| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC BLOCK NO 1 AND 4 MUKTANAND COMPLEX BEHIND SBI NIT LAYOUT TRIMURTI NAGAR NAGPUR MAHARASHTRA 440022 | NAGPUR | MAHARASHTRA | 440022 | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.4 L+₹88,000 (13.5%)Rejected-Finance 1ST FLOOR PLOT NO 16 MAHARSHI DAYANAND SARASVATI MARG SECTOR 88 FARIDABAD 121002 | FARIDABAD | FARIDABAD | HARYANA | 121002 | L2 | Rejected-Finance L2 | |
| 3 | L3₹8.5 L+₹2.0 L (30.4%)Rejected-Finance NAGPUR MAHARASHTRA 440024 INDIA UDYAM MH 20 0171104 | NAGPUR | MAHARASHTRA | 440024 | L3 | Rejected-Finance L3 |
Tender Value
₹11.4 L
EMD Value
₹14,300
Closing Date
6 Jan 2025, 5:00 pmClosed
Staff Officer ENM
Office of the General Manager SECL Baikunthpur Area
(A)Carrying out Structural Stability and NDT Test of Surface Bunker installed in Jhilimili Mine (B)Carrying out Structural stability test of surface bunker at Katkona 1N2 Incline (C)NDT of Man Riding System Phase I and Phase II at Katkona 1N2 Incline
2024_SECL_323945_1
SECL/GM/BKP/ENM/eTender/24-25/ 25
Open Tender
Civil Works - Others
Item Rate
365 days
Baikunthpur
As per NIT
8 documents required · 8 mandatory
₹14,300
8 May 2025
23 Dec 2024
7 Jan 2025
24 Dec 2024
6 Jan 2025
24 Dec 2024
24 Dec 2024 - 30 Dec 2024
Amount
Item Description/ Heading : (A) Carrying out Structural Stability and NDT Test of Surface Bunker installed in Jhilimili Mine (One time in 45 Days) (B) Carrying out Structural stability test of surface bunker at Katkona 1&2 Incline of Katkona Sub Area (One time in 45 Days) (C) NDT of Man Riding System Phase I (-1L to 14L) 123 (19L/Return dip to 19L/45X) for one year period (every six month) at Katkona 1&2 Incline of Katkona Sub Area (For Two times in One Year)
(A) Carrying out Structural Stability and NDT Test of Surface Bunker installed in Jhilimili Mine (One time in 45 Days) - NDT and Structural Stability Test for 4X100 Tonne Surface Bunker installed in Surface of Jhilimili UG Mine
(B) Carrying out Structural stability test of surface bunker at Katkona 1&2 Incline of Katkona Sub Area (One time in 45 Days) - Structural stability test of surface bunker along with 51 meter long gantry with their supporting at Katkona 1&2 Incline of Katkona Sub Area - Bunker 2 X 40 MT, Gantry Structure with their supporting column or RCC structure (Rebound Test, Ultrasonic Velocity Test, Vibration analysys, ultrasonic thickness Test, NDT test for joint members of structure, sound analysys etc as requirement of mention work)
(C) NDT of Man Riding System Phase I (-1L to 14L) 123 (19L/Return dip to 19L/45X) for one year period (every six month) at Katkona 1&2 Incline of Katkona Sub Area (For Two times in One Year) - 1. NDT of Man Riding System Phase I for all vital component Location : MAMC dip/-1 to 14L, Drive Station, Return unit, Length : 540 Meter, Entire Rope, Goal Post Structure : 40 Nos, Chairs : 70 Nos (Once in every Six Month) etc.
2. NDT of Man Riding System Phase II for all vital component Location : 19L/Return, Dip to 19L/45X, Drive Station, Return unit, Length : 1670 Meter, Entire Rope, Goal Post Structure : 114 Nos, Chairs : 150 Nos, Curve Station : 02 Nos, Intermediate Station : 01 No. (Once in every Six Month) etc.
Total impact of GST for the purpose of CTC
M/s A TO Z NDT SOLUTIONS (P) LTD (BID ID -1114420)
SHUBHAM TECH SERVICES PRIVATE LIMITED (BID ID -1111832)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .