Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical AT 75 JN ROAD HADDO PORT BLAIR SOUTH ANDAMAN PORT BLAIR 744102 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744102 | Accepted-Technical Verified |
| 2 | Accepted-Technical | Accepted-Technical Verified |
Tender Value
₹16.4 L
EMD Value
₹32,703
Closing Date
15 Sept 2026, 3:00 pmClosed
The Executive Engineer-III (Works), SVPMC
The Executive Engineer-III (Works), SVPMC, Shadipur, Sri Vijaya Puram-744106
Construction/Maintenance Road Side Drain Railing from 1) Dr. Yousuf House to Mudiyarasan House and 2) CC Footpath with Steps Drain from Goverdhan House to Old Shiv Temple Road at New Pahargaon, Ward No.20.
2026_PMBC_24553_1
23/NIT/EE-III/W/MC/2026-27
Open Tender
Civil Works - Others
Percentage
120 days
Pahargaon
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹32,703
16 Sept 2026
4 Sept 2026
15 Sept 2026
4 Sept 2026
15 Sept 2026
4 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 16.5 | Cum | 2,120.1 | ₹34,981.65 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil | 53.78 | Cum | 334 | ₹17,962.52 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases for columns for mass concrete. | 91.3 | Sqm | 393.2 | ₹35,899.16 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for :
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 196.2 | Sqm | 813.85 | ₹1,59,677.37 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 33.69 | Cum | 9,230.6 | ₹3,10,978.91 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 73.02 | Cum | 11,472.4 | ₹8,37,714.65 |
| 7 | 12 mm cement plaster of mix
1:4 (1 cement: 4 fine sand) | 476.17 | Sqm | 441.65 | ₹2,10,300.48 |
| 8 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.
40 mm thick with 20 mm nominal size stone aggregate | 36.8 | Sqm | 751 | ₹27,636.8 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
TenderDocument.pdf
Tender Documents • 0.80 MB
BOQ_25994.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .