| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹34.4 LAccepted-AOC | ₹34.4 L | 1 | Accepted-AOC O.K. |
| 2 | 2₹43.3 LRejected-AOC | ₹43.3 L | 2 | Rejected-AOC O.K. |
| 3 | 3₹43.9 LRejected-AOC MIHINPURWA BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | ₹43.9 L | 3 | Rejected-AOC O.K. |
| 4 | 4₹49.0 LRejected-AOC 16 PRATAP NAGAR CHARBHUJA RAWATBHATA RAJASTHAN 323307 | RAWATBHATA | CHITTORGARH | RAJASTHAN | 323307 | ₹49.0 L | 4 | Rejected-AOC O.K. |
Tender Value
₹48.6 L
EMD Value
₹49,000
Closing Date
26 Feb 2019, 5:00 pmClosed
S.E., E.T.C., Bareilly
Superintending Engineer Hydel Campus, Near L.I.C. Office Rampur Garden, Bareilly
Construction of LILO of 132KV Dohna (220) - Pilibhit Ckt. on D.C. Towers at 132KV Sub Station Nawab Ganj, Bareilly alongwith other associated Works under E.T.D. - II, Bareilly
2019_UPTCL_315196_1
E-Tender No. 104 / W / ETC(B) / 2018 - 19
Open Tender
Electrical Works
120 days
Bareilly
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
A/c No 10897666087 IFSC SBIN0000615 S.B.I. Bly
₹49,000
8 Sept 2020
20 Feb 2019
27 Feb 2019
20 Feb 2019
26 Feb 2019
20 Feb 2019
20 Feb 2019 - 26 Feb 2019
Amount
Construction of LILO of 132KV Dohna (220) - Pilibhit Ckt. on D.C. Towers at 132KV Sub Station Nawab Ganj, Bareilly alongwith other associated Works, with all Cost of Men, Materials, Misc. Consumables, T&Ps, Transportation of Materials etc. Required for Satisfactory Completion of the Work as per Technical Specifications and Direction of the Supervising Engineer, as per Details below : (1) Supply of Compression type Single Tension Fitting Assembly, suitable for ACSR Panther Conductor consisting of Compression Dead End Clamp with Jumper Terminal (Cone), Anchor Shackle, Ball Clevis (HH type), Socket Clevis (HH type), Line side Arcing Horn, Tower side Arcing Horn complete with Bolts-Nuts-Spring Washers, Split Pin etc. as per Technical Specifications & Sample.
(2) Supply of Repair Sleeve, suitable for ACSR Panther Conductor duly made of Extruded Aluminium Sleeve (OD 38 mm, ID 23 mm, L 241 mm) as per Technical Specifications & Sample.
(3) Supply of Stock Bridge Vibration Damper, (4R type), suitable for ACSR Panther Conductor as per Technical Specifications & Sample.
(4) Supply of Compression type Tension Fitting Assembly, suitable for 7/10 SWG Earth Wire consisting of Dead End Tube, Jumper Tube, Anchor D-Shackle complete with Bolts-Nuts-Spring Washers, Cotter Pin etc. as per Technical Specifications & Sample.
(5) Supply of Stock Bridge Vibration Damper, (4R type), suitable for 7/10 SWG Earth Wire as per Technical Specifications & Sample.
(6) Supply of Flexible Copper Bond of size 12 mm x 570 mm duly made of Electrolytic Copper and Crimped with Copper Lugs at both ends as per Technical Specifications & Sample
(7) D-Shackle, suitable for Fixing on Cross Arm of ‘B’ & ‘C’ type 132KV Towers and duly made of 20 mm dia. M.S. Round & Hot Dip Galvanized complete with Bolts, Nuts, Plain & Spring Washers as per Drawing / Sample.
(8) Number Plate in size of 165 mm x 150 mm duly made of 16 SWG M.S. Sheet with Letters and Numerals in enamelled Red colour on White Colour enamelled Background indicating Name of Transmission Line in short (in English Letter of size 35 mm height) and Tower No. (in English Letter of size 65 mm height) as per Requirement alongwith 2 No. 16 mm x 40 mm size G.I. Bolts - Nuts - Spring Washers with of 2 No. holes in Number Plate for Fixing as per Technical Specifications & Sample and Instruction of Supervising Engineer.
(9) Phase Plate in Sets of both sides enamelled Red, Yellow & Blue Colour Circular Discs of dia. 100 mm duly made of 16 SWG M.S. Sheet alongwith 1 No. 16 mm x 40 mm size G.I. Bolt - Nut - Spring Washer with 1 No. hole in Phase Plate for Fixing as per Technical Specifications & Sample.
(10) Danger Plate in size of 380 mm x 250 mm duly made of 16 SWG M.S. Sheet written 'DANGER' in English letter of size 35 mm Height, '[krjk' in Hindi Letter of size 45 mm height, '132000 Volt' in English Letter of size 30 mm Height Indicating 'Sign of Danger' in size of 70 mm x 80 mm all shown Symmetrically in Enamelled Red Colour on White Colour Enamelled Background alongwith 2 No. 16 mm x 40 mm size G.I. Bolts - Nuts - Spring Washers with 2 No. Holes in Danger Plate for Fixing as per Technical Specifications & Sample.
(11) Pipe type Earthing Equipment Set consisting of 32 mm dia. 3050 mm Long Heavy Duty Perforated 'C' Class G.I. Pipe, 50 mm x 6 mm size & 4750 mm long Galvanized Steel Flat, 2 No. 12 mm x 40 mm size G.I. Bolts - Nuts - Spring Washers etc. as per Technical Specifications & Sample.
(12) Survey including Making of Location Route, Preparation of Profile, Tower Schedule, Schedule of Materials for LILO of 132KV Dohna - Pilibhit Line on D.C. Towers at 132KV Sub Station Nawab Ganj.
(13) Check Survey & Peg Marking of Tower Locations.
(14) Excavation of Foundation Pits for 132KV D.C. Towers including all Earth Work, Back Filling, Levelling etc.
(15) Setting of Stubs of 132KV D.C. Towers including all Foundation Work but excluding the Cost of Concerting & Excavation as per Details below : (a) B+0' type Tower
(b) C+0' type Tower
(16) Concreting of Foundations using M20 Grade Cement - Concrete - Coarse Sand Mixture in the Ratio of 1:2:4 with 20 mm Stone Metal for Towers & Gantries including Cost of Materials, De-watering, Shoring, Shuttering, Framing, Curing etc.
(17) Installation of Steel Reinforcement Bars in R.C.C. Foundation for Towers including Cost of Steel Reinforcement Bars with due Cutting, Bending, Placing, Binding etc.
(18) Transportation of new Tower Parts, ACSR Panther Conductors, 7/10 SWG Earth Wire, Disc Insulators / Polymer Insulator Strings, Hardware Fittings etc. (Approx. 65 MT) from designated Sub Stations in Bareilly / Pilibhit Districts or any Place (Approx. Distances upto 80 Km) to Line Site, Line Site to Line Site as per Direction of the Supervising Engineer including Loading, Unloading & Stacking etc.
(19) Erection of Super Structures of above 132KV Towers, their Extensions wherever Required including all Work above Ground Level with proper Fixing & Tightening of all Tower Parts including Fitting of Danger Plate, Phase Plate, Number Plate, Bird Guard etc. but excluding the Hoisting of Insulators, Fixing of Hardware Fittings, Conductor / Earth Wire Fittings / Accessories etc.
(20) Laying, Stringing, Tensioning, Clamping of 7/10 SWG Earth Wire including Fixing of Tension Fittings, Vibration Dampers etc. between Section Towers and Section Tower to Sub Station Gantry in new LILO Line from LILO Tower No. 1 to Sub Station Gantry (132KV Nawab Ganj - Barkhera Ckt. on one side & 132KV Nawab Ganj - Pilibhit Ckt. on other side). (1 Job per Section)
(21) Laying, Stringing, Tensioning, Clamping of ACSR Panther Conductor in all the 6 Phases including Hoisting of Tension Insulator Strings, Tension Fittings, Vibration Dampers etc. between Section Towers and Section Tower to Sub Station Gantry in new LILO Line from LILO Tower No. 1 to Sub Station Gantry (132KV Nawab Ganj - Barkhera Ckt. on one side & 132KV Nawab Ganj - Pilibhit Ckt. on other side). (1 Job per Section)
(22) De-Stringing of 7/10 SWG Earth Wire & 6 Phase ACSR Panther Conductors between Tower Loc. No. 141 B to 146 B of 132KV D.C. Line (132KV Dohna - Nawab Ganj Ckt. / 132KV Nawab Ganj - Barkhera Ckt. on one side and 132KV Dohna - Pilibhit Ckt. on other side, as per Details below : (a) De-Stringing of 3 No. Phase Conductors between Tower Loc. No. 141 B to 146 B of 132KV Nawab Ganj - Barkhera Ckt.
(b) De-Stringing of 3 No. Phase Conductors between Tower Loc. No. 141 B to 146 B of 132KV Dohna - Pilibhit Ckt.
(c) De-Stringing of Earth Wire between Tower Loc. No. 141 B to 146 B of 132KV D.C. Line (132KV Dohna - Nawab Ganj Ckt. / 132KV Nawab Ganj - Barkhera Ckt. on one side and 132KV Dohna - Pilibhit Ckt. on other side)
(23) Laying, Stringing, Tensioning, Clamping of 7/10 SGW Earth Wire and 6 Phase ACSR Panther Conductors including Fixing of Tension Fittings, Vibration Dampers etc. for Earth Wire and Hoisting of Tension Insulator Strings, Tension Fittings, Vibration Dampers etc. for Phase Conductors between Tower Loc. No. 141 B to LILO Tower No. 1 of new above LILO Line, as per Details below : (a) Stringing of 3 No. Phase Conductors between Tower Loc. No. 141 B to LILO Tower No. 1 (for 132KV Nawab Ganj - Barkhera Ckt.) of new above LILO Line.
(b) Stringing of 3 No. Phase Conductors between Tower Loc. No. 141 B to LILO Tower No. 1 (for 132KV Nawab Ganj - Pilibhit Ckt.) of new above LILO Line.
(c) Stringing of Earth Wire between Tower Loc. No. 141 B to LILO Tower No. 1 (for 132KV Nawab Ganj - Barkhera Ckt. on one side & 132KV Nawab Ganj - Pilibhit Ckt. on other side) of new above LILO Line.
(24) De-Stringing of 7/10 SWG Earth Wire & 6 Phase ACSR Panther Conductors between Tower Loc. No. 146 B to 153 B of 132KV D.C. Line (132KV Dohna - Nawab Ganj Ckt. / 132KV Nawab Ganj - Barkhera Ckt. on one side and 132KV Dohna - Pilibhit Ckt. on other side), as per Details below : (a) De-Stringing of 6 No. Phase Conductors between Tower Loc. No. 146 B to 147A in Line Section between Tower Loc. No. 146 B to 153 B of above 132KV D.C. Line for Cutting & Holding the Conductors for Restringing between newly Erected Tower No. 146 C to 153 B.
(b) De-Stringing of Earth Wire between Tower Loc. No. 146 B to 147A in Line Section between Tower Loc. No. 146 B to 153 B of above 132KV D.C. Line for Cutting & Holding the Earth Wire for Restringing between newly Erected Tower No. 146 C to 153 B.
(25) Laying, Stringing, Tensioning, Clamping of 7/10 SGW Earth Wire and 6 Phase ACSR Panther Conductors including Fixing of Tension Fittings, Vibration Dampers etc. for Earth Wire and Hoisting of Tension Insulator Strings, Tension Fittings, Vibration Dampers etc. for Phase Conductors between new Tower Loc. No. 146 C to 153 B of 132KV D.C. Line (now 132KV Dohna - Nawab Ganj Ckt. I & II), as per Details below : (a) Stringing of 6 No. Phase Conductors between Tower Loc. No. 146 C to 147A in Line Section between Tower Loc. No. 146 C to 153 B of above 132KV D.C. Line.
(b) Stringing of Earth Wire between Tower Loc. No. 146 C to 147A in Line Section between Tower Loc. No. 146 C to 153 B of above 132KV D.C. Line.
(26) De-Stringing of 7/10 SWG Earth Wire & 6 Phase ACSR Panther Conductors between Tower Loc. No. 146 B to Tower Loc. No. 1 of 132KV old LILO Line (132KV Dohna - Nawab Ganj Ckt. on one side & 132KV Nawab Ganj - Barkhera Ckt. on other side), as per Details below : (a) De-Stringing of 6 No. Phase Conductors between Tower Loc. No. 146 B to Tower Loc. No. 1 of 132KV old LILO Line.
(b) De-Stringing of Earth Wire between Tower Loc. No. 146 B to Tower Loc. No. 1 of 132KV old LILO Line
(27) Laying, Stringing, Tensioning, Clamping of 7/10 SGW Earth Wire and 6 Phase ACSR Panther Conductors including Fixing of Tension Fittings, Vibration Dampers etc. for Earth Wire and Hoisting of Tension Insulator Strings, Tension Fittings, Vibration Dampers etc. for Phase Conductors between new Tower Loc. No. 146 C to Tower Loc. No. 1 of old 132KV LILO Line (now 132KV Dohna - Nawab Ganj Ckt. I & II), as per Details below : (a) Stringing of 6 No. Phase Conductors between Tower Loc. No. 146 C to Tower Loc. No. 1 of old 132KV LILO Line.
(b) Stringing of Earth Wire between Tower Loc. No. 146 C to Tower Loc. No. 1 of old 132KV LILO Line.
(28) Cutting of Tack Welding of all the Bolts - Nuts upto 2nd Section of the Towers (5 No.) to be Dismantled above the Ground Level with the help of Grinding / Cutting Tools. (No. per Bolt)
(29) Dismantling of 4 No. 132KV ‘A’ type & 1 No. 132KV 'B' type D.C. Towers including all Work above the Ground Level with Proper Opening of all Tower Parts including Danger Plate, Phase Plate, Number Plate, Bird Guard etc.
(30) Cutting of Stub and taking out the Chimney by Scrapping & Excavating the Earth, then Removal of Scrap Materials & Leveling of the Earth to Make it suitable for Farming. (1 Job per Stub / Chimney)
(31) Tack Welding of all the Bolts - Nuts upto 2nd Section of the above Tower and upto 5 Meter Height of Gantries from Ground Level with 3 Tacks of 10 mm thickness, then Applying of Zinc Rich Aluminium Paint on the Affected Surfaces. (No. per Bolt)
(32) Earthing Work including Earth Work etc. for Pipe type Earthing of Section Towers including Cost of Coke, Salt etc. but Excluding Cost of Pipe type Earthing Equipment Set.
(33) Transportation of Dismantled Tower Parts, ACSR Panther Conductors, 7/10 SWG Earth Wire, Disc Insulators, Hardware Fittings etc. (Approx. 40 MT) from Line Site to 132KV Sub Station Nawab Ganj, as per Direction of the Supervising Engineer including Loading, Unloading & Stacking etc.
(34) Round the Clock Watch & Ward of the Line / Line Materials during Construction Work to avoid Theft of Tower & Gantry Structures, Conductors, Earth Wire, Disc Insulators / Polymer Insulator Strings, Line Hardware Fittings, Tower Accessories etc. (1 Job per Day)
Gayatri Ganga Construction
Star Construction
Gupta Construction Co.