Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-Finance | ₹9.2 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹9.3 L+₹9,130 (0.99%)Accepted-Finance 0 BADRI ELECTRICALS NEAR SHRIGOR FALI NEAR ANADABAWA CHAKLO JAMNAGAR GUJARAT 361001 UDYAM GJ 10 0001822 | JAMNAGAR | GUJARAT | 361001 | ₹9.3 L+₹9,130 (0.99%) | L2 | Accepted-Finance Accepted |
| 3 | L3₹9.9 L+₹69,726 (7.59%)Accepted-Finance 274 210 DAFNALA ROAD SHAHIBAUG AHMEDABAD GUJARAT 380009 | AHMADABAD | GUJARAT | 380009 | ₹9.9 L+₹69,726 (7.59%) | L3 | Accepted-Finance Accepted |
| 4 | L4₹10.0 L+₹80,960 (8.81%)Accepted-Finance | ₹10.0 L+₹80,960 (8.81%) | L4 | Accepted-Finance Accepted |
| 5 | L5₹10.0 L+₹81,600 (8.88%)Accepted-Finance | ₹10.0 L+₹81,600 (8.88%) | L5 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | Singh Engineer And Contractor L5 | ALBA AC AND REF SERVICES L3 | Badri Electricals L2 | Shivaang Enterprise L4 | OM ELECTRICAL ENERGY L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches not exceeding 1.5m wide and not exceeding 1.5 m in depth for foundation of pole,laying of cables etc in Hard and dense soil and getting out complete all as specified and directed. | 60 | CUM | 250 ₹15,000 Lowest | 250 ₹15,000 Lowest | 450 ₹27,000 | 400 ₹24,000 | 280 ₹16,800 |
| 2.00 | Returning filling in including spreading, leveling, watering and well ramming in layer not exc 25 cm complete all as specified and directed. | 36 | CUM | 85 ₹3,060 Lowest | 85 ₹3,060 Lowest | 150 ₹5,400 | 125 ₹4,500 | 90 ₹3,240 |
| 3.00 | Removing excavated material not exc 50 mtr and depositing where directed at a level not exc. 1.5 m above the starting point complete all as specified and directed. | 24 | CUM | 85 ₹2,040 Lowest | 99 ₹2,376 | 150 ₹3,600 | 125 ₹3,000 | 90 ₹2,160 |
| 4.00 | M&L for providing dry river sand as in sand cushioning to UG cable including punning gently all as directed. Note : Depth after punning shall be measured and paid. | 10 | CUM | 950 ₹9,500 | 1,170 ₹11,700 | 750 ₹7,500 | 1,400 ₹14,000 | 650 ₹6,500 Lowest |
| 5.00 | M&L for plain cement concrete 1:3:6 type C-2 using 40mm graded stone aggregate in foundtion of pole/stay assembly etc including necessary form work, all as specified and directed. | 3.8 | CUM | 4,500 ₹17,100 Lowest | 5,850 ₹22,230 | 7,500 ₹28,500 | 5,500 ₹20,900 | 4,800 ₹18,240 |
| 6.00 | M&L for plain cement concrete 1:2:4 type B-1 using 20mm graded stone aggregate for padestal/coping around poles, including necessary form work, finishing even and smooth without using extra cement, all as specified and directed. | 2 | CUM | 5,000 ₹10,000 | 6,390 ₹12,780 | 7,500 ₹15,000 | 5,650 ₹11,300 | 4,900 ₹9,800 Lowest |
| 7.00 | Taking out sub class burnt bricks from the trenches and stacking at site serviceable /unserviceable bricks for reuse complete all as specified and directed. | 1,500 | EACH | 0.5 ₹750 Lowest | 1 ₹1,500 | 1 ₹1,500 | 0.5 ₹750 Lowest | 2 ₹3,000 |
| 8.00 | Laying only sub class brunt bricks as cable protection cover all as directed. | 100 | EACH | 1.5 ₹150 | 1 ₹100 | 8 ₹800 | 0.5 ₹50 Lowest | 2 ₹200 |
| 9.00 | Supply and laying sub class old 'B' burnt bricks laid as cable protection cover complete all as specified and directed. | 1,400 | EACH | 8.5 ₹11,900 | 10 ₹14,000 | 8 ₹11,200 | 7 ₹9,800 Lowest | 9 ₹12,600 |
| 10.00 | S&F, in repair, GI pipe, 40mm bore, light grade, laid below road/fixed along the poles / walls with necessary clamping, etc complete all as per specified and directed. | 35 | RM | 445 ₹15,575 | 495 ₹17,325 | 900 ₹31,500 | 350 ₹12,250 Lowest | 640 ₹22,400 |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
27 Jul 2026, 6:00 pmClosed
GE ARMY GANDHINAGAR
GE ARMY GANDHINAGAR PO BSF CAMPUS GANDHINAGAR 382045
REPAIR REPLACEMENT MAINTENANCE AND IMPROVEMENT OF STREET LIGHT SECURITY LIGHTS POLES PAINTING AND ANOTHER MISC WORK AT UNIT LOC AT MIL STN DHRANGADHRA
2026_MES_775278_1
GE(A)/GNR/TOKEN/66 of 2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
MIL STN DHRANGADHRA
AS PER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹500
GE ARMY GANDHINAGAR
₹22,000
Yes
29 Aug 2026
29 Jun 2026
3 Aug 2026
29 Jun 2026
27 Jul 2026
13 Jul 2026
29 Jun 2026 - 11 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating in trenches not exceeding 1.5m wide and not exceeding 1.5 m in depth for foundation of pole,laying of cables etc in Hard and dense soil and getting out complete all as specified and directed. | 60 | CUM | - | - |
| 2 | Returning filling in including spreading, leveling, watering and well ramming in layer not exc 25 cm complete all as specified and directed. | 36 | CUM | - | - |
| 3 | Removing excavated material not exc 50 mtr and depositing where directed at a level not exc. 1.5 m above the starting point complete all as specified and directed. | 24 | CUM | - | - |
| 4 | M&L for providing dry river sand as in sand cushioning to UG cable including punning gently all as directed. Note : Depth after punning shall be measured and paid. | 10 | CUM | - | - |
| 5 | M&L for plain cement concrete 1:3:6 type C-2 using 40mm graded stone aggregate in foundtion of pole/stay assembly etc including necessary form work, all as specified and directed. | 3.8 | CUM | - | - |
| 6 | M&L for plain cement concrete 1:2:4 type B-1 using 20mm graded stone aggregate for padestal/coping around poles, including necessary form work, finishing even and smooth without using extra cement, all as specified and directed. | 2 | CUM | - | - |
| 7 | Taking out sub class burnt bricks from the trenches and stacking at site serviceable /unserviceable bricks for reuse complete all as specified and directed. | 1,500 | EACH | - | - |
| 8 | Laying only sub class brunt bricks as cable protection cover all as directed. | 100 | EACH | - | - |
| 9 | Supply and laying sub class old 'B' burnt bricks laid as cable protection cover complete all as specified and directed. | 1,400 | EACH | - | - |
| 10 | S&F, in repair, GI pipe, 40mm bore, light grade, laid below road/fixed along the poles / walls with necessary clamping, etc complete all as per specified and directed. | 35 | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
TenderDocuments.pdf
Tender Documents • 0.73 MB
BOQ_868140.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .