Tender ID
Tender Value
₹7.8 Cr
EMD Value
₹15.5 L
Closing Date
10 Jun 2026, 3:00 pmClosed
NITIN KUMAR
Executive Engineer
Jagjivan Nagar
DAYASHANKAR PRASAD
CHIEF ENGINEER (DESIGN)
Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations PRD Left Out Tola under ''Har Ghar Nal Ka Jal'' nischay yojna in areas having no ground water quality issues; with Electric driven Pumps in District West Champaran, Bihar on turn-key basis with 03 months Trial Run Period (including Electricity Bill of the trail run period) under Mukhya Mantri Grameen Payjal Nishchay Yojna (Non Quality Affected). Under P. H. Dvision, Bettiah in Block Bairiya Group 3
132592
NIT-21 R6/2024-25/BETTIAH/group 3
Short Tender
CIVIL
Pashchim Champaran
• Bids shall remain valid for a period not less than 180days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive
• bid security
• Legal Status of Bidder.
• Registration of appropriate class in Govt. of Bihar
• Principal place of Business
• Power of attorney of signatory Bid
• Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). Balance Sheet & Profit & Loss Statement issued by C.A.
• Work Experience of Similar nature (Satisfactory completed atleast one water supply scheme and its maintenance work of value not less than 10% of estimated value of contract (Rs. In Lakh) along with this attachment for experience as per clause 4.5.A(c) is mandatory.
• Bid Capacity---
Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum value of civil engineering works executed in any one year during the last five years (updated to the price level of the year indicated in Appendix) taking into account the completed as well as works in progress. ,N=Number of years prescribed for completion of the works for which bids are invited. (Design Build Period for which BID is invited), B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next 12 months. (Rs. In Lakhs)
• Existing commitments and ongoing works
• Work for which Bid already submitted
• Provide it as per notes to tender/Bid documents. Availability of key items of Contractor's Equipment.
• Key Personnel as per bid document
• Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs).
• Proposed methodology and programme of construction.
• Litigation History---
Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not)
• Affidavit----
Regarding statements made in the required attachments are true and correct. All other type of affidavit.
• Undertaking---
Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract.(Rs. In Lakhs)
• pan card
• gst with current return file
• Time of completion- 6 months
CIVIL
ITEM RATE
L1
1
24 documents required · 24 mandatory
₹10,000
Processing Fee: 5900
₹15.5 L
office of executive engineer ph division bettiah
1 Jun 2026
1 Jun 2026
10 Jun 2026
1 Jun 2026
10 Jun 2026
1 Jun 2026
3 Jun 2026
TENDER NIT No –21/2024-25/(LoT/PRD)
Name of Work Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations PRD Left Out Tola under ''Har Ghar Nal Ka Jal'' nischay yojna in areas having no ground water quality issues; with Electric driven Pumps in District West Champaran, Bihar on turn-key basis with 03 months Trial Run Period (including Electricity Bill of the trail run period) under Mukhya Mantri Grameen Payjal Nishchay Yojna (Non Quality Affected). Under P. H. Dvision, Bettiah in Block Bairiya Cost of Work as per BOQ (Rs in Lakhs) 775.68 Time of Completion in months 6 ALL COLOURED CELL TO BE FILLED ACCORDINGLY
As per Technical Approval Date of Tender 20.01.2025
Sl No. Items Requirement Requirement Cl. No.
Name of the Contractor
Address of the Contractor
1 Bid Validity Bids shall remain valid for a period not less than 180days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days 15.1 Page-30 Bid validity period In days
2 Bid Security a) Through online mode. Or b) Unconditional bank guarantee from any scheduled Indian bank issued within the state in the format given (If issued from any bank outside state will be converted to any bank within the state before executing the agreement, duly pledged in favour of the Executive Engineer, PHED Division, Bettiah 16.1 Page-31 Amount To be entered (Rs in Lakhs)
Bid Security Amount - (Rs. In Lakhs) Bid Security Amount - (Rs. In Lakhs) 0
3 (i) Legal Status of Bidder. 4.3(a) Page-20
(ii) Registration of appropriate class in Govt. of Bihar
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached or Not 4.2(iv) Page-20
4 Total value of civil engineering construction work performed in last five years. Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). Balance Sheet & Profit & Loss Statement issued by C.A. 4.5A (a) Page-25
2019-20 Amount To be entered (Rs in Lakhs) 0
Escalation Factor= 1.47
2020-21 Amount To be entered (Rs in Lakhs) 0
Escalation Factor= 1.36
2021-22 Amount To be entered (Rs in Lakhs) 0
Escalation Factor= 1.26
2022-23 Amount To be entered (Rs in Lakhs) 0
Escalation Factor= 1.17
2023-24 Amount To be entered (Rs in Lakhs) 0
Escalation Factor= 1.08
5 Work Experience of Similar nature Work Experience of Similar nature (Satisfactory completed atleast one water supply scheme and its maintenance work of value not less than 10% of estimated value of contract (Rs. In Lakh) 4.5A (b) Page -25 Amount To be entered (Rs in Lakhs)
6 Bidding Capacity: Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum value of civil engineering works executed in any one year during the last five years (updated to the price level of the year indicated in Appendix) taking into account the completed as well as works in progress. ,N=Number of years prescribed for completion of the works for which bids are invited. (Design Build Period for which BID is invited), B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next 12 months. (Rs. In Lakhs) 4.7 Page-26 Amount To be entered (Rs in Lakhs) 0
7 (a) Existing commitments and ongoing works Page - 43 Amount To be entered (Rs in Lakhs) 0
(b) Work for which Bid already submitted Page - 43 Amount To be entered (Rs in Lakhs) 0
8 Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required Nos. Max. Age 4.5(B) (a) Page-40 Annexure-I Nos./ Max. Age
Concrete Mixer 2 5
Rotary Drilling / Reverse Rotary / DTH Rig Machine 1 5
Truck/Tractor with trailer 1 5
Hydraulic Excavator 1 5
9 Key Personnel Particulars 2-10 Crores 4.5(B) (b) Page-40 Annex-II Name of the Personnel and Experience in years
Project Manager B.E. Civil + 10Years Exp. (5 years as Manager in PHED works) or retired E.E. & above of PHED 1
Site Engineer B.E. Civil + 07Years Exp. (3 years as Manager in PHED works) or retired A.E. & above of PHED 2
Site Supervisor B.E. Mech./Civil + 05 Years Exp. Or Dip. Mech./Civil + 07 years Exp. Or or retired J.E. & above of PHED 6
Surveyor B.E. Civil + 03 Years Exp. orDip. Civil + 05 years Exp. 1
10 Evidence of accesses to Financial Resources Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). Page 21 4.3 (g) Amount To be entered (Rs in Lakhs)
11 Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) Page 21 4.3 (l)
12 Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) Page 44
13 Affidavit Regarding statements made in the required attachments are true and correct. All other type of affidavit. Page 44
14 Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract.(Rs. In Lakhs) 25 % of B.O.Q. Amount Page 44
17 Time of Completion 06 Months To be entered in months
Executive Engineer
P.H.Division, Bettiah
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for purposes of post qualification as provided for in Clause 4 of the Instructions to Bidders. This information will not be incorporated in the Contract.
NAME OF THE CONTRACTOR
1 For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach copy)
Place of registration :
Principal place of business :
Power of attorney of signatory of Bid (Attach)
1.2 Total value of Civil Engineering construction work performed in the last five years** (in Rs. Million)
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub- contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all oth
NAME OF THE CONTRACTOR
Project Name Name of the Employer* Description of work Contract No. Value of Contract (Rs. In Crore) Date of issue of work order Stipulated period of completion Actual date of completion* Remarks explaining reasons for delay & work completed)
* Attach certificate(s) from the Engineer(s)-in-Charge
** Immediately preceding the financial year in which bids are received.
Attach certificate from Chartered Accountant.
1.3.2 Quantities of work executed as prime contractor, work performed in the past as a nominated sub-contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all other qualification criteria are satisfied (in the same name and style) in the last five years.
NAME OF THE CONTRACTOR
Year Name of the work Name of the Employer* Quantity of work performed
Remarks* (indicate contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
NAME OF THE CONTRACTOR
Description of works Place & State Contract No. Name & Address of Employer Value of Contract (Rs Cr) Stipulated Period of Completion Value of works* remaining to be completed (Rs Cr) Anticipated date of completion
* Attach certificate(s) from the Engineer(s)-in-Charge
The item of work for which data is requested should tally with that specified in ITB clause 4.5A ©
** Immediately preceding the financial year in which bids are received.
# Delete, if prequalification has been carried out.
(B) Works for which bids already submitted :
Description of works Place & State Name & Address of Employer Estimated value of works (Rs Cr) Stipulated period of completion Date when decision is expected Remarks, if any
1.5 Availability of key items of Contractor’s Equipment essential for carrying out the Works [Ref. Clause 4.5(B)(a)]. The Bidder should list all the information requested below. Refer also to Sub Clause 4.3 (d) of the Instruction to Bidders.
NAME OF THE CONTRACTOR
Description of works Requirement Availability proposals Remarks (from whom to be purchased)
No. Capacity Owned/Leased to be procured Nos./Capacity Age/ Condition
1.6 Qualifications and experience of key personnel required for administration and execution of the Contract [Ref. Clause 4.5(B)(b)]. Attach biographical data. Refer also to Sub Clause 4.3 (e) of instructions to Bidders and Sub Clause 9.1 of the Condition
NAME OF THE CONTRACTOR
Position Name Qualification Year of Experience (General) Years of experience in the proposed position
1.7 Proposed sub-contracts and firms involved. [Refer ITB Clause 4.3(k)]
NAME OF THE CONTRACTOR
Sanction of the works Value of Sub-contract Sub-contractor (Name & Address) Experience in similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary work/ building electrification works [Reference Clause 4.5(d) & Clause 4.5(e)]
*1.8 Financial reports for the last five years: balance sheets, profit and loss statements, auditors' reports (in case of companies/corporation), etc. List them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines of credit, etc. List them below and attach copies of support documents.
1.10 Name, address and telephone, telex and fax numbers of the Bidders' bankers who may provide references if contacted by the Employer.
1.11Information on litigation history in which the Bidder is involved.
NAME OF THE CONTRACTOR
Other Party(ies) Employer Cause of Dispute Amount involved Remarks showing Present Status
1.12 Statement of compliance under the requirements of Sub Clause 3.2 of the instructions to Bidders. (Name of Consultant engaged for project preparation is ** ........................ …………….............................)
Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as necessary to comply with the requirements of the Bidding documents. [Refer ITB Clause 4.1 & 4.3(1)]
1.15 Quality Assurance Programme
2 Additional Requirements
2.1 Bidders should provide any additional information required to fulfill the requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
*** (iii) Update of original prequalification application
*** (iv) Copy of original prequalification application
*** (v) Copy of prequalification letter
* Delete, if prequalification has been carried out.
** Fill the Name of Consultant.
*** Delete, if prequalification has not been carried out.
Check List for Submission Of Tender
Evaluation will be done as per the information provided in the document attached with tender. Bidder may disqualified, if documents are not attached properly.
Name of the Bidder
Sl. No. Checklist Items (Attach Documents in Edit Attachment Folder) Document attached
1 Registration Paper (Agency must be registered in PHED Bihar of appropriate class)
2 Bid Security Amount (Rs. In Lakh)
5 Charactar certificate
6 LAST 5 YEARS ANNUAL TURN OVER
7 EXPERIENCE Of SIMILAR NATURE Of W0RKS
8 QUANTITY OF WORK OF SIMILAR NATURE EXECUTED DURING LAST 5 YEARS)
9 BALANCE VALUE OF ON GOING WORKS
10 EXISTING COMMITMENTS
11 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES
14 LITIGATION HISTORY
15 PLANT and MACHINARIES
16 KEY PERSONNEL
17 PROGRAMME Of CONSTRUCTION
18 NOC FOR DEBAR
IF YOU HAVE NOT BEEN DEBARED WRITE "NOT APPLICABLE" IN YOUR LETTER HEAD SCAN AND UPLOAD IN THE IN NOC FOR DEBAR LINK
Note:-Attachment should be self attested and should be attached as per above instruction, otherwise it may be rejected.
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and correct.
Signature & Seal of the Bidder
Financial Bid Sheet Group 03
NAME OF WORK:- Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations PRD Left Out Tola under ''Har Ghar Nal Ka Jal'' nischay yojna in areas having no ground water quality issues; with Electric driven Pumps in District West Champaran, Bihar on turn-key basis with 03 months Trial Run Period (including Electricity Bill of the trail run period) under Mukhya Mantri Grameen Payjal Nishchay Yojna (Non Quality Affected). Under P. H. Dvision, Bettiah Bairiya.
Date of Tender :- 20.01.2025
Estimated Cost (Including GST 18% (Multiplyimg factor 1.0536):- Rs.77,567,530.00
Earnest Money :- Rs.1,552,000.00
Time of Completion :- 6 MONTHS
Cost of BSEDC Bid processing fee:- As Per Online
Cost of BOQ :- Rs 10,000.00 (to be paid online)
Name and Address of the Bidder
Sl. No. Particulars Rate in Rs. Qty. Unit Amount in Rs
ITEM WISE COST BREAKUP FOR
SECTION – A : EXECUTION PART
1 Construction of 150mm x100mmx125m deep T/W etc. all complete and as per direction of E/I. Using U.P.V.C. Pipe & Strainer etc. all complete and as per direction of E/I. 16 Each Rs.0.00
Construction of 125mm x75mmx125m deep T/W etc. all complete and as per direction of E/I. Using U.P.V.C. Pipe & Strainer etc. all complete and as per direction of E/I. 21 Each Rs.0.00
2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, and RCC top slab 1:1.5:3 mix (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size ) , necessary excavation, foundation concrete 1:2:4(1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3coarse sand) 12 mm thick with 5% cico fnished with a floating coat of neat cement, out side plastering with cement mortar 1:4 (1 cement : 4coarse sand) 12 mm thick complete as per standard specifications & direction of E/I. 37 Each Rs.0.00
3a Supply Installation, commissioning and testing of single phase 3HP submersible pump set of different capacity of KSB/ Kirloskar or equivalent make with all accessories & fittings etc including loading unloading and transportation of the pump set to the work site with all required labour, materials, tools and tackles installation, testing & commissioning as per standards specifications and direction of E/I. 16 Each Rs.0.00
3b Estimate for supply, installation & commissioning of single phase 2 H.P submersible motor pump set with all accessories including extension of L.T. line from nearest source up-to pumping station. 21 Each Rs.0.00
4 Supplying all materials and Laying of distribution network including placing of 10000 litres PVC tank as per the directions of Engineer in Charge including Earthwork in 30m wide and 1.1m deep trenches, Including crossing of ditches Road cutting and restoration and backfilling the trenches after laying of line, providing and laying HDPE pipe of 75 mm dia and 63 mm dia of (PE-PN10 rating) as per IS 4984/1995 and 50 mm and 40mm dia pipe (PE100-PN8 rating) as required including supplying all jointing materials etc. including all taxes, duties etc.-and incidental charges providing necessary thrust block where as required, construction of brick masonry chamber (60cm x 60cm x 75cm) for valves with cost of certification mark and fixing in trenches including the cost of fullway valves, earth work in back filling the trenches after laying of different types and sizes of pipe, fittings and valves with earth removed during excavation within initial lead and lift etc. including providing night guard, barrier and red light to safe guard against accident, testing of laid pipes etc. all complete job as per specification and direction of E/I.
G.I PIPE INCLUDING G.I FITTING
80 mm dia nominal bore from PVC tank to Distribution main 37 PM Rs.0.00
65 mm dia nominal bore used for washout and overflow from PVC Tank 74 PM Rs.0.00
50mm dia Pipe from T/well to PVC Tank 37 PM Rs.0.00
HDPE PIPE AND FITTING
90mm PE 100-PN10 4661 PM Rs.0.00
75mm PE 100-PN10 9314 PM Rs.0.00
63mm PE 100-PN10 11651 PM Rs.0.00
50mm PE 100-PN8 16301 PM Rs.0.00
40mm PE 100-PN8 4641 PM Rs.0.00
5 Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm GI Pipes with all fittings etc all complete. (Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm CPVC Pipes with all fittings etc all complete 3125 Each Rs.0.00
6 Providing and erecting 8M high staging with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per drawing attached. and installation of 10000 Liter PVC Water Tank. 26 Each Rs.0.00
6b Construction of 2.10x2.40mx2.40m high of attendent cum chlorinator room 11 Each Rs.0.00
7 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl). 37 Each Rs.0.00
8 Surveying and levelling using Total Station/DGPS or auto level instruments of the project area including transfer of relevant bench mark to establish the levels of strategic points at the selected position of the T/Well, pumping station & attach the surveying data sheet with design & drawing of pipe line, map of location of HYDT & Steel structure etc. all complete work. 46.568 P/KM Rs.0.00
9 Cost of Applying for Taking Electricity connection including installation of Electric Meter on the scheme. 37 Each Rs.0.00
10 Cost for Electricity charges for a period of 3 months ( TRC) [ FOR 2hp] 21 Each Rs.0.00
11 Cost for Electricity charges for a period of 3 months ( TRC) [ FOR 3hp] 16 Each Rs.0.00
12 For 2 PPM & 30% Chlorine solution of { Total population served ( say = 400 nos. (avg.) / scheme )} *81*2/1000000)*(100/30)*3months*30* No.of schemes 759.375 Each Rs.0.00
Sub Total-(SECTION-A) Rs.0.00
Bidders are required make the entries in the coloured cells only.
Any existing work such as t/w / pipe line or others is in workable condition then that component will be used and new construction (duplicacy of any component) will not be allowed for that work.
PUBLIC HEALTH ENGINEERING DEPARTMENT
P.H. DIVISION BETTIAH
Sl No Block Panchayat Tola Ward 150x100 x125 GPT BORE 125x75x125 GPT BORE Motor 3H.P Motor 2H.P Distribution (in Meter) PVC TANK (10000Ltr) House connection 8 m steel staging Attendent room cum Chlorinator chlorinator
Total Length 90 mm 75 mm 63 mm 50 mm 40mm
1 BAIRIYA SURYAPUR GOBRAHI BIN TOLA AHIR TOLA 10 1 0 1 0 1307 131 261 327 457 131 1 110 1 0 1
2 BAIRIYA SURYAPUR GOBRAHI MUSHAR TOLI 9 1 0 1 0 1290 129 258 323 452 128 1 100 1 0 1
3 BAIRIYA LAUKARIYA DHUNIYA TOLA 12 0 1 0 1 538 54 108 135 188 53 0 26 0 1 1
4 BAIRIYA FULIYAKHAR BIN TOLA 11 1 0 1 0 1547 155 309 387 541 155 1 110 1 0 1
5 BAIRIYA FULIYAKHAR DHOBI TOLA 9 0 1 0 1 706 71 141 177 247 70 0 38 0 1 1
6 BAIRIYA FULIYAKHAR BRITI TOLA 6 1 0 1 0 1598 160 320 400 559 159 1 160 1 0 1
7 BAIRIYA TUMKARIYA PATHKHAULI 1 1 0 1 0 1601 160 320 400 560 161 1 125 1 0 1
8 BAIRIYA FULIYAKHAR HARIJAN TOLA 8 P2 0 1 0 1 1298 130 260 325 454 129 1 77 1 0 1
9 BAIRIYA SOUTH PATJIRWA JIRAHIYA 3 0 1 0 1 960 96 192 240 336 96 0 37 0 1 1
10 BAIRIYA SOUTH PATJIRWA NITISH NAGAR 1 P1 0 1 0 1 858 86 172 215 300 85 0 43 0 1 1
11 BAIRIYA SOUTH PATJIRWA JIRAHIYA 2 0 1 0 1 1350 135 270 338 473 134 0 50 0 1 1
12 BAIRIYA MIYAPUR BADA DUBAULIYA 7 1 0 1 0 1235 124 247 309 432 123 1 110 1 0 1
13 BAIRIYA MIYAPUR MANTAGU RAM KA TOLA 7 0 1 0 1 1220 122 244 305 427 122 1 70 1 0 1
14 BAIRIYA MIYAPUR BHERIHARWA 6 1 0 1 0 1510 151 302 378 529 150 1 135 1 0 1
15 BAIRIYA MIYAPUR NAYA BASTI 3 1 0 1 0 1470 147 294 368 515 146 1 120 1 0 1
16 BAIRIYA BHITAHA KHUSHI TOLA 5 1 0 1 0 1323 132 265 331 463 132 1 100 1 0 1
17 BAIRIYA BHITAHA NEW COLONY 4 0 1 0 1 1370 137 274 343 480 136 1 95 1 0 1
18 BAIRIYA BHITAHA HAAT SARAYA 3 1 0 1 0 1515 152 303 379 530 151 1 110 1 0 1
19 BAIRIYA BHITAHA HAAT SARAYA 2 1 0 1 0 1550 155 310 388 543 154 1 125 1 0 1
20 BAIRIYA BHITAHA HAAT SARAYA 1 0 1 0 1 1525 153 305 381 534 152 1 65 1 0 1
21 BAIRIYA MALAHI BALUA BRAHAMSATHAN TOLA 18 0 1 0 1 917 92 183 229 321 92 1 60 1 0 1
22 BAIRIYA TADHWANANDPUR MALAHI TOLA 1 0 1 0 1 960 96 192 240 336 96 1 70 1 0 1
23 BAIRIYA BAGAHI RATANPUR BAGAHI BARWA TOLA 14 0 1 0 1 810 81 162 203 284 80 0 41 0 1 1
24 BAIRIYA BAGAHI RATANPUR BAGAHI KAJU TOLA 13 1 0 1 0 1740 174 348 435 609 174 1 110 1 0 1
25 BAIRIYA BAIRIYA GOSAI TOLA 10 0 1 0 1 1220 122 244 305 427 122 1 95 1 0 1
26 BAIRIYA BAIRIYA DHORAHOYA TOLA 3 0 1 0 1 620 62 124 155 217 62 0 32 0 1 1
27 BAIRIYA BAIRIYA NITISH NAGAR 1 0 1 0 1 890 89 178 223 312 88 0 35 0 1 1
28 BAIRIYA BAIRIYA DHORAHOYA TOLA 2 0 1 0 1 810 81 162 203 284 80 0 48 0 1 1
29 BAIRIYA PAKHNAHA DUMARIYA MOTIPUR CHHOTA TOLA 17 1 0 1 0 1377 138 275 344 482 138 1 100 1 0 1
30 BAIRIYA PAKHNAHA DUMARIYA POKHARIYA TOLA 13&14 0 1 0 1 1007 101 201 252 352 101 0 47 0 1 1
31 BAIRIYA SISWA SARAIYA TURHAPATTI 14 0 1 0 1 1388 139 278 347 486 138 0 50 0 1 1
32 BAIRIYA SISWA SARAIYA BARWA BADI MUSHHARI TOLA 4 1 0 1 0 1863 186 373 466 652 186 1 135 1 0 1
33 BAIRIYA TADHWANANDPUR TINTOLIYA TOLA 3 0 1 0 1 1395 140 279 349 488 139 1 75 1 0 1
34 BAIRIYA MALAHI BALUA BALUA KOIRI TOLA 13 0 1 0 1 1350 135 270 338 473 134 1 91 1 0 1
35 BAIRIYA MALAHI BALUA BALUA KANU TOLA 12 1 0 1 0 1550 155 310 388 543 154 1 125 1 0 1
36 BAIRIYA MALAHI BALUA RAMPURWA BARAHMSATHAN 19 0 1 0 1 1300 130 260 325 455 130 1 85 1 0 1
37 BAIRIYA MALAHI BALUA BALUA LOHAN TOLA 6 1 0 1 0 1600 160 320 400 560 160 1 120 1 0 1
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 21R6 of 24-25 PRD LOT.pdf
NIT • 3.69 MB
TECHNICAL BID-GR.NO.-03 (1).xls
NIT • 0.16 MB
Standard Bidding Doc_leftover tolas_PRD 03.doc
NIT • 1.47 MB
NIT 21R6 of 24-25 PRD LOT.pdf
NIT • 3.69 MB
GR 03 Financial Bid.xlsx
NIT • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .