| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.3 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹86.1 L+₹12.8 L (17.5%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹92.6 L+₹19.2 L (26.2%)Rejected-AOC | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | J HARIKUMAR L2 | KS DAS L3 | AKHIL VS L1 |
|---|---|---|---|---|---|---|
| 1.00Appendix A Building proper | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 143.94 | cum | 384.9 ₹55,403.66 | 413.68 ₹59,546.34 | 250 ₹35,985.75 Lowest |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 32.57 | cum | 140.38 ₹4,571.9 | 150.88 ₹4,913.86 | 120 ₹3,908.16 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 16.86 | cum | 8,488.19 ₹1,43,068.44 | 9,122.82 ₹1,53,765.13 | 7,500 ₹1,26,412.5 Lowest |
| 1.00 | OD218704/2025-2026:Providing and laying in position ready mixed M-30 grade concrete for reinforced cement
concrete work, using cement content as per approved design mix, manufactured in fully
automatic batching plant and transported to site of work in transit mixer for all leads, having
continuous agitated mixer, manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of R.M.C. from transit mixer to site of laying,
excluding the cost of centering, shuttering finishing and reinforcement including cost of
admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete,
improve workability without impairing strength and durability as per direction of the Engineer -
in -charge. Note:- Cement content considered in this item is @340 kg/cum.
All work upto plinth level .(Excess/less cost of cement as per mix design is
not payable or recoverable) | 44.46 | cum | 11,746.81 ₹5,22,227.93 | 12,625.08 ₹5,61,273.18 | 9,500 ₹4,22,341.5 Lowest |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 4.85 | cum | 8,950.09 ₹43,381.09 | 9,619.26 ₹46,624.55 | 7,500 ₹36,352.5 Lowest |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 108.03 | cum | 340.76 ₹36,814.01 | 366.24 ₹39,566.74 | 280 ₹30,249.8 Lowest |
| 1.01 | OD218691/2025-2026:Providing and laying in position ready mixed M-30 grade concrete for reinforced cement
concrete work, using cement content as per approved design mix, manufactured in fully
automatic batching plant and transported to site of work in transit mixer for all leads, having
continuous agitated mixer, manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of R.M.C. from transit mixer to site of laying,
excluding the cost of centering, shuttering finishing and reinforcement including cost of
admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete,
improve workability without impairing strength and durability as per direction of the Engineer -
in -charge. Note:- Cement content considered in this item is @340 kg/cum.
All work above plinth level upto floor V level.(Excess/less cost of cement as per mix design is
not payable or recoverable) | 96.33 | cum | 13,923.72 ₹13,41,202.33 | 14,964.74 ₹14,41,478.58 | 12,500 ₹12,04,062.5 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 5,555.58 | kilogram | 120.3 ₹6,68,336.27 | 129.29 ₹7,18,280.94 | 105 ₹5,83,335.9 Lowest |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 14,559.43 | kg | 120.3 ₹17,51,500.03 | 129.29 ₹18,82,389.35 | 105 ₹15,28,740.68 Lowest |
Tender Value
₹80.5 L
EMD Value
₹50,000
Closing Date
21 Mar 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer PWD Buildings Division Kollam
GENERAL Construction of new building for Govt LPS Koickalbhagom Uparikunnu New Block Govt L P S Koickalbhagom Kollam General Civil Work
2026_PWD_846394_1
PWD/BLDG/TR/19503/2025
Open Tender
Civil Works - Buildings
Item Rate
270 days
uparikunnu
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
20 Jul 2026
11 Mar 2026
23 Mar 2026
11 Mar 2026
21 Mar 2026
11 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A Building proper | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.2 | cum | - | - |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 1 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | OD218704/2025-2026:Providing and laying in position ready mixed M-30 grade concrete for reinforced cement
concrete work, using cement content as per approved design mix, manufactured in fully
automatic batching plant and transported to site of work in transit mixer for all leads, having
continuous agitated mixer, manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of R.M.C. from transit mixer to site of laying,
excluding the cost of centering, shuttering finishing and reinforcement including cost of
admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete,
improve workability without impairing strength and durability as per direction of the Engineer -
in -charge. Note:- Cement content considered in this item is @340 kg/cum.
All work upto plinth level .(Excess/less cost of cement as per mix design is
not payable or recoverable) | - | cum | - | - |
| 1.005 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.006 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 1 | cum | - | - |
| 1.007 | OD218691/2025-2026:Providing and laying in position ready mixed M-30 grade concrete for reinforced cement
concrete work, using cement content as per approved design mix, manufactured in fully
automatic batching plant and transported to site of work in transit mixer for all leads, having
continuous agitated mixer, manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of R.M.C. from transit mixer to site of laying,
excluding the cost of centering, shuttering finishing and reinforcement including cost of
admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete,
improve workability without impairing strength and durability as per direction of the Engineer -
in -charge. Note:- Cement content considered in this item is @340 kg/cum.
All work above plinth level upto floor V level.(Excess/less cost of cement as per mix design is
not payable or recoverable) | - | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.009 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1429914.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.64 MB
BOQ_1429914.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .