| 1 | L1₹7.0 LAccepted-AOC | ₹7.0 L | L1 | Accepted-AOC Being the L1 bidder |
| 2 | L2₹7.2 L+₹20,363.44 (2.90%)Rejected-AOC AYITHARA AYITHARA MAMBARAM KANNUR | KANNUR | KANNUR | KERALA | ₹7.2 L+₹20,363.44 (2.90%) | L2 | Rejected-AOC Being the L2 bidder and the L1 bidder executed the agreement. |
| 3 | L3₹7.5 L+₹48,604.09 (6.92%)Rejected-Finance MAKKAPARAMBIL HOUSE PATTANAKKAD P O CHERTHALA 688531 | CHERTHALA | ALAPPUZHA | KERALA | 688531 | ₹7.5 L+₹48,604.09 (6.92%) | L3 | Rejected-Finance Rejected being the L3 bidder |
Tender Value
₹8.4 L
EMD Value
₹21,000
Closing Date
7 Aug 2026, 5:00 pmClosed
AEE AEE TSD Moozhiyar, KSEBL 689 662
AEE TSD Moozhiyar, KSEBL 689 662
Cleaning the disc insulators checking the tightness of bridgings and earth clamp condition of hardware fitting and Vibration damper of 66 kV feeder under LMS, Moozhiyar as Sabarimala Pre Season Work
2026_KSEB_861412_1
AEE/TSD-MZR/et06/26-27/18.7.26
Open Tender
Electrical and Maintenance Works
Percentage
Moozhiyar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,006
₹21,000
3 Sept 2026
24 Jul 2026
11 Aug 2026
24 Jul 2026
7 Aug 2026
24 Jul 2026
24 Jul 2026 - 31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Pre Sabarimala maintenance work | |||||
| 1.01 | Cleaning the disc insulators, checking the conditions of hardware fittings &vibration damper, tightness of bridgings &earth wire etc. by going through sling on a line on Tension tower of 66 KV Kochupampa – Sabarigiri ( 6KPSB) feeder and conveying tools and materials from Department vehicle to work site and back after completion of work by head load etc. as per the Department staff at site. | 270 | E | 1,293.31 | ₹3,49,193.7 |
| 1.02 | Cleaning the disc insulators, checking the conditions of hardware fittings &vibration damper, tightness of bridgings &earth wire etc. by going through sling on a line on Suspension tower of 66 KV Kochupampa – Sabarigiri (6 KPSB) feeder and conveying tools and materials from Department vehicle to work site and back after completion of work by head load etc. as per the direction of department staff at site. | 18 | E | 775.98 | ₹13,967.64 |
| 1.03 | Tightening of the bolted connections of jumper, hardware fittings, vibration dampers etc. of a line on a tension tower of 66/110kV feeder and for conveying tools and materials from department vehicle to work site and back after completion of work by head load etc. as per directions of departmental staff | 106 | No | 732.1 | ₹77,602.6 |
| 1.04 | Tightening the bolted connections of jumper, hardware fittings, vibration dampers etc. of a line on a suspension tower of 66 KV feeder and for conveying tools and materials form department vehicle to work site and back after completion of work by head load etc. as per directions of departmental staff | 48 | E | 439.24 | ₹21,083.52 |
| 1.05 | Dismantling one set tension string with conductor from D-shackle of the 66/110kV tension tower after tensioning the conductor by using special appliances after giving jumper connections, then lowering the conductor with tension string, dismantling existing tension clamp with fittings from the conductor , marking the position of the tension hardware fittings after changing the damaged portion of line conductor if any with new conductor and providing single tension hardware fittings/double tension hardware fittings(double tension hardware fittings for road crossings etc.) on the conductor using compressor, replacing damaged disc insulators ,re-assembling the insulator string to the tension hardware fittings with conductor, lifting the same, re-assembling to the existing D-shackle at the cross arm and giving necessary jumper connections etc. as per the direction of departmental staff. Special tools if available will be supplied at free of cost. | 44 | set | 7,212.13 | ₹3,17,333.72 |
| 1.06 | Dismantling of one set suspension clamp with line conductor from 66/110kV suspension string after lifting the conductor using special appliances, placing the conductor with suspension clamp on tower cross arm , lowering the string using rope and pulley, dismantling the string and re-assembling the same with new disc insulator after changing all rusted/flashed/damaged disc insulators then lifting the same and placing it to the existing U bolt at cross arm using rope and pulley then lifting the line conductor with suspension clamp and connecting the same to the bottom of string insulator as per the direction of department staff. | 21 | set | 2,218.45 | ₹46,587.45 |
| 1.07 | Paving out, stringing and tensioning as per standard of one 7/10 OR 7/3.15stranded steel earth wire including fixing the conductors on to the tower top using tension clamps and suspension clamps, jumpering the conductors at tension points, jointing the conductor wherever necessary, erection of earth bonds, hire charges of tractor and stringing tools, etc. Complete. ((.46/.59)* rate for 7/3.66) | 0.25 | km | 48,931.53 | ₹12,232.88 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1456828.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tendernotice_2.pdf
PDF • 0.96 MB
BOQ_1456828.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .