| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹22.1 L+₹18,990 (0.86%)Accepted-AOC BARAHAPUR P O ANAKHIA BIRIDI KHURDA | KHORDHA | ODISHA | 751001 | 2 | Accepted-AOC AS PER OPWD CODE | |
| 2 | 1₹22.1 LRejected-AOC | 1 | Rejected-AOC AS PER OPWD CODE | |
| 3 | 3₹22.6 L+₹54,266.35 (2.46%)Rejected-AOC | 3 | Rejected-AOC AS PER OPWD CODE | |
| 4 | 4₹22.7 L+₹61,666 (2.79%)Rejected-AOC | 4 | Rejected-AOC AS PER OPWD CODE | |
| 5 | 5₹23.0 L+₹96,197.70 (4.36%)Rejected-AOC | 5 | Rejected-AOC AS PER OPWD CODE |
Tender Value
₹24.7 L
EMD Value
₹24,666
Closing Date
6 Nov 2019, 5:00 pmClosed
EXE.ENGINEER RWSS DIVISION JAGATSINGHPUR
O/ O THE EXE.ENGINEER RWSS DIVISION JAGATSINGHPUR NEAR POLICE BARRACK PIN-754103
DESIGN,DRAWING,TESTING AND COMMISSIONING WITH CONSTRUCTION OF COMPOUND WALL AROUND ESR OF 1,00,000 LTR CAPACITY RCC ESR OF PWS TO GUALIPUR UNDER RAGHUNATHPUR BLOCK
2019_RWSS_56881_1
2019_GUALIPUR_RNPUR
National Competitive Bid
Civil Works - Water Works
Lump-sum
JAGATSINGHPUR
DETAILS OF WHICH IN THE DTCN BELOW
2 documents required · 2 mandatory
₹6,000
E E, RWSS division, JSPUR
₹24,666
Yes
7 Mar 2020
22 Oct 2019
7 Nov 2019
22 Oct 2019
6 Nov 2019
22 Oct 2019
22 Oct 2019 - 30 Oct 2019
Amount
CONSTRUCTION OF ESR ,etc
Supplying of all labour,T&P,material for soil testing ,supply of design, drawing , construction, errection, testing & commissioning etc. of RCC elevated storage reservoir of 1.0 lakh ltrs capacity with necessary staging height of 12 mtr consisting of 6/8 nos RCC columns(as per design),bracing upto foundation using R.C.C M-25 ,spherical dome(WATER RETAINING STRUCTURE) using R.C.C M-30 , 2nos ISI marked 100/150mm D/FCI butter fly valve & it's RCC valve chambers as per approved drawing, supplying, fitting & fixing of 100/150mm dia medium grade GI pipe Tata/Jindal make confirming to IS specification of required length from Head Works to inlet pipe of ESR & Outlet Pipe of ESR to distribution main including CI in-let, out-let, over flow & washing line( double flanged CI column pipe) of ESR of required diameter(100/150mm),RCC stair case with 32mm dia structural stainless steel hand rail around dome and landing etc. and stainless steel ladder inside and outside the ESR, lightening arrester confirming to IS specification, digital water level indicator,100/150mm dia CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally , construction of 1.0mtr wide CC apron around the ESR as per annexure-B,Construction of Compound Wall of required length as per annexure-A should be made by the contractor etc complete as per direction of the Engineer - in- Charge.(The contractor shall execute the work after preparing the design and detail drawing in 5 sets from qualified engineer and to approve all structural design & drawing from StateTechnical Agency(STA) IGIT,Saranga/ CET,BBSR/ VSSUI,Burla/ NIT,Rourkela/ IIT,BBSR at his own cost).
PRAVAT KUMAR BEHERA
SURYANARAYAN DAS
DEBASIS MALLIK
M/s Bikash Kumar Nayak
Prasanta Kumar Gochhayat
MADANA MOHAN NAYAK
sudhir kumar khuntia
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_302451.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .