Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹15.9 L
EMD Value
₹31,900
Closing Date
3 Jun 2022, 9:00 amClosed
Executive Engineer
O/o Executive Engineer, B and R Division, HPPWD, Joginder Nagar
Providing and laying built-up spray grout, and bituminous concrete in Km. 1/0 to 2/0
2022_PWD_61189_1
PW-JND-B and R-EA-I-NIT- 6019-43 dt. 24-05-2022
Open Tender
Civil Works - Roads
Item Rate
90 days
Draman
As Per SBD
10 documents required · 10 mandatory
₹500
Yes
₹31,900
Yes
7 Sept 2022
28 May 2022
3 Jun 2022
28 May 2022
3 Jun 2022
28 May 2022
Amount
Providing, laying, spreading and rolling of built-up spray grout layer using bitumen VG-10 over prepared base by manual means consisting of a Single layer composite construction of crushed coarse aggregates using motor grader for aggregates. Key stone chips spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the second layer to serve as a base, conforming to the line, grades and cross-section specified, the compacted layer thickness being 37.5 mm (thirty seven point five millimetre) as per Technical Specification, complete in all respect including haulage of material in all leads and lifts by all modes of transportation and as per the entire satisfaction and direction of Engineer-in-Charge.
Providing and applying tack coat with bitumen emulsion confirming to IS:8887 (RS-1) using emulsion pressure distributor including preparing the surface and cleaning with mechnical broom on bituminous surface @ 0.250 kg/sqm (at the rate of zero point two five zero kilogramme per square metre) as per technical specification, complete in all respect including haulage of material in all leads and lifts by all modes of transportation and as per the entire satisfaction and direction of Engineer-in-Charge.
Providing and Laying bituminous concrete 30mm ( thirty millimetre) compacted thickness with bitumen of grade VG-10 (Ten) @ 5.00% (at the rate of five point zero per cent) (percentage by weight of total mix) and lime filler @ 3% (three percentage) (percentage by weight of aggregatre) prepared in Batch Type Hot Mix Plant of 100-120 (Hundred - one hundred twenty) TPH capacity by using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required garde, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete in all respect including haulage of material in all leads and lifts by all modes of transportation and as per the entire satisfaction and direction of Engineer-in-Charge.
YUDHBIR INFRASTRUCTURE.PVT.LTD
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .