Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC CC64 259 AXIS AZAD ROAD KALOOR ERNAKULAM KERALA 682017 | ERNAKULAM | KERALA | 682017 | L1 | Accepted-AOC L1 |
Tender Value
₹8.2 L
EMD Value
₹20,700
Closing Date
14 Mar 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
gcda office
Service lift supply conveyance installation testing and commissioning of service lift at kaloormarket building
2024_GCDA_667521_1
E1/138/2024/GCDA
Open Tender
Electrical Works
Item Rate
90 days
gcda kaloor market
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,800
₹20,700
26 Mar 2024
5 Mar 2024
15 Mar 2024
5 Mar 2024
14 Mar 2024
5 Mar 2024
Amount
Supply and Providing Lift
OD373128/2023-2024 Supply, Installation Testing and commissioning of Service liftType of Lift : Service LiftNo of Lift required :1 No (one)Capacity : V3F Dumb waiter , 1000 KgRated speed : 0.25 meter/ SecondTravel : 6 Mts ApproximateNo of floor & Entrance served :G +1 Upper floor, 2 openings No of Floors served: 2 FloorsType of Drive : Variable speed Variable Frequency ( VVVF) Imported Method of control : Microprocessor Down Collective Machin Room / Machin Type : With out Machine Room Size of Lift well :2500mmx 1800 mm Size of platform :As per ISS Flooring : MS Chequered plate flooring Car Enclosur: MS Powder coatedCar Entrance : Manual imperforated opening door (1100mm W X 1800 mm H))Ground floor openging in front side and First floor opening in back side of the car.Call & Position indicators :Indicators provided all landings. Electric Supply :Suitable for operating 415 V Three phase, 50 Hz.a) Push button for door.Winding Handle : Manual winding wheel in case of an emergency.Safeties 1) over speed governor2)Safety gear buffers.3)Motor over speed protection4)Phase reversal protection5)Final limit switches6) other safeties as per ISS 7) Single phasing preventerLeveling : Automatic leveling at all landingControl Panel :Control panel shall be accommodate in dust and vermin proof sheet metal enclosure.Tests :At site tests as per IS 14665/2001 to be carried out before handing over. Door opening : Infra red door opening system to be Provided for the entire length.ARD :Automatic rescue device with an electronic controller and with necessary maintenance free batteries. The rescue operation shall act with in 10 seconds of power failure. make : johnson ,KONA ,axis ,infra or equivalent. Scope of work :1) Supply of Lift materials 2) Minor civil works such as construction of buffer block in the pit, machine foundation in the machine room. necessary foundation for mounting the control panel,cutting pockets and brackets for guide rails, grouting boxes for control units in the front side etc. This does not include correction of wall opening on the front side of the wall.3) Scaffolding4) Door frames5) Supporting steel6)Supply of booklet with complete details of maintenance schedule and controldiagram.7) Giving training to dept. staff for attending troubleshooting.8) Obtaining scheme approval as well as energization certificate from elec.Inspectorate of necessary drawing for the same. Necessary fee shall be remitted to the inspectorate by the firm for which no refund will be made from the department9) Free servicing for 12 months after handing over.Guarantee : Company shall carry out free maintenance during warranty period whichhall include.1) Cleaning lift equipment.2) Lubricating all reqd. parts.3)Replacing of lubricating oil as and whenrequired.4) Checking and adjusting contacts.5) Replacing fusible items, alarm etc.6)Recharging / replacing batteries in case of such requirements7) replacing / rewinding motor if required.8) Replacing / renewing all defective parts of the lift including V3F unit if foundnecessary.
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1037378.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .