Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 CrAdmitted-Finance | ₹5.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.2 Cr+₹77.6 L (14.2%)Admitted-Finance DOOR NO XXVII 1580 KOITHARA ROAD PANAMPILLY NAGAR KOCHI 682 036 | KOCHI | ERNAKULAM | KERALA | 682036 | ₹6.2 Cr+₹77.6 L (14.2%) | L2 | Admitted-Finance |
| 3 | L3₹6.4 Cr+₹94.1 L (17.2%)Admitted-Finance | ₹6.4 Cr+₹94.1 L (17.2%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | B5BUILDING SOLUTIONS L3 | Kurian And Varghese L1 | M.J.JOY AND COMPANY L2 |
|---|---|---|---|---|---|---|
| 1.00 | Lump sum price worked out by the Contractor for “BUILDINGS AND STRUCTURES" as listed in Schedule ‘A’ Part - I representing ________ % ___________________ percent Above / Below the lump sum price of `2,88,00,000.00 inserted by the MES in Schedule ‘A’ Part - I | 1 | LUMPSUM | 3,42,00,000 ₹3,42,00,000 | 2,98,51,200 ₹2,98,51,200 Lowest | 3,30,88,000 ₹3,30,88,000 |
| 2.00 | Lump sum price worked out by the Contractor for “EXCAVATION AND EARTHWORK / DEVELOPMENT OF SITE" as listed in Schedule ‘A’ Part - II representing ________ % __________ percent Above / Below the lump sum price of `1,32,673.48 inserted by the MES in Schedule ‘A’ Part - II | 1 | LUMPSUM | 1,45,000 ₹1,45,000 Lowest | 1,52,580 ₹1,52,580 | 1,50,600 ₹1,50,600 |
| 3.00 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - III representing __________ % ____________ percent Above / Below the lump sum price of `18,20,841.08 inserted by the MES in Schedule ‘A’ Part - III | 1 | LUMPSUM | 20,95,000 ₹20,95,000 | 18,73,800 ₹18,73,800 | 18,46,200 ₹18,46,200 Lowest |
| 4.00 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - IV representing __________ % ____________________ percent Above / Below the lump sum price of ₹3,41,448.19 inserted by the MES in Schedule ‘A’ Part - IV | 1 | LUMPSUM | 3,45,000 ₹3,45,000 | 4,09,740 ₹4,09,740 | 3,41,448.19 ₹3,41,448.19 Lowest |
| 5.00 | Lump sum price worked out by the Contractor for “ROAD” as listed in Schedule ‘A’ Part - V representing ________ % ____________ percent Above / Below the lump sum price of ₹14,32,133.70 inserted by the MES in Schedule ‘A’ Part - V | 1 | LUMPSUM | 16,50,000 ₹16,50,000 | 15,22,000 ₹15,22,000 Lowest | 20,88,400 ₹20,88,400 |
| 6.00 | Lump sum price worked out by the Contractor for “HARDSTANDING” as listed in Schedule ‘A’ Part - VI representing _____________ % __________________ percent Above / Below the lump sum price of ₹4,08,809.20 inserted by the MES in Schedule ‘A’ Part - VI | 1 | LUMPSUM | 4,10,000 ₹4,10,000 Lowest | 4,99,700 ₹4,99,700 | 4,54,600 ₹4,54,600 |
| 7.00 | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part - VII representing ____________ % _____________________ percent Above / Below the lump sum price of `1,40,415.00 inserted by the MES in Schedule ‘A’ Part - VII | 1 | LUMPSUM | 1,45,000 ₹1,45,000 Lowest | 1,52,000 ₹1,52,000 | 1,67,500 ₹1,67,500 |
| 8.00 | Lump sum price worked out by the Contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Part - VIII representing _________ % __________________ percent Above / Below the lump sum price of `17,25,737.50 inserted by the MES in Schedule ‘A’ Part - VIII | 1 | LUMPSUM | 17,50,000 ₹17,50,000 Lowest | 17,78,500 ₹17,78,500 | 18,66,500 ₹18,66,500 |
| 9.00 | Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - IX representing ____________ % _______________________ percent Above / Below the lump sum price of ₹55,882.35 inserted by the MES in Schedule ‘A’ Part - IX | 1 | LUMPSUM | 65,000 ₹65,000 | 62,600 ₹62,600 Lowest | 81,360 ₹81,360 |
| 10.00 | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - X representing __________ % _________________ percent Above / Below the lump sum price of ₹36,591.00 inserted by the MES in Schedule ‘A’ Part - X | 1 | LUMPSUM | 45,000 ₹45,000 | 42,820 ₹42,820 Lowest | 43,400 ₹43,400 |
Tender Value
₹4.3 Cr
EMD Value
₹5.1 L
Closing Date
13 Jul 2026, 6:00 pmClosed
CHIEF ENGINEER RND SECUNDERABAD
CHIEF ENGINEER RND SECUNDERABAD OPP JUBILEE BUS STATION PICKET SECUNDERABAD 500003
PROVISION OF LIVING ACCOMMODATION FOR HALF DSC PLATOON IN VARUNA RESIDENTIAL COMPLEX AT NPOL, KOCHI
2026_MES_760563_1
86147
Open Tender
Civil Works
Lump-sum
300 days
NPOL KOCHI
Class A
category a(i)
8 documents required · 8 mandatory
₹2,000
ASSISTANT GARRISON ENGINEER I RND KOCHI
₹5.1 L
Yes
21 Jul 2026
16 Apr 2026
17 Jul 2026
16 Apr 2026
13 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Schedule 'A' Part-I (BUILDINGS AND STRUCTURES)
This Schedule (contains under mentioned Sl item No. 1.01) is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Col 6. | - | - | - | - |
| - | Lumpsum price worked out by the contractor for Construction of single men barrack for JCO/ORs (01 JCO+01 Hav+26 ORs) with permanent specification in G+2 building with RCC M-30 grade concrete including all fittings and fixtures complete all as specified and as shown on drawings. | - | EACH BLOCK | - | - |
| - | Lump sum price worked out by the Contractor for “EXCAVATION AND EARTHWORK / DEVELOPMENT OF SITE" as listed in Schedule ‘A’ Part - II representing __________ % __________________ percent Above / Below the lump sum price of `4,54,345.55 inserted by the MES in Schedule ‘A’ Part - II | - | LUMPSUM | - | - |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - III representing __________ % ____________ percent Above / Below the lump sum price of `16,24,818.00 inserted by the MES in Schedule ‘A’ Part - III | - | LUMPSUM | - | - |
| - | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - IV representing __________ % ____________ percent Above / Below the lump sum price of ₹3,41,448.19 inserted by the MES in Schedule ‘A’ Part - IV | - | LUMPSUM | - | - |
| - | Lump sum price worked out by the Contractor for “ROAD” as listed in Schedule ‘A’ Part - V representing ________ % ____________ percent Above / Below the lump sum price of ₹11,88,323.10 inserted by the MES in Schedule ‘A’ Part - V | - | LUMPSUM | - | - |
| - | Lump sum price worked out by the Contractor for “HARDSTANDING” as listed in Schedule ‘A’ Part - VI representing __________ % ____________ percent Above / Below the lump sum price of ₹4,08,809.20 inserted by the MES in Schedule ‘A’ Part - VI | - | LUMPSUM | - | - |
| - | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part - VII representing _______ % _________________ percent Above / Below the lump sum price of `1,12,592.50 inserted by the MES in Schedule ‘A’ Part - VII | - | LUMPSUM | - | - |
| - | Lump sum price worked out by the Contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Part - VIII representing _________ % __________________ percent Above / Below the lump sum price of `17,25,737.50 inserted by the MES in Schedule ‘A’ Part - VIII | - | LUMPSUM | - | - |
| - | Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - IX representing __________ % _________________ percent Above / Below the lump sum price of ₹55,882.35 inserted by the MES in Schedule ‘A’ Part - IX | - | LUMPSUM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.49 MB
86147Tender.pdf
Tender Documents • 1.68 MB
BOQ_851912.xls
BOQ • 0.59 MB
Prepriced_Schedules_86147_.pdf
Additional Documents • 0.35 MB
Drawings.rar
Additional Documents • 6.21 MB
Amendment.pdf
PDF • 0.22 MB
86147Postponement.pdf
PDF • 0.18 MB
Amendment.pdf
PDF • 0.39 MB
86147_0003.pdf
PDF • 0.34 MB
86147Postponement.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .