| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 CrAccepted-AOC | L1 | Accepted-AOC Acceptance Cum Work Order Issued | |
| 2 | L2₹15.2 Cr+₹1.6 Cr (11.6%)Rejected-Finance PALASHBARI ROAD COOCH BEHAR PIN 736101 | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | 736101 | L2 | Rejected-Finance 2nd Lowest Bidder | |
| 3 | L3₹15.2 Cr+₹1.6 Cr (12.0%)Rejected-Finance CHANDRAKONA ROAD SATBANKURA DIST PASCHIM MEDINIPUR WEST BENGAL PIN 721253 | SATBANKURA | PASCHIM MEDINIPUR | WEST BENGAL | 721253 | L3 | Rejected-Finance 3rd Lowest Bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical Technically not qualified |
Tender Value
₹12.4 Cr
EMD Value
₹10 L
Closing Date
1 Dec 2025, 12:00 pmClosed
SE PWD NBCC_II
O/O THE SE PWD NBCC_II JALPAIGURI
Construction of new RCC pile foundation Bridge at Chainage 3.00 kmp of Matigara-Phansidewa Road in replacement of severely damaged old narrow Lachka Bridge under North Bengal Construction Division in the District of Darjeeling under RIDF-XXXI
2025_PWD_937890_1
WBPWD/SE/NBCC II/NIeT-15/2025-26
Open Tender
CIVIL WORKS
Percentage
600 days
Siliguri
Please refer Tender documents.
3 documents required · 3 mandatory
₹10 L
Yes
O/O THE SE PWD NBCC_II JALPAIGURI
27 May 2026
4 Nov 2025
3 Dec 2025
4 Nov 2025
1 Dec 2025
10 Nov 2025
7 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DISMANTLING OF EXISTING BRIDGE:-
Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD.
By Manual Means
In area of non-thorny jungle | 0.1 | Hec | 44,978 | ₹4,407.84 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD.
By Mechanical Means
Cement Concrete | 34.62 | cum | 470 | ₹16,271.4 |
| 3 | FOUNDATION WORKS:-
Earthwork in excavation of foundation trenches in all sorts of soil (including mixed soil but excluding stoney and moorum soil ) including removing, spreading or stacking the spoils within a lead of 150 meters as directed and including trimming the sides of trenches , levelling,dressing and ramming the bottom, bailing or pumping out water etc. as required complete including shoring if required .
upto 3 m depth
With pumping out water including shoring as required. | 1,306.77 | cum | 124 | ₹1,62,039.48 |
| 3.01 | Depth of excavation 3 m to 6 m below existing GL. | 1,306.77 | cum | 165 | ₹2,15,617.05 |
| 4 | Earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by Department within a lead of 150 m. | 522.71 | cum | 92 | ₹48,089.14 |
| 5 | Providing Bored Cast-in-situ R.C.C. pile in position as per specifications in all kinds of soil including cost of boring using drilling mud to stabilize the bore and flushing the bore of excess mud with freshly prepared drilling fluid by using pumps prior to placing concrete by tremie pipe in one continuous operation and including the cost of all materials and labour for placing of concrete and also including the cost of mobilization and hire charges of all equipment necessary for boring, welding of reinforcement cage as necessary and lowering of reinforcement cage, preparation and placing of concrete, including the cost of concrete and reinforcement and labour for bending binding etc. complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Work to be executed as per IS: 2911 (Part II Sec 2).
Using Mix Design Concrete Grade M-35 (Pakur Variety Course Aggregate), Cement -(OPC-53)
With Batching plant, Transit mixer and rane/Concrete Pump
Using hdraulic piling Rig
Pile Diameter -1200mm | 804 | mtr | 12,019.04 | ₹96,63,308.16 |
| 6 | Providing MS casing pipe around RCC cast-in-situ bored piles of different diameters in position including cost of all materials, fabrication, handling etc. complete as per direction of Engineer-in-Charge.
6 mm thick casing:
1200 mm. diameter pile. | 89.45 | M.T. | 63,277.1 | ₹56,59,883.49 |
| 7 | Providing and laying Design Mix Concrete for plain/Reinforced concrete work excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
Using Pakur Variety Stone Chips
M-15 Grade | 31.75 | cum | 4,941.19 | ₹1,56,892.66 |
| 8 | Cement Concrete for Reinforced Concrete in Pile Cap complete as per drawing and Technical Specification. Using Cement of (OPC-33/PSC/PPC),
Using Pakur Variety Stone Chips.
RCC Grade M-35
Using Batching Plant, Transit Mixer and Concrete Pump. | 381.02 | cum | 6,134.28 | ₹23,37,307.9 |
| 9 | Supplying, fitting and placing un -coated HYSD bar reinforcement in Bridge Foundation including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length ending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge.
Tor Steel rods / HYSD bars / TMT bars (Fe 415 /Fe 500 /Fe 500D, conforms to IS: 1786)
(SAIL/ TATA/RINL) | 246.79 | M.T. | 63,210.98 | ₹1,56,00,090.6 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.80 MB
Tendernotice_2.pdf
PDF • 3.73 MB
BOQ_2212428.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .