Loading…
Loading…
Updated dates
Tender Value
₹4.3 Cr
EMD Value
₹5.1 L
Closing Date
19 Jun 2026, 6:00 pm
CHIEF ENGINEER RND SECUNDERABAD
CHIEF ENGINEER RND SECUNDERABAD OPP JUBILEE BUS STATION PICKET SECUNDERABAD 500003
PROVISION OF LIVING ACCOMMODATION FOR HALF DSC PLATOON IN VARUNA RESIDENTIAL COMPLEX AT NPOL, KOCHI
2026_MES_760563_1
86147
Open Tender
Civil Works
300 days
NPOL KOCHI
Class A
category a(i)
8 documents required · 8 mandatory
₹2,000
ASSISTANT GARRISON ENGINEER I RND KOCHI
₹5.1 L
Yes
16 Apr 2026
16 Apr 2026
22 Jun 2026
16 Apr 2026
19 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Schedule 'A' Part-I (BUILDINGS AND STRUCTURES)
This Schedule (contains under mentioned Sl item No. 1.01) is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Col 6. | - | - | - | - | |
Lumpsum price worked out by the contractor for Construction of single men barrack for JCO/ORs (01 JCO+01 Hav+26 ORs) with permanent specification in G+2 building with RCC M-30 grade concrete including all fittings and fixtures complete all as specified and as shown on drawings. | - | EACH BLOCK | - | - | |
Lump sum price worked out by the Contractor for “EXCAVATION AND EARTHWORK / DEVELOPMENT OF SITE" as listed in Schedule ‘A’ Part - II representing __________ % __________________ percent Above / Below the lump sum price of `4,54,345.55 inserted by the MES in Schedule ‘A’ Part - II | - | LUMPSUM | - | - | |
Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - III representing __________ % ____________ percent Above / Below the lump sum price of `16,24,818.00 inserted by the MES in Schedule ‘A’ Part - III | - | LUMPSUM | - | - | |
Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - IV representing __________ % ____________ percent Above / Below the lump sum price of ₹3,41,448.19 inserted by the MES in Schedule ‘A’ Part - IV | - | LUMPSUM | - | - | |
Lump sum price worked out by the Contractor for “ROAD” as listed in Schedule ‘A’ Part - V representing ________ % ____________ percent Above / Below the lump sum price of ₹11,88,323.10 inserted by the MES in Schedule ‘A’ Part - V | - | LUMPSUM | - | - | |
Lump sum price worked out by the Contractor for “HARDSTANDING” as listed in Schedule ‘A’ Part - VI representing __________ % ____________ percent Above / Below the lump sum price of ₹4,08,809.20 inserted by the MES in Schedule ‘A’ Part - VI | - | LUMPSUM | - | - | |
Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part - VII representing _______ % _________________ percent Above / Below the lump sum price of `1,12,592.50 inserted by the MES in Schedule ‘A’ Part - VII | - | LUMPSUM | - | - | |
Lump sum price worked out by the Contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Part - VIII representing _________ % __________________ percent Above / Below the lump sum price of `17,25,737.50 inserted by the MES in Schedule ‘A’ Part - VIII | - | LUMPSUM | - | - | |
Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - IX representing __________ % _________________ percent Above / Below the lump sum price of ₹55,882.35 inserted by the MES in Schedule ‘A’ Part - IX | - | LUMPSUM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
86147Tender.pdf
Tender Documents • 1.68 MB
BOQ_851912.xls
BOQ • 0.59 MB
Prepriced_Schedules_86147_.pdf
Additional Documents • 0.35 MB
Drawings.rar
Additional Documents • 6.21 MB
Download all tender documents and submit your bid