Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.7 L+₹881.29 (0.32%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.8 L+₹12,338.09 (4.53%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.9 L+₹17,478.96 (6.41%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹2.9 L+₹19,682.19 (7.22%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹5,900
Closing Date
11 Sept 2026, 4:00 pmClosed
Executive Engineer REW Rajouri
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
plz refer NIT
2026_RDPR_321934_48
e-NIT No. 56 REW Rajouri of 2026 Dated- 19-08-2026
Open Tender
Civil Works
Percentage
RAJOURI
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Revnue Head
₹5,900
Yes
14 Oct 2026
5 Sept 2026
12 Sept 2026
5 Sept 2026
11 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic
excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in
width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan,
including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out
excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50
metres: | 21.23 | Cum | 187.3 | ₹3,976.38 |
| 2 | Providing and laying in position cement concrete of specified
grade including curing butexcluding the cost of centring and
shuttering. All work upto plinth level with:1:5:10 (1 cement :
4coarse sand : 8 graded stone aggregate 40 mm nominal size) | 2.65 | Cum | 4,826.5 | ₹12,790.23 |
| 3 | Providing and laying in position specified grade of cement
concrete including curing but excluding the cost of centering,
shuttering, finishing. All works upto plinth level 1:3:6(1 cement : 3
coarse sand : 6 graded stone aggregate 20 mm nominal size)PLUM
@30% | 28.65 | Cum | 4,294.24 | ₹1,23,029.98 |
| 4 | centering and shuttering including removal of formwork for foundations | 55.74 | Sqm | 286.35 | ₹15,961.15 |
| 5 | Structural steel work in built up section incl cutting, hoisting &
priming coat (50x50x5)mm | 469.4 | kg | 138.2 | ₹64,871.08 |
| 6 | P/f G.I. Chainlink fabric fencing | 69.68 | Sqm | 809.9 | ₹56,433.83 |
| 7 | Carriage of Sand & agg for 20 KM by MT | 27.24 | Cum | 409.94 | ₹11,166.77 |
| 8 | Carriage of stones for 5km MT | 12.85 | Cum | 236.16 | ₹3,034.66 |
| 9 | Add Cost of CIB | 1 | No | 2,500 | ₹2,500 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.68 MB
BOQ_1081924.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .