.5 MVA, 66/11kV Power Transformer at 220/66/11kV EPIP GIS Sub-station and at 220/66/11kV Puttenahalli Sub-station and replacement of 1x20MVA by 1x31.5MVA at 66/11kV Sahakarnagar Sub-station on PTK basis.
Augmentation of 3x100MVA, 220/66/11kV power transformers by 3x150MVA, 220/66/11 kV power transformers at 220/66kV SRS Hiriyur in Hiriyur taluk , Chitradurga district including Supply of all Materials/ equipments, Mandatory Spares, Erection (Including dismantling and Civil Works) of all materials/equipments, Testing and Commissioning
Repair of punctured Y-Phase 110kV 240 sqmm XLPE UG Cable of 110kV SRS-PHC line near Settlement area in Hubballi City, Dharwad District in Operation Division, KPTCL Hubballi including Supply of materials/ equipments, Erection, Civil works, Testing & Commissioning on Partial Turnkey Basis.
Upgradation of protection system at 220kV station, BWSSB, Tataguni, Kanakapura Road, Bengaluru on Turnkey Basis on Percentage Basis
Design, manufacturing testing, and supply of 66KV Class Potential Transformers 0.2 Accuracy, 31.5KA rating with Marshalling Boxes and without Mounting Structures conforming to KPTCL Technical Specifications F.O.R.D at stores/Site basis, including insurance, transportation and unloading for the use at various Sub-Stations coming under Transmission Operations Circle-South, KPTCL Bengaluru
Establishing 2x20MVA, 110/11 kV substation at Kawloor(Shettikera) and construction of 110kV LILO line using Lynx conductor from existing 110kV Khanapura-Saidapura SC line to proposed 110/11kV Kawloor(Shettikera) substation for a distance of 0.040km in Yadgir Taluk and District on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/ Equipment, Testing and Commissioning.
Establishing 2X20MVA, 110/11kV Sub-station at Adakalabandi(Kodala) along with construction of 110kV DC line from existing 110kV Gondadagi Substation to proposed 110/11kV Adakalabandi Sub-Station for a distance of 7.907 Kms and construction of 2Nos of terminal Bay at 110kv Gongadagi Substation in Wadegera Taluk, Yadgir District on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/ Equipment, Testing and Commissioning.
Providing additional 1X10 MVA at 110/11 kV power transformer along with 11kV Switchgear at 110 kV S/S Bommanal substation in Raibag taluka, Belagavi district Including supply of equipment / materials, erection, civil works, testing and commissioning on Partial Turn Key Basis.
Providing additional 1x20MVA, 66/11kV Power Transformer at 66/11kV B.V Halli sub-station, in Channapattana Taluk, Bengaluru South district including supply of all materials/ equipment (excluding 11kV switchgear) and erection (including Civil works) of all materials/ equipments, testing and commissioning on Total Turnkey Basis
Providing additional 1X20MVA, 66/11kV Power Transformer at 66/11kV Thyamagondlu Sub-Station in Nelamangala Taluk and Bengaluru Rural District on Total Turnkey Basis including supply of all Materials/Equipments (Excluding Supply of 11kV Switchgears) and Erection (including civil works) of all Materials/Equipments, Testing and Commissioning
Increasing the vertical clearance and rectification of hazardous location of existing 66kV Koramangala-Golf Links-Amarjyothi-1 & 2 Double Circuit transmission line passing through Defence land between Tower Location Nos. 15 to 26 at Agram Army Camp, Domlur, Bengaluru, by providing Intermediate Towers under TLM Sub-Division, Hoody, pertaining to Transmission (Operation) Circle South in Bengaluru.
Augmentaion Work
Augmentation of 2x100MVA, 220/66/11kV power transformers by 2x150MVA, 220/66/11 kV power transformers and providing additional spare1X150 MVA, 220/66/11kV transformer at 220/66kV Benkikere sub station in Channagiri taluk , Davanagere district.
Construction of 220kV Terminal Bay for Setting up of 150MW/300MWh Stand Alone Battery Energy Storage System at 400/220kV sub-station Doni in Mundargi taluk, Gadag district on Total Turnkey Basis including Supply of all Materials/equipments, Erection (including Civil and dismantling Works) of all materials/equipments, Testing and Commissioning.
Work of Tree enumeration in forest land & providing boundary demarcation using wooden sticks along the Line corridor in the forest land to the length of 5.092km in respect to the work of construction of 110kV DC line on DC towers using from existing 110/33/11kV Guruvayanakere sub-station to proposed 110/33/11kV substation at Kakkinje (Chibidre) for a distance of 21.405 kms in Belthangady taluk, Dakshina Kannada district.
Combined Package for the following Work A-Establishing 2X20MVA, 110/11kV Sub-station at Nidasoshi and construction of 110kV LILO line by using Lynx Conductor from existing 110kV Chikkodi-Sankeshwara line on DC towers to proposed 110/11kV Nidasoshi Sub-Station for a distance of 7.8Kms in Hukkeri Taluk, Belagavi District. Work B-Establishing 2X20MVA 110/11kV Sub-station at Shekin Hosur(Bugate Alur) Village and construction of 110kV DC line on DC towers by using Panther Conductor from proposed Nidasoshi Substation to Proposed 110/11kV Shekin Hosur(Bugate Alur) Village for a distance of 18.08Kms along with Construction of 2Nos of Terminal Bays at 110kV Nidasoshi Sub-station in Hukkeri Taluk, Belagavi District
Establishing 2X20 MVA, 110/11kV sub-station at Chalageri and construction of 110kV DC line from existing 110/11kV Aremallapura Substation to proposed 110/11kV Challageri substation using panther conductor for a distance of 18.169kms along with construction of 2 nos of 110kV terminal bays at existing110/11kV Aremallapura sub-station in Ranebennur Taluk, Haveri District on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply of 11kV Switchgear) and Erection (Including Civil Works) of all Materials/ Equipment, Testing and Commissioning.
Establishing 2x20 MVA, 110/11 kV Sub-station at Wanadurga along with construction of 110kV DC line on DC towers (LILO) from existing 110kV Shahapur-Kembhavi-II for a distance of about 1.559kms in Shahapur Taluka Yadgir District on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/ Equipment, Testing and Commissioning