Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹4.4 L (2.93%)Admitted-Finance | ₹1.5 Cr+₹4.4 L (2.93%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K SARAVANAN L2 | K SURESH L1 |
|---|---|---|---|---|---|
| 1.00 | Strengthening the road from Vengadachalapuram Rice Mill to Pachamalai Adivaram in Vengadachalapuram Panchayat km 0/0-1/20 Clearing the light jungle by uprooting including all cutting charges and depositing disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete Km 0/0-1/20 | 864 | Sqm | 5 ₹4,320 | 4.1 ₹3,542.4 Lowest |
| 2.00 | Earth work excavation in all soils such as hard grvelly soil, hard stiff clay, Stiff black cotton soil, Earth mixed with small size of boulders, with initial lead and initial lift including all labour charges etc complete. Km 0/0-1/20 | 445.5 | Cum | 95 ₹42,322.5 | 89.5 ₹39,872.25 Lowest |
| 3.00 | Picking old metalled/BT surface upto 10cm thick as directed by departmental officers. Km 0/0-1/20 | 1,507.67 | Cum | 20 ₹30,153.4 | 15.3 ₹23,067.35 Lowest |
| 4.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approed souces to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction km 0/0-1/2 | 90 | Cum | 350 ₹31,500 | 304 ₹27,360 Lowest |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-1/2 | 565.38 | Cum | 2,100 ₹11,87,298 | 1,926.1 ₹10,88,978.42 Lowest |
| 6.00 | Providing and laying of Prime Coat using Emulsion (SS1) at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 0/0-1/2 | 4,523 | Cum | 70 ₹3,16,610 | 64.49 ₹2,91,688.27 Lowest |
| 7.00 | Applying TACK COAT over WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp Km 0/0-1/20 | 4,523 | Sqm | 15 ₹67,845 | 13.5 ₹61,060.5 Lowest |
| 8.00 | Providing and laying premix carpet 20 mm consol-idated thickness using 0.18 Cum of 13.2 mm IRC size machine crushed HBG metal and 0.09 Cum of 11.2 mm IRC size machine crushed HBG metal with 14.6 Kgs of bitumen for premixing per 10 Sqm. metre of premix carpet and 0.09 Cum of 6.75 mm IRC HBG size machine crushed HBG metal with 9.80 Kg. of bitumen per 10 Sqm. of seal coat including cost and conveyance of all materials from approved sources to worksite and stacking them to standard departmental gauge for pre-measurement including bitumen which will be supplied by the department at the departmental section store at Panchayat Union Office including conveyance of bitumen from section stores to worksite and the cost of the same will be recovered from the contractors bill at the rates specified in the special condition appended herewith including heaking and mixing the materials using mini hot mix plant for premix carpet including all labour charges for spreading the same finishing to specifications, grades and cross section and consolidation by power roller including heating and sparying the bitumen for seal coat over finished permix carpet surfaces and spreading the 6.75 mm IRC chips uniformly over the surface and rolling with power roller rolling including hire and fuel charges for mini hot mix plant. power roller and all other tools and plants employed 'including all other incidental charges etc., complete. Km 0/0-1/20 | 4,523 | Sqm | 265 ₹11,98,595 | 242.7 ₹10,97,732.1 Lowest |
| 9.00 | Construction of Drain at 0-200m (200m Left side) Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation - . | 192 | cum | 200 ₹38,400 | 168 ₹32,256 Lowest |
| 10.00 | Collection and supply of sand and filling in to the basement including cost and all labours charges etc complete | 24 | Cum | 862.24 ₹20,693.76 Lowest | 862.24 ₹20,693.76 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
1 Mar 2021, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening of 4 roads in Uppiliyapuram Block in Tiruchirappalli District under Scheme Component of Pooled Assigned Revenue 2020-21 Additional Package No.3
2021_RDTN_198035_3
E1/0685/2020 Dated 19.02.2021
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.5 L
DRDA Tiruchirappalli
9 Sept 2021
24 Feb 2021
1 Mar 2021
24 Feb 2021
1 Mar 2021
24 Feb 2021
25 Feb 2021
Amount
Strengthening the road from Vengadachalapuram Rice Mill to Pachamalai Adivaram in Vengadachalapuram Panchayat km 0/0-1/20 Clearing the light jungle by uprooting including all cutting charges and depositing disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete Km 0/0-1/20
Earth work excavation in all soils such as hard grvelly soil, hard stiff clay, Stiff black cotton soil, Earth mixed with small size of boulders, with initial lead and initial lift including all labour charges etc complete. Km 0/0-1/20
Picking old metalled/BT surface upto 10cm thick as directed by departmental officers. Km 0/0-1/20
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approed souces to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction km 0/0-1/2
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-1/2
Providing and laying of Prime Coat using Emulsion (SS1) at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 0/0-1/2
Applying TACK COAT over WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp Km 0/0-1/20
Providing and laying premix carpet 20 mm consol-idated thickness using 0.18 Cum of 13.2 mm IRC size machine crushed HBG metal and 0.09 Cum of 11.2 mm IRC size machine crushed HBG metal with 14.6 Kgs of bitumen for premixing per 10 Sqm. metre of premix carpet and 0.09 Cum of 6.75 mm IRC HBG size machine crushed HBG metal with 9.80 Kg. of bitumen per 10 Sqm. of seal coat including cost and conveyance of all materials from approved sources to worksite and stacking them to standard departmental gauge for pre-measurement including bitumen which will be supplied by the department at the departmental section store at Panchayat Union Office including conveyance of bitumen from section stores to worksite and the cost of the same will be recovered from the contractors bill at the rates specified in the special condition appended herewith including heaking and mixing the materials using mini hot mix plant for premix carpet including all labour charges for spreading the same finishing to specifications, grades and cross section and consolidation by power roller including heating and sparying the bitumen for seal coat over finished permix carpet surfaces and spreading the 6.75 mm IRC chips uniformly over the surface and rolling with power roller rolling including hire and fuel charges for mini hot mix plant. power roller and all other tools and plants employed 'including all other incidental charges etc., complete. Km 0/0-1/20
Construction of Drain at 0-200m (200m Left side) Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation - .
Collection and supply of sand and filling in to the basement including cost and all labours charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complee complying with standard specifications and as directed. - .
CC 1:3:6 MIX using 40mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete for Abutement and wing .
Cost, supply and erection of steel centering for sides and soffits of all labours charges etc complete and conveyance of all materials to site and all labour charges etc
Supplying fabricating and placing in position mild steel or ribbed tor steel for reinforced cement concrete woks standard speciication (MS rodsd or RTS bars will b supplied departmentally at section stores and cost will be recovered at issue rate). The Contractor shall supply the binding wire.
Reinforce cement concrete 1:1 5:3 using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges but including curing including all labour charges etc., .
Plastering with cement mortar 1:5 mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Provision for KM Stones etc
Provision for HM Stones etc
Provision for Name Board etc complete.
Maintenance of the Kamachipuram Road in Kamchipuram Panchayat km 0/0-1/440 (R84) Clearing the scurb jungle by uprooting including all cutting charges and depositing disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete Km 0/0-1/440
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approed souces to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction km 0/0-1/0
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site km 0/0-1/0
Providing BT patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site km 0/0-1/0
Providing and laying Tack Coat over the W.B.M surface using 3.00Kg of Emulsion Bitumen as Blinder for 10Sqm. area including cost and conveyance of bitumen which will be supplied departmentaly at departmental section store at union office and cost of the same which will be recovered from the contractors bill at the rates specified in the special condition appended here with including conveyance of bitumen from section store to work site handling charges of bitumen at both ends and including all labour charges for clearing surface before the application of bitumen blinder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges bitumen sprayer (with self heating and pumping arrengment) and all other tools and plants employed and also as directly by the engineer incharge and all other incidental charges etc. complete as per clause 505 of most specification. km 0/0-1/0
Providing and laying Open Graded premix carpet 20 mm consol-idated thickness using 0.18 Cum of 13.2 mm IRC size machine crushed HBG metal and 0.09 Cum of 11.2 mm IRC size machine crushed HBG metal with 14.6 Kgs of bitumen for premixing per 10 Sqm. metre of premix carpet and 0.09 Cum of 6.75 mm IRC HBG size machine crushed HBG metal with 9.80 Kg. of bitumen per 10 Sqm. of seal coat including cost and conveyance of all materials from approved sources to worksite and stacking them to standard departmental gauge for pre-measurement including bitumen which will be supplied by the department at the departmental section store at Panchayat Union Office including conveyance of bitumen from section stores to worksite and the cost of the same will be recovered from the contractors bill at the rates specified in the special condition appended herewith including heaking and mixing the materials using mini hot mix plant for premix carpet including all labour charges for spreading the same finishing to specifications, grades and cross section and consolidation by power roller including heating and sparying the bitumen for seal coat over finished permix carpet surfaces and spreading the 6.75 mm IRC chips uniformly over the surface and rolling with power roller rolling including hire and fuel charges for mini hot mix plant. power roller and all other tools and plants employed 'including all other incidental charges etc., complete. Km 0/0-1/0
Provision for KM Stones etc
Provision for HM Stones etc
Provision for Name Board etc complete.
Strengthening the road from EAP Road to Goundapalayam R.Pudhupatty Road in Eragudi Panchayat km 0/0-1/600 Clearing the light jungle by uprooting including all cutting charges and depositing disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete Km 0/0-1/60
Earth work excavation in all soils such as hard grvelly soil, hard stiff clay, Stiff black cotton soil, Earth mixed with small size of boulders, with initial lead and initial lift including all labour charges etc complete. Km 0/0-1/60
Picking old metalled/BT surface upto 10cm thick as directed by departmental officers. Km 0/0-1/60
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approed souces to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction km 0/0-1/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-1/6
Providing and laying of Prime Coat using Emulsion (SS1) at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 0/0-1/6
Applying TACK COAT over WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp Km 0/0-1/60
Providing and laying premix carpet 20 mm consol-idated thickness using 0.18 Cum of 13.2 mm IRC size machine crushed HBG metal and 0.09 Cum of 11.2 mm IRC size machine crushed HBG metal with 14.6 Kgs of bitumen for premixing per 10 Sqm. metre of premix carpet and 0.09 Cum of 6.75 mm IRC HBG size machine crushed HBG metal with 9.80 Kg. of bitumen per 10 Sqm. of seal coat including cost and conveyance of all materials from approved sources to worksite and stacking them to standard departmental gauge for pre-measurement including bitumen which will be supplied by the department at the departmental section store at Panchayat Union Office including conveyance of bitumen from section stores to worksite and the cost of the same will be recovered from the contractors bill at the rates specified in the special condition appended herewith including heaking and mixing the materials using mini hot mix plant for premix carpet including all labour charges for spreading the same finishing to specifications, grades and cross section and consolidation by power roller including heating and sparying the bitumen for seal coat over finished permix carpet surfaces and spreading the 6.75 mm IRC chips uniformly over the surface and rolling with power roller rolling including hire and fuel charges for mini hot mix plant. power roller and all other tools and plants employed 'including all other incidental charges etc., complete. Km 0/0-1/0
Construction of Culvert at km 0/105 Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation - .
Collection and supply of sand and filling in to the basement including cost and all labours charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complee complying with standard specifications and as directed. - .
CC 1:3:6 MIX using 40mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete for Abutement and wing .
Cost, supply and erection of steel centering for sides and soffits of all labours charges etc complete and conveyance of all materials to site and all labour charges etc complete - Below sill level
Cost, supply and erection of steel centering for sides and soffits of all labours charges etc complete and conveyance of all materials to site and all labour charges etc complete - Above sill level
Reinforce cement concrete 1:1.5:3 using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges but including curing including all labour charges etc., .
Supplying fabricating and placing in position mild steel or ribbed tor steel for reinforced cement concrete woks standard speciication (MS rodsd or RTS bars will b supplied departmentally at section stores and cost will be recovered at issue rate). The Contractor shall supply the binding wire.
CC 1:2:4 MIX using 20mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete .
Provision for Bitumen pad and Kraft Paper
Provision for KM Stones etc
Provision for HM Stones etc
Provision for Name Board etc complete.
Strengthening the road from Konerippatty to Pillayarpalayam Road in Ankiyam Panchayat km 0/0-2/250 Clearing the light jungle by uprooting including all cutting charges and depositing disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete Km 0/0-2/250
Earth work excavation in all soils such as hard grvelly soil, hard stiff clay, Stiff black cotton soil, Earth mixed with small size of boulders, with initial lead and initial lift including all labour charges etc complete. Km 0/0-2/250
Picking old metalled/BT surface upto 10cm thick as directed by departmental officers. Km 0/0-2/250
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approed souces to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction km 0/0-1/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-2/250
Providing and laying of Prime Coat using Emulsion (SS1) at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 0/0-2/250
Applying TACK COAT over WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp Km 0/0-2/250
Providing and laying premix carpet 20 mm consol-idated thickness using 0.18 Cum of 13.2 mm IRC size machine crushed HBG metal and 0.09 Cum of 11.2 mm IRC size machine crushed HBG metal with 14.6 Kgs of bitumen for premixing per 10 Sqm. metre of premix carpet and 0.09 Cum of 6.75 mm IRC HBG size machine crushed HBG metal with 9.80 Kg. of bitumen per 10 Sqm. of seal coat including cost and conveyance of all materials from approved sources to worksite and stacking them to standard departmental gauge for pre-measurement including bitumen which will be supplied by the department at the departmental section store at Panchayat Union Office including conveyance of bitumen from section stores to worksite and the cost of the same will be recovered from the contractors bill at the rates specified in the special condition appended herewith including heaking and mixing the materials using mini hot mix plant for premix carpet including all labour charges for spreading the same finishing to specifications, grades and cross section and consolidation by power roller including heating and sparying the bitumen for seal coat over finished permix carpet surfaces and spreading the 6.75 mm IRC chips uniformly over the surface and rolling with power roller rolling including hire and fuel charges for mini hot mix plant. power roller and all other tools and plants employed 'including all other incidental charges etc., complete. Km 0/0-1/0
Construction of Retaining Wall at ch 1560-1590, ch 1655-1670 Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation - .
Collection and supply of sand and filling in to the basement including cost and all labours charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complee complying with standard specifications and as directed. - .
CC 1:3:6 MIX using 40mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete for Abutement and wing .
Cost, supply and erection of steel centering for sides and soffits of all labours charges etc complete and conveyance of all materials to site and all labour charges etc complete - Below sill level
Provision for Weeb holes
Construction of Protective Wall at ch 2125-2139m Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation - .
Collection and supply of sand and filling in to the basement including cost and all labours charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complee complying with standard specifications and as directed. - .
CC 1:3:6 MIX using 40mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete for Abutement and wing .
Cost, supply and erection of steel centering for sides and soffits of all labours charges etc complete and conveyance of all materials to site and all labour charges etc complete - Below sill level
Provision for KM Stones etc
Provision for HM Stones etc
Provision for Sign Board
Provision for Name Board etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K SARAVANAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.74 MB
TechBid3.pdf
Tender Documents • 0.30 MB
PriceBid3.pdf
Additional Documents • 0.21 MB
BOQ_236542.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .